{"as_of":"2026-08-08T15:48:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:d3ab7b083f135c6358e06cc07f10e1c8416b9a78b9a99f7d3411b91676b29ca3","coverage":[{"denominator":9,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":9,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T05:10:56.973464Z","state":"measured"},{"denominator":9,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":9,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.08638/citation-record","integrity":"/paper/2506.08638/integrity","json":"/paper/2506.08638/citation-record.json","paper":"/paper/2506.08638"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2013.66523","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.323225Z","title":"Optimal bidding in sequential physical markets—a literature review and framework discussion,","venue":null,"work_id":"b6d0a5c4-f990-49dc-abcd-432f91379872","year":2013},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:55.929047Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:5c54c79bc05250631e0c245d9cde8663bd07f951a7ecccd8dbe03dc0f169ac62","observation_id":"b9a490cc-e8a4-4e44-9c4d-b999caafc52a","resolution":{"observed_at":"2026-08-07T05:10:57.328075Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:56.063276Z","title":"The value of coordination in multimarket bidding of grid energy storage,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.063276Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:35d0bbd3f1f4a1d6c34bba7a872df3a1b0e82a1f362e7347ae4a617f0d0c23be","observation_id":"f49aac3e-cc99-4996-8614-a3af67343caa","resolution":{"observed_at":"2026-08-07T05:10:56.063276Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.ejor.2014.04.027","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.041818Z","title":"Bidding in sequential electricity markets: The nordic case,","venue":null,"work_id":"68afe69f-95c6-4390-9e54-548bcbe85e2a","year":2014},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.594936Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:b1a8443dd6bcd38804179c89b8d8105a9a15065306e732b2db53d502d3f56f95","observation_id":"9f1f9c4a-cb40-4778-a8e6-05f1b3fce0e2","resolution":{"observed_at":"2026-08-07T05:10:57.045314Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.energy.2018.01.187","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.031230Z","title":"Multi market bidding strategies for demand side flexibility aggregators in electricity markets,","venue":null,"work_id":"7620266b-573a-41f8-8dfd-67ca07ae760f","year":2018},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.954850Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:717b8ccffafc26bcf4b3a282380a251bbaa0af46938523f2a71a1691e5d1b35e","observation_id":"06095144-98e7-42e5-a946-465a91a1e848","resolution":{"observed_at":"2026-08-07T05:10:57.034676Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1109/upec.2019","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.020082Z","title":"Trading strategy for a flexible factory participating in the german balancing and day-ahead market,","venue":null,"work_id":"0a2a3a05-a4ca-4bf6-8723-34b5b2147c88","year":2019},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.958832Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:993c4d52b3c62d08be5aa9907cadd8e1d33a97fa12180cecea2e560ae47329c5","observation_id":"7f5e27a0-b649-49d3-847a-ff3bb4041446","resolution":{"observed_at":"2026-08-07T05:10:57.023504Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2019.11395","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.199892Z","title":"Energy-intense production-inventory planning with participation in sequential energy markets,","venue":null,"work_id":"346b7df0-44a6-4436-8407-58b5044d90f6","year":2020},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.963136Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:66acb824a557b83408c70ed95d449a1795a5ffd6d2410156585e62ae77ce8b46","observation_id":"5a307b65-58a4-4333-88ce-5a8a3eb4dcfc","resolution":{"observed_at":"2026-08-07T05:10:57.204884Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2023.32861","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.120143Z","title":"Stacking revenues from flexible ders in multi-scale markets using tri-level optimization,","venue":null,"work_id":"ae5e39af-2891-48bb-a94c-9597cc882f99","year":2024},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.966653Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:ab6c22c0d48eaedefb1e7a4324ac8aa4216411d62e5e29accc72e9d7c9796170","observation_id":"83fa5337-a802-4494-a10f-73b5a16affc4","resolution":{"observed_at":"2026-08-07T05:10:57.127127Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1049/iet-rpg:20080049","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:57.010687Z","title":"Comparative analyses of seven technologies to facilitate the integration of fluctu- ating renewable energy sources,","venue":null,"work_id":"aa47c333-f69f-4520-b0b9-46ebb9aa2184","year":2009},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.969871Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:e96288b9dd984b8ae1df194e2c7dbac4c82ad10d06dd54da200d4ff9e5a11c84","observation_id":"a59ae769-3981-461e-bcab-6e6d13ce867b","resolution":{"observed_at":"2026-08-07T05:10:57.013861Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.3390/app11031063","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:10:56.998010Z","title":"Optimal selection of thermal energy storage technology for fossil-free steam production in the processing industry,","venue":null,"work_id":"fd32d056-b6d2-4ce0-a76e-90782047a6c6","year":2021},"citing_paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T05:10:56.973464Z"},"links":{"citing_paper":"/paper/2506.08638"},"observation_digest":"sha256:d125e1faa36239c92d54e684cea45b9301afa3b83c1f600f09c01ed18ce88b9e","observation_id":"ab8d788b-6e90-4f8a-9820-ef01d01dcef0","resolution":{"observed_at":"2026-08-07T05:10:57.003435Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2506.08638","last_updated":"2025-06-10T09:52:24Z","latest_version":1,"primary_category":"econ.GN","snapshot_observed_at":"2026-08-07T05:03:25.048509Z","submitted_at":"2025-06-10T09:52:24Z","title":"Industrial Flexibility Investment Under Uncertainty: A Multi-Stage Stochastic Framework Considering Energy and Reserve Market Participation"},"reference_resolution":{"displayed":9,"state_counts":{"malformed_identifier":0,"metadata_mismatch":3,"parse_uncertain":0,"unresolved":1,"verified_exact":5,"verified_fuzzy":0},"total_outbound_references":9},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 9 of 9 outbound references and 0 inbound Pith citation observations for arXiv:2506.08638."}