{"as_of":"2026-08-08T12:14:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:28d21b47a78b7d5fa25f9f50fe889fdac4dced15f3542d56f3622cc8fe4d44bc","coverage":[{"denominator":52,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":52,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T06:00:46.439027Z","state":"measured"},{"denominator":53,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":53,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T22:37:08.374762Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-06T22:37:12.098925Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"cited_work":{"arxiv_id":"2506.06687","doi":null,"metadata_source":"pith","pith_arxiv_id":"2506.06687","snapshot_observed_at":"2026-08-06T22:37:12.098925Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","venue":"eess.SY","work_id":"bdd834ef-4bca-454b-b392-3aaff79f8a86","year":2025},"citing_paper":{"arxiv_id":"2506.21470","last_updated":"2025-06-26T16:58:47Z","snapshot_observed_at":"2026-08-06T23:35:25.597366Z","submitted_at":"2025-06-26T16:58:47Z","title":"Linear and Second-order-cone Valid Inequalities for Problems with Storage","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T22:37:08.374762Z"},"links":{"cited_paper":"/paper/2506.06687","citing_paper":"/paper/2506.21470"},"observation_digest":"sha256:c752cc688239a05545c6c8e7d5c28f66caa161806791a056843e111683abdb35","observation_id":"069f2447-8aa9-405a-ab24-b86bbfcf0d93","resolution":{"observed_at":"2026-08-06T22:37:12.215793Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2506.06687/citation-record","integrity":"/paper/2506.06687/integrity","json":"/paper/2506.06687/citation-record.json","paper":"/paper/2506.06687"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.468673Z","title":"Future changes in fire weather, spring droughts, and false springs across US National Forests and Grasslands,","venue":null,"work_id":"2d1de327-da1f-4768-9bbe-7a6985d7cfc1","year":2019},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.155938Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:a8dba278381191e4b892c07ec75e6e82c8ca2498948a5cda40a409fe165d38a3","observation_id":"bc9d0e16-52e9-4244-be39-91bf734fe09f","resolution":{"observed_at":"2026-08-07T06:00:47.473637Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.165395Z","title":"Fire ignition data,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.165395Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:34169e4986a6ad8efc7c53c7b6a5cbaae20ecf03f93e806dc31a21814eb10462","observation_id":"b25c3402-8a12-4dbe-a705-ffc969a56412","resolution":{"observed_at":"2026-08-07T06:00:46.165395Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.439315Z","title":"Twenty-first century California, USA, wildfires: Fuel-dominated vs. Wind-dominated fires,","venue":null,"work_id":"c0d8ee82-d623-4a30-b73a-81ffd0312e6a","year":2019},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.171529Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:fc1c819fda5ae5a110a2798e66756e534145187681ac07cf106956b40873ad77","observation_id":"bfde1199-5c11-48af-ab5f-9fc9a363d907","resolution":{"observed_at":"2026-08-07T06:00:47.443704Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.424359Z","title":"Location, timing and extent of wildfire vary by cause of ignition,","venue":null,"work_id":"1826e983-9ebf-42b3-ac55-df747144edcb","year":2015},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.176761Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:b760ef4e09395d4ee74e32a6ec33c4718eb17ea07952fe535bc0718b93fc44ec","observation_id":"fa3aa1a6-ecaa-484d-94e8-93a66c58336b","resolution":{"observed_at":"2026-08-07T06:00:47.428670Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.409576Z","title":"Learn about Public Safety Power Shutofffs,","venue":null,"work_id":"69d03924-806b-4eae-b25b-8dec19257632","year":2021},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.182148Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:ffa0ca6f75cc8fd81da96f526268125e34455fc329605c46e5eb84d177ced069","observation_id":"1698709c-671e-4c83-9a8f-b56f7d86099f","resolution":{"observed_at":"2026-08-07T06:00:47.413961Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.394916Z","title":"California power shutoffs: Deficiencies in data and reporting,","venue":null,"work_id":"5418db68-3fd6-4563-9b72-a93609436300","year":2020},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.188399Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:53756140dacc88309c037d2e1a02ef9b322ebeab776669e1a85314a2f2d94ab6","observation_id":"c819f90b-1cd0-4ff8-a5b2-3b1a95943d94","resolution":{"observed_at":"2026-08-07T06:00:47.399688Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.373787Z","title":"Support for public safety power shutoffs in California: Wildfire-related perceived exposure and negative outcomes, prior and current health, risk appraisal and worry,","venue":null,"work_id":"5e31e073-d3ef-4ace-8e97-a82be7ff05a9","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.193461Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:76f3ed826a1bf2c563eac35937d68fcbdcb973482b2b445841cb63c0712c326d","observation_id":"fd997a40-eacf-4f74-a838-03b933b8d371","resolution":{"observed_at":"2026-08-07T06:00:47.380520Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.353479Z","title":"10,000-Mile Undergrounding Program,","venue":null,"work_id":"f7569623-ef8f-462e-a2ea-2f3dd1848903","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.198694Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:120438ce3f795e33ef3880574c68df6d5673990ed3eb52163762d95d371f71cf","observation_id":"90bb9a91-f334-42dd-8275-c7e181030b94","resolution":{"observed_at":"2026-08-07T06:00:47.359241Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.319986Z","title":"Hardening the electric system,","venue":null,"work_id":"f07931f6-02c0-4582-b346-aa30d40b3046","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.203238Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:ac5a18b3a2767e1f0ce11539526d90d841c320eb9b96cad7c58c30772658469a","observation_id":"0c6041e3-250b-42cc-9c63-6a16d89c9679","resolution":{"observed_at":"2026-08-07T06:00:47.324235Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.302607Z","title":"2025 Wildfire Mitigation Plan Update,","venue":null,"work_id":"5a0eba43-266e-4574-8052-818f01b05871","year":2025},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.209399Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:bcd8c485128a6335112e9ab752141547de3e7ff12c8d5bb75a29ff35d0a295ca","observation_id":"1c2e6ad2-be74-4f35-b925-f2482d7e4435","resolution":{"observed_at":"2026-08-07T06:00:47.307944Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.286378Z","title":"Covered Conductor — Everything You Need To Know (Compendium),","venue":null,"work_id":"173ef29c-029c-4a16-a76d-93421770b88b","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.215288Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:0846137efe863cf06f79dba9514aeb9df84b051385361fac316e03f2716584cf","observation_id":"c6d65f49-cc0e-47b1-9088-96b101df1c00","resolution":{"observed_at":"2026-08-07T06:00:47.291935Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.268208Z","title":"PG&E scraps tree-trimming program once seen as key to fire prevention,","venue":null,"work_id":"b1f19445-0540-4a83-aaaa-42906ad7054c","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.222358Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:66bbee9cde5bf632820950c1198bbc62a06e52239816135775eb7270d760f1e2","observation_id":"ff24f5e4-0611-4118-8e5b-94ef2c20b587","resolution":{"observed_at":"2026-08-07T06:00:47.274354Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.251997Z","title":"Undergrounding a safer, stronger and more affordable energy future,","venue":null,"work_id":"56203b1e-40da-4bf2-af69-3c36616a5f5e","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.226944Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:a9a0a67de02403f0db1e849c5c1e4b53f67b38547a53cd63bcafcf30fda5f58b","observation_id":"76601158-7dcb-498c-8d87-1086045f5759","resolution":{"observed_at":"2026-08-07T06:00:47.256680Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.231790Z","title":"Out of sight, out of mind: An updated study on the undergrounding of overhead power lines,","venue":null,"work_id":"1ba7717b-0efd-4bd7-8b47-ce679854fb39","year":2012},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.231238Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:3e75a75536c5d11e6c2fffc9c1c519579bcc70a79e0acba20fdf629b7888e3cd","observation_id":"b45b80a0-9bd7-4e3d-8ed7-c29a1815f6c1","resolution":{"observed_at":"2026-08-07T06:00:47.236633Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.210294Z","title":"Resilient by design: Preventing wildfires and blackouts with micro- grids,","venue":null,"work_id":"76bfdd64-4fea-4ce4-a762-1ad983fed61b","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.236333Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:d813f62b50e8f3f809e53326af684635defb81a4e14a5b274551f7b79c71ea73","observation_id":"c5b61b50-2cb8-472c-bc51-ec2ee7f9e1c2","resolution":{"observed_at":"2026-08-07T06:00:47.216373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.192024Z","title":"PG&E’s plan to bury power lines and prevent wildfires faces opposition because of high rates,","venue":null,"work_id":"e400b912-4709-45d3-a2f7-5ba1ccf806c2","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.241520Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:b0438cc890226bfa5f44a80752400c1f31424d6a995b7fbb72cd9eb02b812853","observation_id":"c79a7a32-0cbc-4120-8cae-7ef0c544cf35","resolution":{"observed_at":"2026-08-07T06:00:47.196827Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.176744Z","title":"Battery energy storage system size determination in renewable energy systems: A review,","venue":null,"work_id":"3cc98033-1156-4cc0-9919-08989c6d25bd","year":2018},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.246064Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:f58a6b88c1a27d035b9544de64fe3846a6c7c91efa9bbb251042b2d7a5f17705","observation_id":"5c1f111d-8a84-49bb-b37a-8e5700c69426","resolution":{"observed_at":"2026-08-07T06:00:47.182373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.159371Z","title":"Transmission-scale battery energy storage systems: A systematic literature review,","venue":null,"work_id":"23664b4d-5144-4f91-b9e8-35f67d1be40c","year":2019},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.250844Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:24de20f38d40cedf83e2acc11af34bfd2c36bdce8047025ec04e5881e736914a","observation_id":"4ab4fd9a-03f6-43de-8d4c-ecfd94be21bb","resolution":{"observed_at":"2026-08-07T06:00:47.165217Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.141271Z","title":"PG&E, Energy Vault plan largest US utility-scale battery, green hydrogen long-duration storage project,","venue":null,"work_id":"c2c24d48-53db-4221-91a0-11de1c4092b1","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.255363Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:6446549d4c51d951fefdc7558cabd1b55b8cf49db00283248624de1be2d91aa9","observation_id":"968f4dc6-ba55-4274-a9cf-4901e2c53f86","resolution":{"observed_at":"2026-08-07T06:00:47.147776Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.124564Z","title":"CAISO: 1GW dispatch during July wildfire a ‘fabulous moment’ for battery storage amidst 12-fold growth,","venue":null,"work_id":"fa3e6d25-e693-43b7-b17a-5d07474d75ad","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.260473Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:f2e2336510271c782a4da86f854204f85dfe040b0ef8ddbb4c5bfad0c0a28760","observation_id":"2a5e4609-51ad-4209-b31e-45374daf81ad","resolution":{"observed_at":"2026-08-07T06:00:47.130405Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.109501Z","title":"Influence of battery energy storage systems on transmission grid operation with a significant share of variable renewable energy sources,","venue":null,"work_id":"488915f8-0957-434b-98d8-1b55047597a8","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.265277Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:d9028e4fe41de3bdebfc58f152de9d3336f58ce2fcb814ebb0452e2428ce2575","observation_id":"1c96d179-167b-40fd-87a0-45441e4ca97d","resolution":{"observed_at":"2026-08-07T06:00:47.114677Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.090703Z","title":"Unbalanced distribution system expansion and energy storage planning under wildfire risk,","venue":null,"work_id":"5c927e26-eeb0-48be-9401-5ccb91af06fa","year":2023},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.270290Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:a90c4b09da7389306435ce37ef6006511e250f2f12ba283a2fbfac0eef2908b4","observation_id":"4526620e-5e32-4e3c-af36-5d9dd0ff7f83","resolution":{"observed_at":"2026-08-07T06:00:47.099247Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.071974Z","title":"Optimizing transmission infrastructure investments to support line de-energization for mitigating wildfire ignition risk,","venue":null,"work_id":"fcf2f0c5-fa48-4316-8ee4-431a6d07cc96","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.275747Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:e945a08f910e75c1ee696e1eabf6baeb2e532156f1ce657cd0d4ffee89e0ba07","observation_id":"417c7944-5f22-4f65-870d-19ea29291343","resolution":{"observed_at":"2026-08-07T06:00:47.077784Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.055848Z","title":"Long duration battery sizing, siting, and operation under wildfire risk using progressive hedging,","venue":null,"work_id":"2cb4573a-dd75-4980-b950-65983bc505cf","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.282308Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:1439787094fda5c85bc54033ebe9646d16ee2aea73991b7b06bca6f6834ce54f","observation_id":"75f3273d-0866-44b8-a2df-a52019b34e0d","resolution":{"observed_at":"2026-08-07T06:00:47.061540Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.032124Z","title":"Partitioning methods for solving mixed variables program- ming problems,","venue":null,"work_id":"18339f2d-de60-4162-bfa9-cc579b2f0718","year":1962},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.289810Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:5484214ca71d113b8da97f1e247ca7e711b3e0ef48613a70a3f9eec423f4e3b7","observation_id":"0c427a27-00e3-4bcb-b164-50ce11a30b7c","resolution":{"observed_at":"2026-08-07T06:00:47.043808Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:47.013182Z","title":null,"venue":null,"work_id":"1763f300-ff98-44af-910f-86fbebe2c4f3","year":2006},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.297563Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:de25249bc437c71e1c4a65641a43ed4fd00042fac03d01f404c96187d28da07a","observation_id":"778b8879-785c-4c22-85d0-ef08caa8aeb1","resolution":{"observed_at":"2026-08-07T06:00:47.018592Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.998180Z","title":"The Benders decomposition algorithm: A literature review,","venue":null,"work_id":"a1a92c4d-3308-47d6-a4fc-2f6a10ad3663","year":2017},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.304579Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:6e42135f1028e45b9c946c7e5fbde351bd35ae89d03d6884b207b818ad70ab01","observation_id":"5f9ec1fa-2dc2-47dd-9ddc-23f317c7f474","resolution":{"observed_at":"2026-08-07T06:00:47.002858Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.982782Z","title":"Optimal planning of dis- tributed energy storage systems in active distribution networks em- bedding grid reconfiguration,","venue":null,"work_id":"677ce580-9547-4127-bde3-7888356dd23a","year":2017},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.310916Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:90d0a55c44abfdfb5074185bc1363db8a84a15c579456499b8f51401daa36969","observation_id":"ee58e64a-95c7-4579-a068-389b96a4dc70","resolution":{"observed_at":"2026-08-07T06:00:46.987777Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.966557Z","title":"Resiliency-oriented planning of transmission systems and distributed energy resources,","venue":null,"work_id":"2f313e7a-881c-4b50-887c-ac972a62c8cc","year":2021},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.315390Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:159d36bff1ee2b6ddebc3f36ac0d31517fc42917ef5e56537465f66d3a08cb4e","observation_id":"c80f4b8a-f224-4dab-96c3-675205111fe8","resolution":{"observed_at":"2026-08-07T06:00:46.971331Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.951713Z","title":"Expansion planning of active distribution networks achieving their dispatchability via energy storage systems,","venue":null,"work_id":"f5595d4e-cc61-4ad8-8dd8-7b0570dea87a","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.321447Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:9ded4083c432763424f676075e7883c92b49a823909df5ccc50cda4f8a13a0d3","observation_id":"101fdffc-e1d2-49e3-9242-3d0a6b84cf8a","resolution":{"observed_at":"2026-08-07T06:00:46.956448Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.935884Z","title":"Optimal co-planning of ESSs and line reinforcement considering the dispatchability of active distribution networks,","venue":null,"work_id":"6429da57-f4e3-4b99-b435-faff5ee3e66f","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.327435Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:84fca30d55297b1178fb71289ebdf4472c2c9a9ea4b0953b85b60b5fb026c5a7","observation_id":"39de4857-d223-4339-90ad-491c90637ee4","resolution":{"observed_at":"2026-08-07T06:00:46.940770Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.918875Z","title":"California test system (CATS): A geographically accurate test system based on the California grid,","venue":null,"work_id":"599093bb-3b06-4a44-99ac-352be1f26120","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.333316Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:3d65485d0daa71653990d0f00af0649caefddbbe12bd8662f150774bab34e3e6","observation_id":"0ee4e264-200d-4bdf-be7c-1ff053e67d48","resolution":{"observed_at":"2026-08-07T06:00:46.923548Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.899418Z","title":"Quantifying metrics for wildfire ignition risk from geographic data in power shutoff decision-making,","venue":null,"work_id":"f7a846f9-1413-430b-af3d-3456e340b18e","year":2025},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.339013Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:3b5ca803f60a425ee4503965f5c4a922fc6b8dcc170b4ef914d002c8ed831066","observation_id":"07e84a2c-670f-4722-93e5-9588d4816290","resolution":{"observed_at":"2026-08-07T06:00:46.905864Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.873648Z","title":"Wildland Fire Potential Index,","venue":null,"work_id":"ed1ecb95-2b9c-4226-9766-f5cf52f0e30d","year":null},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.344569Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:c0ed28577c9e266768068788415f4f729a2034acd81cf453599393fe6947faad","observation_id":"234aff64-55fb-4197-b034-b509a86455b1","resolution":{"observed_at":"2026-08-07T06:00:46.879516Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.831560Z","title":"Dispatching stochastic heterogeneous resources accounting for grid and battery losses,","venue":null,"work_id":"69964a27-1901-4fbd-badc-3a4f9a7b9bca","year":2017},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.354081Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:d6f841d474a0d6cda3a85ca5a6bf162be19bfe99914d2174642dc084d67104cc","observation_id":"13ca6c63-aac2-44ac-b236-29a5adb52337","resolution":{"observed_at":"2026-08-07T06:00:46.840234Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.808788Z","title":"Coordinated day-ahead dis- patch of multiple power distribution grids hosting stochastic resources: An ADMM-based framework,","venue":null,"work_id":"5a99e8b4-3983-492e-8985-d2fc9d8f64e9","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.358535Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:459a60cf1434aff3b81483fb395a14839848c6e8b23b91e5dffe0e881172967d","observation_id":"c5e41d34-f1e5-4f05-be57-28606292876b","resolution":{"observed_at":"2026-08-07T06:00:46.815197Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.790018Z","title":"Solving multiperiod OPF problems using an AC-QP algorithm initialized with an SOCP relaxation,","venue":null,"work_id":"165fa0f6-13fd-4ac6-85de-a83366b517bc","year":2016},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.362921Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:001641c14bbcfb7f9ab992b1d755d51476ca11d6309c8afd34ddc74c8c699a60","observation_id":"ff72f44d-e847-4bb0-9abc-7489b459d543","resolution":{"observed_at":"2026-08-07T06:00:46.795728Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.771063Z","title":"Linear battery models for power systems analysis,","venue":null,"work_id":"42c97299-7807-4ad2-988f-7911db34eeda","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.367204Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:b0f256eb1f14a01a60238d360a8019188819f1432c5c380658a7ba367860469c","observation_id":"ef4a42ca-d382-40a7-9597-653b00f9be53","resolution":{"observed_at":"2026-08-07T06:00:46.776095Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.745934Z","title":"Equitably allocating wildfire resilience investments for power grids – The curse of aggregation and vulnerability indices,","venue":null,"work_id":"52e101f7-deba-4105-ae13-d48c8a8b1d5e","year":2025},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.371867Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:108e71ac6522bfa74a388b1adbf7852128267f399e68834a7e1a8cf01abcad1f","observation_id":"56feb8d3-9ecf-457a-afb3-fd27ebb51713","resolution":{"observed_at":"2026-08-07T06:00:46.752931Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.724263Z","title":"Value of lost load: An efficient economic indicator for power supply security? A literature review,","venue":null,"work_id":"7f87c17e-7adb-4ecb-981f-500f876d3334","year":2015},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.376581Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:a75eb4f0d577f245c2bf59189a29b42b683ad220dec1dfe735e88e3275e00ac5","observation_id":"39aa63dd-0c96-45c1-832d-153dfef38977","resolution":{"observed_at":"2026-08-07T06:00:46.731854Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.704088Z","title":"CPUC under- grounding programs description,","venue":null,"work_id":"06830736-bad8-434d-9c6a-fb89117059e4","year":2019},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.382644Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:197036cb3ed61d66e8eab124691abc69072ddaab847f741d2551890980eaa787","observation_id":"e9cda9ff-14c6-4714-8525-8bcc3d33b21a","resolution":{"observed_at":"2026-08-07T06:00:46.709803Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.680784Z","title":"2022 grid energy storage technology cost and performance assessment,","venue":null,"work_id":"995fc4bd-34de-4803-a57c-bf33bad7be43","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.387181Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:99e166cd0acbf1ea666c2f2d4ae8bada3417edfb2104e1ef30a3e53603b3fada","observation_id":"e42760a6-c932-4fc3-9210-da0568e29700","resolution":{"observed_at":"2026-08-07T06:00:46.687665Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.660779Z","title":"Overview of current development in electrical energy storage technologies and the application potential in power system operation,","venue":null,"work_id":"2f21d7d2-0117-4f4e-a1e7-f71a00614ccb","year":2015},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.391867Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:6945f90409de42177b07068629404bb14c9666ee794ff25cbe4eab33de2b7ba0","observation_id":"f3459cfc-01e8-44c7-9bf6-a83e89a4ee5f","resolution":{"observed_at":"2026-08-07T06:00:46.666623Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.640808Z","title":"What drives capacity degradation in utility- scale battery energy storage systems? The impact of operating strategy and temperature in different grid applications,","venue":null,"work_id":"4ba6f2a9-24cf-4f6f-9989-6652d042861b","year":2022},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.398678Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:316a94f14aa6f458a192f178e05e9a3c61929f024ed4004fedeaed66b0cdf8e9","observation_id":"fa9db9a4-76bd-4f0c-ab0c-620f83d0be02","resolution":{"observed_at":"2026-08-07T06:00:46.646482Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.621766Z","title":"Overhead vs. underground: Information about burying high-voltage transmission lines,","venue":null,"work_id":"b916c298-8871-4a1e-8a84-5245dad0850a","year":2014},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.404215Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:d9876e96b96c42123782ef29412253c8abd3c0475f7af44ee41dd183db539d48","observation_id":"7f168b94-a692-4ca8-a5b5-aff8f59eda8a","resolution":{"observed_at":"2026-08-07T06:00:46.626929Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.409339Z","title":"Gurobi Optimizer Reference Manual,","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.409339Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:7e0558bbea1999559d2e8480904641df7dab0449c0c2e238fe534f203cead0fa","observation_id":"3f23d52e-d4dd-4dd9-bbe7-f198e37fad00","resolution":{"observed_at":"2026-08-07T06:00:46.409339Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.576530Z","title":"[Online]","venue":null,"work_id":"01991133-0a33-4f40-861d-63a0aded9b5c","year":null},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.421497Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:63c038cf3eeb8bc534ca79c39e35fbb745c85a6cfb7cfe5350f492c97261ad13","observation_id":"5bea7d06-02a3-493b-8739-b29a33d13280","resolution":{"observed_at":"2026-08-07T06:00:46.582256Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.551713Z","title":"A Survey of Relaxations and Approximations of the Power Flow Equations,","venue":null,"work_id":"666da3cd-71b9-4a6a-8744-713e596bc274","year":2019},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.427398Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:aae0a9e6b650715ef02e15a71bfecb2facad47bb563c178add9835e2f1d605a8","observation_id":"d50f44cb-8192-4f8a-913a-135702cfd3e6","resolution":{"observed_at":"2026-08-07T06:00:46.559455Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.529249Z","title":"Long solution times or low solution quality: On trade-offs in choosing a power flow formulation for the optimal power shutoff problem,","venue":null,"work_id":"1305fc3f-76b6-4fd6-bec5-20cf8585a188","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.433609Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:c940510e52531d8498674dc8d5427469ef78adcc365b53337d359184b0915c41","observation_id":"351b4cb5-96c8-4411-a17c-75a608f376f9","resolution":{"observed_at":"2026-08-07T06:00:46.534899Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2411.10528","last_updated":"2025-05-01T19:22:10Z","snapshot_observed_at":"2026-07-06T19:51:09.829522Z","submitted_at":"2024-11-15T19:02:59Z","title":"AC-Informed DC Optimal Transmission Switching Problems via Parameter Optimization","version":2},"cited_work":{"arxiv_id":"2411.10528","doi":null,"metadata_source":"pith","pith_arxiv_id":"2411.10528","snapshot_observed_at":"2026-08-07T06:00:46.497333Z","title":"AC-Informed DC Optimal Transmission Switching Problems via Parameter Optimization","venue":"eess.SY","work_id":"37d7b7bb-b6b1-4f12-a3a1-1d8c432b9f0d","year":2024},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.439027Z"},"links":{"cited_paper":"/paper/2411.10528","citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:13a36af57c7a090f72045ba05b587af25dd1feef3ef77fbd90d818ef0c4dcbb3","observation_id":"9f1518ed-bd5c-4ce1-89c7-6ae2376f8092","resolution":{"observed_at":"2026-08-07T06:00:46.504849Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.851591Z","title":"Available: https://www.usgs.gov/fire-danger-forecast/ wildland-fire-potential-index-wfpi","venue":null,"work_id":"da27e398-fb6b-4ade-9fa4-d1d92db3ad37","year":null},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":2024,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.349496Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:845b517be0a143d2e6fa50b499130c057e40b91a7ae5206aa4d0487916d61e0f","observation_id":"3285a674-2a8c-44f8-9915-bff46d3cae30","resolution":{"observed_at":"2026-08-07T06:00:46.858391Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T06:00:46.416192Z","title":"Available: https://www.gurobi.com","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach","version":2},"reference_index":2025,"source":"pdf_text","source_observed_at":"2026-08-07T06:00:46.416192Z"},"links":{"citing_paper":"/paper/2506.06687"},"observation_digest":"sha256:17e5bef2e0718ac4a229f1daec833772a38355173ac04a8df7d38cd8e6d59dfa","observation_id":"71875bf3-9fe7-4414-ab87-588759fe72f8","resolution":{"observed_at":"2026-08-07T06:00:46.416192Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2506.06687","last_updated":"2025-06-17T22:51:44Z","latest_version":2,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T05:49:50.020580Z","submitted_at":"2025-06-07T06:53:13Z","title":"Optimizing Battery and Line Undergrounding Investments for Transmission Systems under Wildfire Risk Scenarios: A Benders Decomposition Approach"},"reference_resolution":{"displayed":52,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":4,"verified_exact":1,"verified_fuzzy":47},"total_outbound_references":52},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 52 of 52 outbound references and 1 inbound Pith citation observation for arXiv:2506.06687."}