{"as_of":"2026-08-08T09:33:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:9e66db6d102a863a9d655378d87c4655ff1729e69b6910820dea4eb9ca27eaff","coverage":[{"denominator":24,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":24,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T11:35:51.322329Z","state":"measured"},{"denominator":24,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":24,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.02234/citation-record","integrity":"/paper/2506.02234/integrity","json":"/paper/2506.02234/citation-record.json","paper":"/paper/2506.02234"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.554485Z","title":"Risk analysis and management in power outage and restoration: A literature survey,","venue":null,"work_id":"c81cdd4e-7390-4619-9f1f-0378492e9858","year":2014},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.056108Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:b37c3bc95831ae7570c750b749abebfe3265d58f7835cb462b9e0f5f3f2b3163","observation_id":"e62a7946-8c41-4efa-8c72-3f58c1139e60","resolution":{"observed_at":"2026-08-07T11:35:51.558064Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.154432Z","title":"An integrated approach for power system restoration planning,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.154432Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:b1b0b23be1b90afdfb601b0e063c76a394df237e8938472582ed3d7c0a8eb198","observation_id":"c4d3b92c-41e5-4d89-9fa5-922edd7a7a71","resolution":{"observed_at":"2026-08-07T11:35:51.154432Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.540059Z","title":"Balancing wildfire risk and power outages through optimized power shut-offs,","venue":null,"work_id":"a08f0034-63c2-4ab5-8845-e37650f8a214","year":2020},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.158425Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:8c4fe4ad5eaa8956fa08ccabafbfbf996b760565bfa4a28596421770219db200","observation_id":"ffa317f8-0055-4845-9ae8-4825c44cab9b","resolution":{"observed_at":"2026-08-07T11:35:51.542758Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.531314Z","title":"Relax- ations of ac maximal load delivery for severe contingency analysis,","venue":null,"work_id":"547d705e-d570-49cc-b587-d594da13bbaf","year":2019},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.173190Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:dd4c91d11ea69f3710e59aeb889b227a532e0cc27f39193046613cabf54bc3a3","observation_id":"f244a75e-1618-4334-b71b-e6aee3870662","resolution":{"observed_at":"2026-08-07T11:35:51.534146Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.522486Z","title":"Transmission system repair and restoration,","venue":null,"work_id":"b0e09e93-bb08-4edd-9e04-133bb2da80ab","year":2015},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.196019Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:33510e2aaaa04ec0c1eb40b66f313ee439498f71fb29a4b49bfa2471ddce10ed","observation_id":"041c02a7-94cc-41ce-8d68-42ed4f604fbd","resolution":{"observed_at":"2026-08-07T11:35:51.525838Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.513735Z","title":"Long solution times or low solution quality: On trade-offs in choosing a power flow formulation for the optimal power shutoff problem,","venue":null,"work_id":"9eb93e0e-80f5-4285-a7d9-957367f59c6d","year":2024},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.215792Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:094816342b333dc6087b5de5747b0f75c94d39bb8e3d367793831506a05040c2","observation_id":"6dd95c55-d4bf-4bb4-8149-aaa87e1796ea","resolution":{"observed_at":"2026-08-07T11:35:51.516884Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.504358Z","title":"Powermodel- srestoration. jl: An open-source framework for exploring power network restoration algorithms,","venue":null,"work_id":"bd523a3d-cdf7-44be-8fc0-fd4e8276ee3a","year":2021},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.236976Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:b42687669eea4c215a24a5cb6f1e228e2d0a9b8f9060e141a8c62de52a0ba8e4","observation_id":"6f7a94d3-4e8f-4851-b351-667ddce97bb9","resolution":{"observed_at":"2026-08-07T11:35:51.507351Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.494866Z","title":"Sharing the load: Considering fairness in de-energization scheduling to mitigate wildfire ignition risk using rolling optimization,","venue":null,"work_id":"049064e5-40ef-4834-b78d-de58322795dd","year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.254421Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:11d12809b25894f3854f950193ea45075709a2628325787eb89a8ed368024f87","observation_id":"242f380a-7cb3-4c42-a3bc-1c4bff7bde39","resolution":{"observed_at":"2026-08-07T11:35:51.498473Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.484727Z","title":"Security constrained optimal power shutoff for wildfire risk mitigation,","venue":null,"work_id":"c4f6fb0e-cc8c-46c5-911c-a544ec8d37be","year":2024},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.266366Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:b23e726a159ae73c9f260cf8f7a24936034161147218a3ecc4eaf2382cd9e05f","observation_id":"516b4903-88c7-4a32-91d0-63320c177533","resolution":{"observed_at":"2026-08-07T11:35:51.488793Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.474880Z","title":"Co-optimization of power line shutoff and restoration under high wildfire ignition risk,","venue":null,"work_id":"d1d64906-8e2d-424b-a48f-b6a1292ac3ac","year":2023},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.269912Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:3de764f0ef86df15e29f07a805891f30960ed4fe51f1c50df639758b4172652f","observation_id":"b876c2aa-be04-45b9-9b6d-79a7fb706875","resolution":{"observed_at":"2026-08-07T11:35:51.478230Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.466282Z","title":"A framework for risk assessment and optimal line upgrade selection to mitigate wildfire risk,","venue":null,"work_id":"47b4b852-052a-45c8-a420-f2cf45225d1b","year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.273585Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:bd7e4ce7537cdc4395386cc691a6a14ec40a44daae4af366f768b1fe08014ddf","observation_id":"216972cd-48dd-49fd-adcd-54f256b67264","resolution":{"observed_at":"2026-08-07T11:35:51.469353Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.457374Z","title":"Transmission system expansion planning under wildfire risk,","venue":null,"work_id":"73ceec5a-4af9-466b-96a2-1a3e098276a0","year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.277307Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:dc0715187989ff608065885bdb102ed2fa4569ab62c2dcf33231a7f03828657d","observation_id":"3063d3a8-e3c8-4387-88e1-25ae442360aa","resolution":{"observed_at":"2026-08-07T11:35:51.460667Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.448664Z","title":"Resilient expansion planning of electricity grid under prolonged wildfire risk,","venue":null,"work_id":"0609ad24-a205-4cda-ad56-f2f5df50b896","year":2023},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.281418Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:69bfb07091b30e9aff1f9ee273625f94b4d8a00bb4d45451dad296d140f6cdd2","observation_id":"b4d6efd3-d223-49ae-8753-de412ec2b1d8","resolution":{"observed_at":"2026-08-07T11:35:51.451676Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2203.10176","last_updated":"2022-07-12T19:40:11Z","snapshot_observed_at":"2026-07-06T12:49:43.715551Z","submitted_at":"2022-03-18T22:02:24Z","title":"Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2203.10176","snapshot_observed_at":"2026-08-07T11:35:51.286119Z","title":"Optimizing transmission infrastructure investments to support line de-energization for mitigating wildfire ignition risk,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.286119Z"},"links":{"cited_paper":"/paper/2203.10176","citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:eaa49c08c5d982677596e3e17eb1d9d3c999e2d5851225d0ba27f4519098007e","observation_id":"a5b8cc64-1a13-428e-bc52-d2bcef36eaf7","resolution":{"observed_at":"2026-08-07T11:35:51.286119Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.439518Z","title":"Managing power systems- induced wildfire risks using optimal scheduled shutoffs,","venue":null,"work_id":"874702f9-8cc9-4cf4-b40a-53e84fdc0c5f","year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.290670Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:8c1514e2c912c20e5cc3cc91dd66cc492564c58daac6ffc3d4f604f56d49870e","observation_id":"02ab6314-092d-4e93-bfff-63d999638985","resolution":{"observed_at":"2026-08-07T11:35:51.442968Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.293981Z","title":"Resilient by design: Preventing wildfires and blackouts with micro- grids,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.293981Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:50a943adb89ef100cb7090ef1c31c412384863725ec5e74090ca029567d6a25e","observation_id":"0115eee7-9303-44d5-8145-eae808591634","resolution":{"observed_at":"2026-08-07T11:35:51.293981Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.423301Z","title":"Optimal investment in microgrids to mitigate power outages from public safety power shutoffs,","venue":null,"work_id":"0bd08571-593d-4f62-b053-650cd2cdfcc6","year":2021},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.299369Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:997a3813030263f4ed52c81cdcb80e6779d48d44410208a0db738405034a6697","observation_id":"67f442cf-0c3b-4a58-b8b3-e7d13025cc53","resolution":{"observed_at":"2026-08-07T11:35:51.426728Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.413055Z","title":"Multistage stochastic program for mitigating power system risks under wildfire disruptions,","venue":null,"work_id":"7398996d-0c09-4619-a1f0-5edcd314b824","year":2024},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.302234Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:753dce315f6d98782c069353eba03ddb6b9484a4fb73b857699a5bfe1e7bbf09","observation_id":"2167cf06-8f29-493e-a1a3-2d7bacdc05f9","resolution":{"observed_at":"2026-08-07T11:35:51.416686Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.403706Z","title":"Multi- period power system risk minimization under wildfire disruptions,","venue":null,"work_id":"42831571-01c8-4745-8796-c120cd5b5599","year":2024},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.305310Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:b227f2534482307c7058ff431eebf61db6d364c6b9231cb2f130a6fe67462676","observation_id":"69c9ef0a-97a0-4342-9d91-0940c9739c37","resolution":{"observed_at":"2026-08-07T11:35:51.406791Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.394323Z","title":"Mitigating the impact of uncertain wildfire risk on power grids through topology control,","venue":null,"work_id":"e6957ddf-7b2f-4d29-a427-ee3c18f2dd86","year":2024},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.308712Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:5ea7744e619f3920b3776ef9c3ce5e3c26443c44bea483b7d81f32d672052d06","observation_id":"d40e98ba-e945-425b-9c15-e8bbbd24b7eb","resolution":{"observed_at":"2026-08-07T11:35:51.397257Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.384682Z","title":"Data- driven power system optimal decision making strategy underwildfire events,","venue":null,"work_id":"e6bd2f42-7281-49e2-b522-bb7c286359e2","year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.312243Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:d40ccad76ca0ae494f177a6f04ebf44d890191191332fd95cd612659434c599c","observation_id":"44bdc128-d485-4c2d-bd7a-3fe03df31f52","resolution":{"observed_at":"2026-08-07T11:35:51.388122Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.375103Z","title":"The ieee pes task force on benchmarks for validation of emerging power system algorithms,","venue":null,"work_id":"b96ead25-8f4f-4c7a-ab85-dd3b66b9dc99","year":2021},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.316038Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:3f6b1b77e8d3c6bbc962dc80af2ebc3911f19e7f62687b1b24de8e66225aba39","observation_id":"2475f32c-64d8-464a-aeba-b80177533b0f","resolution":{"observed_at":"2026-08-07T11:35:51.378765Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.363452Z","title":"Gurobi optimizer reference manual,","venue":null,"work_id":"e94c3153-97e4-41b6-a8f9-1e60e2214963","year":2014},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.319159Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:bc566b007edbab426c0ec0855e89fc87e2220dd1967d4db7cfbcd18def1dd008","observation_id":"39ae9825-8650-4900-9369-ace18cd125cb","resolution":{"observed_at":"2026-08-07T11:35:51.368250Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:35:51.322329Z","title":"Julia: A fresh approach to numerical computing,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.322329Z"},"links":{"citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:df9a406d2565da49b92ae4e1b5247d3f1dd825f40bf951a9dec771edb7ae53d4","observation_id":"017786d2-e9d2-41d5-a669-d5672854efe4","resolution":{"observed_at":"2026-08-07T11:35:51.322329Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization"},"reference_resolution":{"displayed":24,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":4,"verified_exact":0,"verified_fuzzy":20},"total_outbound_references":24},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 24 of 24 outbound references and 0 inbound Pith citation observations for arXiv:2506.02234."}