{"as_of":"2026-08-19T11:49:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:52a811ce25a0f0c7ec2d75b6d3f94999d35a41003566d26a013614503e755232","coverage":[{"denominator":8,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":8,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T20:54:10.496622Z","state":"measured"},{"denominator":8,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":8,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-19T06:32:44.657259+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.01462/citation-record","integrity":"/paper/2507.01462/integrity","json":"/paper/2507.01462/citation-record.json","paper":"/paper/2507.01462"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:12.167661Z","title":null,"venue":null,"work_id":"5aac8f6f-29d7-489e-942e-83a28efd1a16","year":2023},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:09.560418Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:2720cb0f66c1011c1f46cee622826c2ea50e7b281f744c9d3a65210283663141","observation_id":"ce5e1ffe-2218-48e2-9903-e678b87918d1","resolution":{"observed_at":"2026-08-06T20:54:12.336208Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:11.853230Z","title":"Abbas, A","venue":null,"work_id":"44a7d6cd-b2b1-485d-973d-73e249e2e48f","year":2024},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:09.654381Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:00b96dcec91ddabb88c3f47cc0a1e65bff064a7353637afb7a7f6bf0b055919a","observation_id":"8cced206-aa86-4756-8f14-17fae97b9b34","resolution":{"observed_at":"2026-08-06T20:54:11.983121Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:11.579052Z","title":"Garrote, G","venue":null,"work_id":"4657f962-5deb-458a-816f-e8477193803b","year":2024},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:09.790856Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:e0c0603a966cf83d1a645dd3f82c89d76d4a867457fba6d057f92d60b6af05ab","observation_id":"f4888ca1-0eaf-4f2d-ada4-a32827ffd9e1","resolution":{"observed_at":"2026-08-06T20:54:11.733638Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:11.331666Z","title":null,"venue":null,"work_id":"bfe35bb0-050d-47ae-85d0-d4a14be05e89","year":2020},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:09.962437Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:c1f10113a4c3ee96e98545cabcf45a48aa6bc3a3fba5fe2588a1cdad3b12fcd2","observation_id":"5c074e7a-048b-4f17-bda1-4a300df8179a","resolution":{"observed_at":"2026-08-06T20:54:11.442873Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:11.084516Z","title":"Osaba and P","venue":null,"work_id":"1a15ee36-c2fc-4fc0-bfb3-14681a8ba3c7","year":2025},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:10.105456Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:611fb085b84ac6ed3e371f1b512518f77219c191f37b263707756581ee6f8942","observation_id":"5c7faef0-f66f-48f9-b49f-0bde0177247c","resolution":{"observed_at":"2026-08-06T20:54:11.187679Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:10.774668Z","title":"Benoit and P","venue":null,"work_id":"135c9719-020e-4a28-9686-a2572608ceba","year":2024},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:10.216516Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:9fc94d95321cc25ccc83f7dc3f1f4b02d928ad6d36e5052d71a4c124ba54f3ad","observation_id":"d04360ff-3d90-4126-ba29-6c93550524ee","resolution":{"observed_at":"2026-08-06T20:54:10.924777Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:10.364554Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:10.364554Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:8e5e1889e3a02dfb39019ca24e1b3d52b3239f95023a749bfa9fe752842446dd","observation_id":"1b9959f2-4c4e-4d5d-a4a0-43f2f52af854","resolution":{"observed_at":"2026-08-06T20:54:10.364554Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T20:54:10.496622Z","title":"uwݣT_+ r 0 `^@ee _ /O?E Q s*)AH x#FP B 䜗8 Q1 <Ķ X@ QvrA*; ȯ bP","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-06T20:54:10.496622Z"},"links":{"citing_paper":"/paper/2507.01462"},"observation_digest":"sha256:4f19303776a2d71f0ae12752a5070800be31ad1ae9f1c6d84ef6ee82f6ff64d4","observation_id":"e2a7297d-63b9-4aa5-ab84-3167ab5d6b71","resolution":{"observed_at":"2026-08-06T20:54:10.496622Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2507.01462","last_updated":"2025-07-02T08:21:52Z","latest_version":1,"primary_category":"cs.RO","snapshot_observed_at":"2026-08-19T10:42:53.130734Z","submitted_at":"2025-07-02T08:21:52Z","title":"Quantum-Assisted Automatic Path-Planning for Robotic Quality Inspection in Industry 4.0"},"reference_resolution":{"displayed":8,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":4,"verified_exact":0,"verified_fuzzy":4},"total_outbound_references":8},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"thesis":"As of 19 August 2026, this Paper Citation Record lists 8 of 8 outbound references and 0 inbound Pith citation observations for arXiv:2507.01462."}