{"as_of":"2026-08-08T08:54:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:b4f6ecf7178cf5334b091cd96e40f116f5c418131aaa593f0b8be7493a9375b9","coverage":[{"denominator":53,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":53,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T05:09:36.357118Z","state":"measured"},{"denominator":53,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":53,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.08724/citation-record","integrity":"/paper/2506.08724/integrity","json":"/paper/2506.08724/citation-record.json","paper":"/paper/2506.08724"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.981762Z","title":null,"venue":null,"work_id":"a9da4d27-88df-414f-ad8c-01c6046b3c8e","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.047971Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:c62624b3ba0b62ab45177c2cb11cb3c66cf4ba4d587f5b5362418e2c0c19b80b","observation_id":"49f60a5c-c4a1-4b38-9274-a852cae51a78","resolution":{"observed_at":"2026-08-07T05:09:45.032678Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.859481Z","title":"& Y ang, Q","venue":null,"work_id":"780ff429-48bf-41fd-9586-f44caf1f35b8","year":2019},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.232542Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:e7cad78d50a326cf8c5ec8016ddb557a6e8017076d786bb192145a80a5c42991","observation_id":"cf460298-9926-4919-a11c-b516a01ee8e8","resolution":{"observed_at":"2026-08-07T05:09:44.905692Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.728393Z","title":"& Osma-Pinto, G","venue":null,"work_id":"3940fe9e-f35e-4a5f-8413-d0cb377473e1","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.413291Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:aa6cb5a51a4584c4c80b00950aad766f55bb95038da9297e3eaf0c03b96a4c6c","observation_id":"b5694cba-37be-4297-8510-5e940aaf0b99","resolution":{"observed_at":"2026-08-07T05:09:44.794880Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.623237Z","title":"& Shahidehpour, M","venue":null,"work_id":"b4d887f5-707a-4c4d-b2c6-4f1c495b3a54","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.589617Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:fc32af7b6b20f013ac979113e8972bbf9e599b269a75197ec91ff067e8b028e3","observation_id":"91022b5a-955e-4192-9b52-909bfbfc8320","resolution":{"observed_at":"2026-08-07T05:09:44.673677Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.484785Z","title":"& Jain, A","venue":null,"work_id":"bf567749-4dd8-4ce8-b16b-39b2d0df702a","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.726720Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:548a96e0f69b980fde1ec102cfee7ad12c6fcdd9baca6d09b893562466812c93","observation_id":"012bb7bc-5ec1-4e8a-8838-fe95908f2570","resolution":{"observed_at":"2026-08-07T05:09:44.552666Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.375810Z","title":null,"venue":null,"work_id":"9879280d-3d38-496a-ae87-e26e757473ec","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:31.914519Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:69b7aa8b095b269e60eac60ed8febae785aa0512d86f0112ecbefe0b6206fa8b","observation_id":"5034af17-a01e-4e8a-89bd-0ccf4fc971bc","resolution":{"observed_at":"2026-08-07T05:09:44.423496Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.232733Z","title":"& Hakvoort, R","venue":null,"work_id":"d308b141-a4d8-4465-abc8-1551c2ebecc6","year":2016},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.076666Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:5245c3f0bd6ac1967604dc754e7aa7a4238b56921ced2e70c9d1959dacb79475","observation_id":"e8573f10-efe2-4696-869c-a987b957f87e","resolution":{"observed_at":"2026-08-07T05:09:44.295483Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:44.109502Z","title":null,"venue":null,"work_id":"83d5c53f-2aae-4c4f-9264-aae06503bda1","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.203961Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:047fd51b8e548e9178693593b4f05b286f7e87c17d018488c05578bc4573ef4e","observation_id":"fb6f22a8-9226-4943-a110-e627b5a32f44","resolution":{"observed_at":"2026-08-07T05:09:44.155326Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:43.961322Z","title":null,"venue":null,"work_id":"b87d34c2-0f8a-42bc-844a-ce5176c4db18","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.313434Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:07bf7cef59719f3df862c6502b90daae00a7d54b1e321a6c1325957d411dfa55","observation_id":"cb7b28f4-a16a-4953-8cf3-27f14fe6dcf1","resolution":{"observed_at":"2026-08-07T05:09:44.012964Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:43.878137Z","title":null,"venue":null,"work_id":"68c413cd-919e-4561-af49-8005f6216efd","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.451082Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:728b150c086634b125592e28a9a7ba3a775db656dcf1a4db29d9155103fc37b4","observation_id":"35e8e752-33c9-4c90-b36b-caa6395ae621","resolution":{"observed_at":"2026-08-07T05:09:43.899520Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:43.656416Z","title":"& Y ang, W","venue":null,"work_id":"d77b1e4d-6742-482c-ac67-098102864818","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.529556Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:39475dd4d70172b05b3c7682609a1603c6a426daae7e70a0d452abdcfdbfa7b0","observation_id":"d2625872-3f11-4043-9d52-f3d57e27c732","resolution":{"observed_at":"2026-08-07T05:09:43.747461Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:43.364334Z","title":"& Sansavini, G","venue":null,"work_id":"2ca91dba-e373-46e6-b377-a58e72472828","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.652943Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:9764e4fe09f475b14ee215d8616a6b7cd01dcf1887d87efe26504b2bede423ec","observation_id":"0f39f86e-2926-44a5-83e2-2905a75745c2","resolution":{"observed_at":"2026-08-07T05:09:43.530070Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.973622Z","title":"& Sansavini, G","venue":null,"work_id":"8f92f70c-c104-4290-9e27-24633765ff71","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.750085Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:17bffded6b2a6bcbcc5513a43f30ff84a99eebe004a38a8c298e45a3866c915b","observation_id":"8c8478c0-671f-424d-8b5e-43e59c7fee45","resolution":{"observed_at":"2026-08-07T05:09:43.183696Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.676114Z","title":"& Sansavini, G","venue":null,"work_id":"962f27de-7118-4ab5-a77e-7b4e1d57fe80","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.810540Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:6675b0c510fd1d303171b547e5ed5a19ffa6fce5861f2cb6ee2fb5322fbe7c2c","observation_id":"e9bcb5af-3a67-4254-83ad-6093c287f7ed","resolution":{"observed_at":"2026-08-07T05:09:42.790320Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.535693Z","title":"& Tse, C","venue":null,"work_id":"bfe51d5b-f325-4c4f-8e2f-a57d49c619d4","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.887414Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:7acc31c97826af0267d6a7d13c2df205360391f63296c7a9fcafcfe29a4187ff","observation_id":"9e0805c3-39a5-41e5-99ad-cc4fb4fb8b08","resolution":{"observed_at":"2026-08-07T05:09:42.541256Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.512628Z","title":null,"venue":null,"work_id":"10c806db-dd99-41fa-acf9-2312da9605da","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:32.984619Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:fabad3217ecbcc861df159d3a6dc4a1ee6ac252ff5e682c8940feac2fcf35d38","observation_id":"554ce0dc-8df8-4b4a-8924-24ed735f3e9f","resolution":{"observed_at":"2026-08-07T05:09:42.528203Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:33.053567Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.053567Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:4d9f57cbbf81eafd2d782ca11ea575615fbef3cc1fbe6618e446f5d63fb6195f","observation_id":"5f995ab7-b928-4ccc-b956-86876e94a36e","resolution":{"observed_at":"2026-08-07T05:09:33.053567Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.371374Z","title":"& Wogrin, S","venue":null,"work_id":"f3a6a644-1fd8-46e2-9869-f221ec24f1b0","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.149097Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:d4bf3dcdd766abc4619645d11debebf89dedb4389e4e3d52c10dcfc09262ae56","observation_id":"a64d1d20-4bf4-4371-a955-23e5a5f992b7","resolution":{"observed_at":"2026-08-07T05:09:42.423519Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.237137Z","title":"& Goebel, C","venue":null,"work_id":"1e439b02-866f-4ce7-85b8-690655b308f3","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.213034Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:07437e6824cb3f623415c7e8710da775420c01d2dbe82680a66cbb3bc094e253","observation_id":"7bab7f30-506b-46fa-ae9a-7f4b93774a0a","resolution":{"observed_at":"2026-08-07T05:09:42.298731Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:42.122619Z","title":"& Sansavini, G","venue":null,"work_id":"8b729170-2c8b-4088-b7e8-a102329c5e85","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.305161Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:f97f13392ebde2499765eb62598a0461dcebda2ff47f8b94892120ed94380a3e","observation_id":"3206fde6-c97e-4da9-a9b9-65ef1a941678","resolution":{"observed_at":"2026-08-07T05:09:42.177672Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.974059Z","title":"& Kazempour, J","venue":null,"work_id":"eaf8f6ca-4a1e-4fd1-aaed-2c5cad9c457f","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.381207Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:feaf9a581268e4e11e4ab3d94db08bd9d77b9b9bc8c9e54f2029d625623b483a","observation_id":"14c18b25-d009-4c9f-937a-35aa96f7c5e7","resolution":{"observed_at":"2026-08-07T05:09:42.039688Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.853513Z","title":null,"venue":null,"work_id":"c90ff3b6-edcf-4358-9d85-b7deb327eeee","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.459573Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:59e19c3423a777ceb05903cdc934462ff35d64871e8f29557500813792d50786","observation_id":"f16dd7bf-7b08-4ac2-98d5-a63c596e3d51","resolution":{"observed_at":"2026-08-07T05:09:41.908876Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.735406Z","title":"U., Mateo, C., Gómez San Román, T","venue":null,"work_id":"66fe990b-dc7c-462e-9f2d-2f9b6bbed970","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.530729Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:3dd614788513672c99aaa1aae73f480b83c9721c06defd8bad294534f92936f9","observation_id":"155fa08f-b66a-4877-aa33-b30657a49af8","resolution":{"observed_at":"2026-08-07T05:09:41.784418Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.615097Z","title":"& Rajagopal, R","venue":null,"work_id":"7a9e3c1f-71cd-4c53-ace2-0e3dbf5b39bc","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.608148Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:59241deb810e4b663d27d4e5dc82b813f1bcdfe8e5b69b1c468e628cf5320d0f","observation_id":"de1ff904-05ad-4def-8077-d24543e13169","resolution":{"observed_at":"2026-08-07T05:09:41.673817Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.506046Z","title":null,"venue":null,"work_id":"a51d7270-c8df-4d4c-92d7-9a9d966ac181","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.699273Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:83690ff8faf2b5c638c79cfd72f0670f8b052321a9d0b6c0ca42eb83689ba264","observation_id":"94720e1f-6906-4f05-b285-d32cb72f6f6e","resolution":{"observed_at":"2026-08-07T05:09:41.556891Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.387734Z","title":"& Merlo, M","venue":null,"work_id":"a56fd716-1236-41c3-b03d-e3e6fb245f9c","year":2020},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.767295Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:02375292df2958ea208b9d2903c49649bfc6e5bfdd8bf006ce1b5a1b6499e77b","observation_id":"7fcafead-eb50-4176-804a-fa988efc1751","resolution":{"observed_at":"2026-08-07T05:09:41.443664Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.258610Z","title":"& Scartezzini, J.-L","venue":null,"work_id":"4b0bdd62-cef1-4364-96a7-6ed7096c9050","year":2020},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.834221Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:4eaf8cc19ad2ea6df7782b07304b908d8e066e68c75c7e204067f69867be5555","observation_id":"33ca0a4b-37f3-46f9-837c-67e08a811d86","resolution":{"observed_at":"2026-08-07T05:09:41.332846Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:41.130713Z","title":"& Vulic, N","venue":null,"work_id":"c213d18e-26ec-4ae5-b7d2-5e8cdac6f6f4","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:33.934616Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:9d8a897f13a6384b48379b9543ed4e409a8231b4ac2a9aa90da063c2844ae053","observation_id":"94477358-e6ba-4c44-8bd3-2d92e9e3c708","resolution":{"observed_at":"2026-08-07T05:09:41.201306Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.981193Z","title":"Eip-eth collaboration: Rethinking future swiss electricity supply","venue":null,"work_id":"e53845c7-57ee-442c-b024-aa7ded88e3c7","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.006622Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:e0bc556312b100dcc996192ec6fffe5af43ee1d77210564734fdf5fecbfea0a8","observation_id":"b86372f6-ca97-483a-aec5-8c3989ba1569","resolution":{"observed_at":"2026-08-07T05:09:41.046391Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.802034Z","title":"Energy perspectives 2050+","venue":null,"work_id":"c1d7d355-be77-4451-9907-ecd3ee51d828","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.087547Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:3faeaf5f6020d8000a5c6e68aa56ce52e7fe3d8618e26fae3e8f1c1f615ab3b9","observation_id":"40f3a863-482e-44ec-9625-e6d1f0eb63b7","resolution":{"observed_at":"2026-08-07T05:09:40.889903Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.617454Z","title":"European market outlook for residential battery storage 2022-2026","venue":null,"work_id":"94d0601b-18aa-4b07-9b37-5bd1e837fc11","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.172497Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:c1122a62876c4e15c521eb15bb13619847917163146a4a233cad3012505b49a0","observation_id":"258f8bfe-82cc-4384-8e6f-a6afed60341d","resolution":{"observed_at":"2026-08-07T05:09:40.682218Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.429803Z","title":"Annual technology baseline: Residential battery storage","venue":null,"work_id":"7cc8bf6a-698e-4a07-ae4f-1e5ed968aa17","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.253081Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:fcb5fdd13f7b313b7770ab676bb7c063a34c20b7c29a92211806b42d1e940e1f","observation_id":"84b41899-7376-43ac-b5ee-bb173f483d68","resolution":{"observed_at":"2026-08-07T05:09:40.506839Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.262141Z","title":"& Karmakar, A","venue":null,"work_id":"311d2efa-16b1-429e-a1b7-9c093fba3db6","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.355153Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:31c14ca437d6bec8530ed1592a97e6bb23e7a2f6fff3f457a2dfc8511bb94b13","observation_id":"055f5817-b1bc-4a12-bfd0-8d4aeb204aa8","resolution":{"observed_at":"2026-08-07T05:09:40.352108Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:40.084755Z","title":"Gwr publicly available data Accessed: 2025-4-7 https://www.housing-stat.ch/de/madd/public.html","venue":null,"work_id":"604983c7-f58e-4bad-944e-cd2a2948f05e","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.473875Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:0663ae9eb07734f7c4fae5ecc5155d1bbed8055bb8dd088c7b6666e05f79b5e8","observation_id":"745e3771-fd7b-4d87-8958-31e2e8e94798","resolution":{"observed_at":"2026-08-07T05:09:40.180308Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:39.903912Z","title":"D., Bacher, J.-P","venue":null,"work_id":"ae64ea3a-a50f-45f3-b3d7-a2e14ca83f5d","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.560977Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:1138fc4e3619dd27e938d7226b60d7453bce20e31fc1e56c52cefe09701849c8","observation_id":"7c001a30-6382-4ce8-886f-8f2e51431ed8","resolution":{"observed_at":"2026-08-07T05:09:39.980114Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:39.754213Z","title":"Dimensionierung von Wärmepumpen","venue":null,"work_id":"b147b2d3-c9da-4a91-81a6-8ecf44f977ad","year":2001},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.659302Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:c89edfb10bc5e5b8a189304462aab3a709ccd763e0a60a80996409200a5e7f1f","observation_id":"b6327ef0-c9e9-4237-ac1a-0f8db957aa2c","resolution":{"observed_at":"2026-08-07T05:09:39.816298Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:39.558282Z","title":"Grundlagen für energetische Berechnungen von Gebäuden","venue":null,"work_id":"43117830-defb-459c-92d8-543b2290a840","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.761793Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:5902110c9374f0614be616ebfc8d1252a345f611b0a7d6e629cdd7c05ca73ec2","observation_id":"647bb793-2601-4851-a5b0-bb9630b69385","resolution":{"observed_at":"2026-08-07T05:09:39.682354Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:39.391493Z","title":"& Girard, R","venue":null,"work_id":"676d14f2-2d78-4ea7-932f-3ae0a29c5bf9","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.848970Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:8474784377d3c5c7e114e5bda1831562d7b59a53ea44e8c568d43f7ff89de0e8","observation_id":"28de120c-1c28-4e67-add0-b26fa77f6c29","resolution":{"observed_at":"2026-08-07T05:09:39.463916Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:39.190821Z","title":"& Hug, G","venue":null,"work_id":"1c6131d4-6189-4da6-85dd-8fc58d4c4875","year":2024},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:34.948411Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:6663a9b025e3ab5a9df0a0dd1dfaa4639e6fc25c72ae47d9cf24b2f544a17599","observation_id":"173d297c-fe21-4c9b-b0e5-d6d923dfe292","resolution":{"observed_at":"2026-08-07T05:09:39.293834Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:38.999006Z","title":"& Zerrahn, A","venue":null,"work_id":"00b92c0e-a755-46a9-be7a-7ecc5141cd0e","year":2021},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.062116Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:02440cf415e73c12856bb59e6f0d75f3f48911e22f63ed6e7c8408ca46db9980","observation_id":"38a47851-3005-4786-9ba5-73aec834e65e","resolution":{"observed_at":"2026-08-07T05:09:39.111732Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:38.798024Z","title":null,"venue":null,"work_id":"fbe1dbe4-1659-4386-9b88-910f26fb3887","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.163006Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:2f68cf2d0d36b2f12d41e731adf8223651b464a28d76d994864f7f01fccfcb52","observation_id":"a1300b5f-fb85-457b-a7dd-ab9995ae4166","resolution":{"observed_at":"2026-08-07T05:09:38.894051Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.5281/zenodo.15194721","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:37.003473Z","title":"& Hug, G","venue":null,"work_id":"6259438b-ed76-46dc-a012-c1ac9cf48d6d","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.258382Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:140569dfa548327a1aa1b8d3fb4b3f779fed81aa230fc2bf67232ebe7722615d","observation_id":"4d9b6f9c-2e0f-49eb-a185-fced3b5518f7","resolution":{"observed_at":"2026-08-07T05:09:37.113815Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:38.620127Z","title":"& Kristina, O","venue":null,"work_id":"2989fab3-bcd8-4b0b-b252-636274325224","year":2020},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.370432Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:1842c81dff46fc5a16598f7bfb7a2edb5c6e7c430bafbdb8a178e5e3c57994e9","observation_id":"8ac68159-d16f-405c-be90-6b9c045c308a","resolution":{"observed_at":"2026-08-07T05:09:38.705884Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:38.411594Z","title":"Residential & commercial building energy demand profiles under different retrofit scenarios (cesar model)","venue":null,"work_id":"066e8764-426a-4ba5-8c17-eca8154fe828","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.481077Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:c42950366cf3fbe30baace5020c2d995f3df23e261be83a995a61928f3d912c5","observation_id":"6a7494f9-1de9-4cb1-825a-4ebfec624de4","resolution":{"observed_at":"2026-08-07T05:09:38.505791Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:38.185457Z","title":"Quarter-hourly values of electricity consumption in grid levels 5 and 7 in the city of zurich, since 2015 https://data","venue":null,"work_id":"721b0522-bf2e-4691-81f5-8513b9f5976f","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.580885Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:bb100bed7b239a9e71be3c4dcce25c4df9f72adec3278245cd9c95386a959eb4","observation_id":"9d27aa9e-3c69-4367-9cb5-bbbc2fc86897","resolution":{"observed_at":"2026-08-07T05:09:38.279938Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:37.959943Z","title":"& Y oung, D","venue":null,"work_id":"7547d167-6de3-4200-93cc-f001fb6d6be1","year":2023},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.684792Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:42c9804d932c91a7571427de2b9997828883531ea5d6a6aad2477534ebfb322a","observation_id":"2ec246a4-2165-4054-9cbe-816c8d0e53de","resolution":{"observed_at":"2026-08-07T05:09:38.068947Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:37.682582Z","title":"Planet dump retrieved from","venue":null,"work_id":"88f3d419-eff6-4e3b-b9cb-75c8797a3ff8","year":2017},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.803040Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:28530884a6946597035b3003dad7f7c15369fef704570aa8cfee4fcffc3c6cab","observation_id":"474fda0c-ba42-46a4-8a9e-cd49ffb69b31","resolution":{"observed_at":"2026-08-07T05:09:37.786981Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:37.439857Z","title":"Federal Register of Buildings and Dwellings https://www.bfs.admin.ch/bfs/en/home/register/gebaeude- wohnungsregister (2015)","venue":null,"work_id":"bf4d9154-3aa5-41d3-8666-208eb51f5a97","year":2015},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.893761Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:05b050af00a1c206bdf56ee80ee0454789a2e0400e6e3e6f86776ea71fc19b4d","observation_id":"fbe7b73f-5269-4638-9db8-09aad8443b81","resolution":{"observed_at":"2026-08-07T05:09:37.559082Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.5281/zenodo.15167589","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:36.834682Z","title":"E., Tettamanti, F ., Gjorgiev, B","venue":null,"work_id":"0a509e80-b42c-4b9d-886f-81fc17b81249","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:35.964733Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:ce8a950538385d801e765ba41cc318a41319d41741ed6881d4d5c92943ba4bce","observation_id":"59617f69-74b9-41ce-a48d-c5ccb84592e6","resolution":{"observed_at":"2026-08-07T05:09:36.918268Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.5281/zenodo.15056134","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:36.645029Z","title":null,"venue":null,"work_id":"d4914216-dc0b-4889-9a53-656355c067dd","year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:36.070397Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:2765172ad85b50029748e0e0861929db571ddb037cf0704bb0076746555b172a","observation_id":"e6db557f-c693-4f87-910d-c43436c06130","resolution":{"observed_at":"2026-08-07T05:09:36.727463Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:37.249946Z","title":"swissboundaries3d File: swissboundaries3d_2022-01_2056_5728.shp, Accessed: 2025-04-01 https://www.swisstopo.admin.ch/de/landschaftsmodell-swissboundaries3d (2022)","venue":null,"work_id":"3cf21051-f84e-4e08-b2a9-88d94a968ab7","year":2022},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:36.156919Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:c2961e6562f30751e9c353f4e5751b4d58704cbbad0ab91426f5e2f78aa82a7e","observation_id":"d2e8a6d0-14e3-4321-ac66-bc0513fb5b63","resolution":{"observed_at":"2026-08-07T05:09:37.323143Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.5281/zenodo.3609833","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:36.471917Z","title":"Rooftop photovoltaic (pv) potential data for the swiss building stock https://doi.org/10.5281/zenodo.3609833 (2020)","venue":null,"work_id":"4bfeaba3-fdc9-4049-b3ce-f81e93d1be3f","year":2020},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:36.253921Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:0a5f6f18a391eb9b47de7d1c76f895a5086572e043fcb631cfaa68cf8b4b8a43","observation_id":"bd38c6a1-4cde-49aa-8ef3-861d8853dbc0","resolution":{"observed_at":"2026-08-07T05:09:36.533035Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:09:36.357118Z","title":"Temperature profiles for weather stations","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland","version":3},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-07T05:09:36.357118Z"},"links":{"citing_paper":"/paper/2506.08724"},"observation_digest":"sha256:6cdea01ccd6b4da90519d402a398ac59e624a0bef618edfec00957a92f24dcc6","observation_id":"f82d9fdd-90f5-499c-9add-f5efdbfbb9c7","resolution":{"observed_at":"2026-08-07T05:09:36.357118Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2506.08724","last_updated":"2025-08-27T15:32:34Z","latest_version":3,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T05:01:15.098630Z","submitted_at":"2025-06-10T12:18:53Z","title":"Future Deployment and Flexibility of Distributed Energy Resources in the Distribution Grids of Switzerland"},"reference_resolution":{"displayed":53,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":11,"verified_exact":4,"verified_fuzzy":38},"total_outbound_references":53},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 53 of 53 outbound references and 0 inbound Pith citation observations for arXiv:2506.08724."}