{"as_of":"2026-08-08T06:17:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:a70afc3edf6c99a6ebcdcec1eb5651e8cc60ff7dfbb4d810aba3fd2691d4af48","coverage":[{"denominator":9,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":9,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T05:49:53.290686Z","state":"measured"},{"denominator":9,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":9,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-07T06:34:17.273281+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.07024/citation-record","integrity":"/paper/2506.07024/integrity","json":"/paper/2506.07024/citation-record.json","paper":"/paper/2506.07024"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.392695Z","title":"Simultaneous assign- ment of locomotives and cars to passenger trains","venue":null,"work_id":"13945322-cee1-449c-8a4b-b0ebc99165e0","year":2001},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.260911Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:aea91aa03563f25bbab26b1e1543640d33164cce96dbb5224f363c692532a801","observation_id":"c783e6ee-2fed-46fd-8e38-854ec8d1b79d","resolution":{"observed_at":"2026-08-07T05:49:53.396050Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.383529Z","title":"A branch- first, cut-second approach for locomotive assignment","venue":null,"work_id":"cd114865-9c42-4dc4-99bf-46c11141e63b","year":1999},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.265337Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:13f0a15d45a9552c930573153dcab0609d9aa51209230bb9150dc2755e1af47c","observation_id":"854ae5b8-d3e2-45f7-8456-7d30bdb7abd5","resolution":{"observed_at":"2026-08-07T05:49:53.386820Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.374363Z","title":"A pragmatic opti- mization method for motor train set assignment and maintenance scheduling problem","venue":null,"work_id":"82d144c5-b4a8-4765-a71a-e22d25bf44c6","year":2016},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.268909Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:44210449ca962148685631bd073373fdf8aa2b185439a565772cc4f91b9cb8fe","observation_id":"dfc6fc9e-e94f-4148-912a-3920af0124e7","resolution":{"observed_at":"2026-08-07T05:49:53.377861Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.364898Z","title":"Rake linking for suburban train services","venue":null,"work_id":"6d3facce-5454-4068-98cd-dc723eb29c0d","year":2006},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.272397Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:fcf761d034b94e445a63f5ce77144228cadfe25b5c0bbc6b8a5ab6f538639060","observation_id":"d067950a-ac33-4981-a263-d378e622744c","resolution":{"observed_at":"2026-08-07T05:49:53.368396Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.354859Z","title":"Indian railways: Train set assignment problem in suburban services","venue":null,"work_id":"fca3568e-c0c6-4c70-9b2c-338c5085076a","year":2024},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.275545Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:1241796fe4dae3d39908e5bf40018c613f0d36ced04802dd0e9b8f978457e162","observation_id":"0188e129-4f90-405f-b588-2dc0fcd9aea3","resolution":{"observed_at":"2026-08-07T05:49:53.358675Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.345524Z","title":"A pragmatic algo- rithm for the train-set routing: the case of korea high-speed railway","venue":null,"work_id":"713269d4-f2c1-467d-9d50-87ba2e0f85bd","year":2009},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.278811Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:b29ac6e97f8b92c86a775c33f477cac61c41dd60a23b70c32ca3ff340e09b984","observation_id":"9ce8b2fd-c04d-47e1-833c-c5c7ad395e6c","resolution":{"observed_at":"2026-08-07T05:49:53.348815Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.335803Z","title":"A multi- objective train scheduling model and solution","venue":null,"work_id":"e3e55b1f-cb1a-4786-9e72-80b8c5566c22","year":2004},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.283592Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:1ce377e04936cecdf04c0ce8ed178984181d00ef9012eb95c03b87a579d96d29","observation_id":"2cf65686-2ff7-4c0c-92e2-5f53c80dffe6","resolution":{"observed_at":"2026-08-07T05:49:53.339482Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.325918Z","title":"Passenger railway optimization","venue":null,"work_id":"77e387d0-767a-48a8-b792-d0dc897a0f9d","year":2007},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.287533Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:1fae41995335c5b0a7169fc924bc086d9f82051fe3c74ea04f3395855fb98303","observation_id":"6f9af30f-3ec9-4065-bbc6-8d1ecbf5d78e","resolution":{"observed_at":"2026-08-07T05:49:53.329850Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:49:53.313384Z","title":"Literature review on problem models and solution approaches for managing real-time passenger train operations: The perspective of train operating companies","venue":null,"work_id":"85118945-127b-4917-9ec6-bfb866b2ebb9","year":2023},"citing_paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T05:49:53.290686Z"},"links":{"citing_paper":"/paper/2506.07024"},"observation_digest":"sha256:28fb8935428162f7988345329de31150b4e208692dcc94cc509ffa5ed4bb5cfa","observation_id":"0a943af4-c904-4ed1-aeba-f7208bd40283","resolution":{"observed_at":"2026-08-07T05:49:53.318516Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2506.07024","last_updated":"2025-06-08T07:20:45Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-07T05:41:23.515104Z","submitted_at":"2025-06-08T07:20:45Z","title":"Optimizing rake-links independently of timetables in railway operations"},"reference_resolution":{"displayed":9,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":9},"total_outbound_references":9},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 9 of 9 outbound references and 0 inbound Pith citation observations for arXiv:2506.07024."}