{"as_of":"2026-08-14T09:51:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:a4546de280e0d8b7914ea7ad3e7c732603b3a9765473e7941e5efa640fb04452","coverage":[{"denominator":49,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":49,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T19:19:15.422421Z","state":"measured"},{"denominator":49,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":49,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-14T06:32:32.682623+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.05910/citation-record","integrity":"/paper/2507.05910/integrity","json":"/paper/2507.05910/citation-record.json","paper":"/paper/2507.05910"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.170847Z","title":"Nsga-ii phase balancing of primary distribution circuits by the reconnection of their circuit laterals and distribution transformers,","venue":null,"work_id":"c0df070c-3335-4921-a429-c839421deb42","year":2014},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.200426Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:29783fcf3677a65bc14cbef7f6d9c6f30b4dd0759f6f52772a0b8b7974064123","observation_id":"424b402a-82ca-400f-83a8-3441e0e34a10","resolution":{"observed_at":"2026-08-06T19:19:16.175930Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.156097Z","title":"A pso algorithm for phase load balancing in low voltage distribution networks,","venue":null,"work_id":"478fb421-b116-4585-8bf0-48b9c8c2fe16","year":2018},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.205811Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:42ca0b53f8f6fa986a7c5da198fa4cbee455716244beb076b279c631f3e55ef8","observation_id":"4b071b59-5adc-4028-8e0e-960258ebf352","resolution":{"observed_at":"2026-08-06T19:19:16.161155Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.142263Z","title":"Phase load balancing in low voltage distribution networks using metaheuristic algorithms,","venue":null,"work_id":"d70b8db6-639f-425a-9bd0-bf0592c643ac","year":2019},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.210394Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:c334072fd17e25f7246272242afed5f7225e9aac6dcffd3f488adaaf6dae7603","observation_id":"f8d43367-9666-473a-b808-89bbb7b0d1a1","resolution":{"observed_at":"2026-08-06T19:19:16.147135Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.128170Z","title":"Phase reassignment for load balance in low-voltage distribution networks,","venue":null,"work_id":"32ca36e6-09cb-420f-ab05-f3f9566943ed","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.215078Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:4774e93b6639f15e17333a367da88180fb7c7f6dfd2b9010758c48a5b9d67e49","observation_id":"e66fd3e6-df03-47b9-9751-70d3a6ce36dd","resolution":{"observed_at":"2026-08-06T19:19:16.132650Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2207.05059","last_updated":"2022-07-08T11:17:57Z","snapshot_observed_at":"2026-08-13T15:08:17.957810Z","submitted_at":"2022-07-08T11:17:57Z","title":"Optimal Connection Phase Selection of Residential Distributed Energy Resources and its Impact on Aggregated Demand","version":1},"cited_work":{"arxiv_id":"2207.05059","doi":null,"metadata_source":"pith","pith_arxiv_id":"2207.05059","snapshot_observed_at":"2026-08-06T19:19:15.520220Z","title":"Optimal Connection Phase Selection of Residential Distributed Energy Resources and its Impact on Aggregated Demand","venue":"cs.CE","work_id":"92f38365-aec8-4024-b90e-e799c8fac0c9","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.220150Z"},"links":{"cited_paper":"/paper/2207.05059","citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:6f84b9175f485f907a423aefac1db2b2121df31ec0552dbf4865f9516c8bb368","observation_id":"9d5ff322-64fb-424b-9b4e-d9dda799e2c7","resolution":{"observed_at":"2026-08-06T19:19:15.524920Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.113808Z","title":"Optimal connection phase selection for single-phase electrical vehicle chargers,","venue":null,"work_id":"f6b7554d-46b5-42d9-ba6e-cab69cd9da5f","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.225042Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:2df6687e0683284e820cdcab99dd94225ccbf24eb14528ea27324f6e33c62c29","observation_id":"1e028d4f-c7c1-45f9-a0a0-b4d665af03ec","resolution":{"observed_at":"2026-08-06T19:19:16.118332Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.100166Z","title":"An analytical approach for phase balancing considering customer load profile,","venue":null,"work_id":"1c0a3d7d-fd02-48ef-8b44-749af77b8800","year":2019},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.230641Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:41c31371d34def8ddd6176d61e4ee4c1d1d8db8052c7a33d3610bcf0ea3a15e5","observation_id":"514d29ab-a2d3-408e-98b3-8caa132f4a95","resolution":{"observed_at":"2026-08-06T19:19:16.104995Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.085753Z","title":"Impact of phase selection on accuracy and scalability in calculating distributed energy resources hosting capacity,","venue":null,"work_id":"348f68d2-cd08-41eb-9479-969ce4fa7e63","year":2024},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.234734Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:85ba3ecd8772a33295d460fb427d8421b1d5d801a27255c10a400fa167d13298","observation_id":"bb9cd2fa-5c73-4678-8a49-ceacdbfbd61d","resolution":{"observed_at":"2026-08-06T19:19:16.090411Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.070794Z","title":"Phase reconfiguration for power distribution networks with high ders penetration,","venue":null,"work_id":"8c1f63c3-6f49-45ce-80b9-ebaaf5dc2285","year":2025},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.239041Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:1b8840fb727abf1662576f3152921de1c969ce0c58d54467ac456ff78d6ebb9a","observation_id":"64335bdc-3a42-4233-946e-87a24c5562e3","resolution":{"observed_at":"2026-08-06T19:19:16.075889Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.057235Z","title":"Phase balancing algorithms,","venue":null,"work_id":"13b22e6f-d607-4a1a-99dc-a97e1b02fc75","year":2013},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.243904Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:a2f629374b97898ee5843af49760219fcd3c14664f609a859c89f07f758fc1f1","observation_id":"f2e409d3-2c15-4cf0-8bb8-808a7b64b2b3","resolution":{"observed_at":"2026-08-06T19:19:16.061767Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.043122Z","title":"Load balancing in low-voltage distribution networks via optimizing residential phase connec- tions,","venue":null,"work_id":"aea28b6e-eba0-49c4-9419-2b4652beb085","year":2021},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.249140Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:5854101cd725a9ba13aea392429a6d5b115b9962be715c64b791a5549408dd75","observation_id":"b57760fd-9b37-4cd3-bfb9-d0c949555c02","resolution":{"observed_at":"2026-08-06T19:19:16.048022Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.028990Z","title":"Stochastic multiobjective distribution systems phase balancing considering distributed energy resources,","venue":null,"work_id":"fce24612-600a-4a9f-be36-3fe7422bc79e","year":2018},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.253437Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:48bbae000fe705fb5624bd5366867fd6fa9144311007370d0367ad4b4409ad77","observation_id":"2f9f8695-1556-4cff-834d-0ad1a681a7ab","resolution":{"observed_at":"2026-08-06T19:19:16.033886Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:16.014602Z","title":"Integration of centralized and distributed methods to mitigate voltage unbalance using solar inverters,","venue":null,"work_id":"a8935b43-3b04-4dbd-a36e-60164ceaaa26","year":2023},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.257644Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:f6252884331cdf780a7db83e0c03ebc40cf9f0edc9b3d249fdefb948bdb22520","observation_id":"359de26b-b11d-4911-82a7-fdcdd7e146dc","resolution":{"observed_at":"2026-08-06T19:19:16.019603Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.998899Z","title":"A system optimization method for mitigating three-phase imbalance in distribution network,","venue":null,"work_id":"efaba114-4a36-4b3e-8e16-15253963c032","year":2019},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.261921Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:cdb899c20f0d6025717f58551e19350b341092ecc299a5e4049801e77ff67293","observation_id":"b6b1650f-eb35-44b4-abeb-0aeea3ccb069","resolution":{"observed_at":"2026-08-06T19:19:16.003765Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.983097Z","title":"Unbalance mitigation via phase-switching device and static var compensator in low-voltage distribution network,","venue":null,"work_id":"313198f9-3d9b-4687-87b7-f3bacea97c26","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.266268Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:3e8238dcfef03457f1f56e96b8730dfc7a7c617c24f8a3e75d1f7e795ce11fd0","observation_id":"2e3f3319-3543-46d9-9db3-92e02ab8172a","resolution":{"observed_at":"2026-08-06T19:19:15.988713Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.968284Z","title":"Phase switching and phase balancing to cope with a massive photovoltaic penetration,","venue":null,"work_id":"5c3d3899-d424-419b-aed3-f5cd542642c8","year":2013},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.271394Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:552ddaefa82626b203a378645a9ed0d1a970a72a9ea974bb2bfdd3bba729e903","observation_id":"450e124c-e480-495f-82b9-1d8697a18df0","resolution":{"observed_at":"2026-08-06T19:19:15.973631Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.953212Z","title":"On the impact of different voltage unbalance metrics in distribution system optimization,","venue":null,"work_id":"495dd6d1-352c-408d-8b54-b699fd3a9f0c","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.276412Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:ac8dd1b3582f35d0f8dbd54f0fc6182ace6f77af605696c9535324a3149fbb60","observation_id":"7f44bfaf-edb6-4faf-87df-f15fddda2206","resolution":{"observed_at":"2026-08-06T19:19:15.958030Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.938470Z","title":"Coordinated optimisation of pev charging with the support of reactive discharging and phase switching in unbalanced active distribution networks,","venue":null,"work_id":"f70f59c0-d57c-48ce-9fbf-63a46f5c5ae9","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.280577Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:98d3d6bbad89dcc8e50d6b0b708942c20acdd3813cf708e297f4a8280838a161","observation_id":"92f896db-fbfa-4171-bcfe-301bd99803bb","resolution":{"observed_at":"2026-08-06T19:19:15.943886Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.923572Z","title":"A game theoretic approach to phase balancing by plug-in electric vehicles in the smart grid,","venue":null,"work_id":"d9b4378e-d377-4e43-9d10-23e938738c62","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.285454Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:2d17b3c27b404d04df0f563dc87c69aa0f7f28b12e81fae4117cc1412995a869","observation_id":"b6961e27-c9fe-4365-a06b-9bb6f211ce88","resolution":{"observed_at":"2026-08-06T19:19:15.929321Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.909053Z","title":"Incentive-based demand response program with phase unbalance mitigation: A bilevel approach,","venue":null,"work_id":"50ada76c-b728-4699-9270-5d05a5bb8060","year":2025},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.289552Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:e39df3032ce935b9a6333ac5d16cbac024061587935730d2175631c5ddfdf8ce","observation_id":"9d3cf3fe-b82f-4358-8bb8-1e8202dbc138","resolution":{"observed_at":"2026-08-06T19:19:15.914213Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.894178Z","title":"Reconfiguration and load balancing in the lv and mv distribution networks for optimal performance,","venue":null,"work_id":"ed7b0b63-749f-4fdc-9227-72311232d565","year":2007},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.294435Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:dfc087a114585adf6235dcf4bb3653596df366c8dfd3ccecb31591cbab7efcce","observation_id":"d54bfe8b-37fc-4c07-bc0d-4392cb8ce130","resolution":{"observed_at":"2026-08-06T19:19:15.898841Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.879252Z","title":"Load balancing in low-voltage distribution network via phase reconfiguration: An efficient sensitivity-based approach,","venue":null,"work_id":"6ec8851f-8838-444d-b484-759f6e43d819","year":2021},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.299417Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:586650b009157260acc3fb6edf3760ba2a1f9fa4e2b1dd5334666bfe3b0d4eae","observation_id":"b9c843e7-db68-444c-a9a8-dbc669f369a5","resolution":{"observed_at":"2026-08-06T19:19:15.883761Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1810.00425","last_updated":"2018-09-30T17:19:49Z","snapshot_observed_at":"2026-07-06T07:05:12.052933Z","submitted_at":"2018-09-30T17:19:49Z","title":"Robust Look-ahead Three-phase Balancing of Uncertain Distribution Loads","version":1},"cited_work":{"arxiv_id":"1810.00425","doi":null,"metadata_source":"pith","pith_arxiv_id":"1810.00425","snapshot_observed_at":"2026-08-06T19:19:15.499543Z","title":"Robust Look-ahead Three-phase Balancing of Uncertain Distribution Loads","venue":"math.OC","work_id":"b1f25bc6-21fc-4c1b-bd4c-ff5d5b8bcab2","year":2018},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.303646Z"},"links":{"cited_paper":"/paper/1810.00425","citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:474312c091f34b2bdc7a47883cc5b369f726fb9707d3b37d25bde28ccc50ca76","observation_id":"61f1e2bf-1501-44e2-bec0-92070f71b72b","resolution":{"observed_at":"2026-08-06T19:19:15.505018Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.863909Z","title":"A two-level coordination strategy for distribution network balancing,","venue":null,"work_id":"1ea2ce36-d303-43ed-ace5-fed814d7d3a8","year":2024},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.308297Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:c210a943a785af06bba5c32588790855d11949b1e3abfdae08e37f6e4bb645af","observation_id":"f5967b50-6777-4d76-8860-46e335def1d4","resolution":{"observed_at":"2026-08-06T19:19:15.868611Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.850125Z","title":"On per-phase topology control and switching in emerging distribution systems,","venue":null,"work_id":"8bb118cf-dfff-4fe2-aaab-8e8e336a7094","year":2018},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.313429Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:0e7f9d0bce51596f3ace44c493c1e0809f0df0e00bd9de81322a92c043208ebc","observation_id":"f3967a5f-d46e-4200-ac4c-3bcc4bf87300","resolution":{"observed_at":"2026-08-06T19:19:15.854459Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.835512Z","title":"Economic assessment of phase reconfiguration to mitigate the unbalance due to plug-in electric vehicles charging,","venue":null,"work_id":"d643dc72-9be7-4abf-b42a-86c0edaa689d","year":2016},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.317573Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:0d12a211b39399bcb23d9b6bb60055aa3367b4a39bd4599bef7456fa8730b896","observation_id":"17664f5e-8ca2-449f-bb21-a33184b689fb","resolution":{"observed_at":"2026-08-06T19:19:15.840165Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.821277Z","title":"Voltage unbalance reduction in low voltage feeders by dynamic switching of residential customers among three phases,","venue":null,"work_id":"b7ce0156-e871-4b79-bbc8-e680dc423411","year":2014},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.322890Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:d23e522e9165ab1996edefdc3e610488268b1b985366bc5667a51d7eb24a13eb","observation_id":"2a422ce3-91ac-4e6a-b64b-1dcf4f9f5ec4","resolution":{"observed_at":"2026-08-06T19:19:15.826243Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.806600Z","title":"Dynamic phase balancing in the smart distribution networks,","venue":null,"work_id":"f7932e5c-e01c-49cc-87df-061ccdc6284a","year":2017},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.327455Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:21c550e1dd412c8e94f210f8f8ac7d9620df36c43478fdbdffbeeb8abb2fc788","observation_id":"4f05d0b9-440a-419a-8f0d-6cc268fd3d99","resolution":{"observed_at":"2026-08-06T19:19:15.811317Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.792784Z","title":"Smart meter-based re-phasing for voltage imbalance enhancement through topology reconstruction,","venue":null,"work_id":"674dd600-bd94-495d-85ea-e48e151509e5","year":2023},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.331738Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:b18ed2bfa512cbdb72c95444844c6e89abf96c03ded8dc93e311cfdafa676ca1","observation_id":"7eaab9ed-a00f-415e-b02d-97dce0b4d2e3","resolution":{"observed_at":"2026-08-06T19:19:15.797317Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.778318Z","title":"Mitigation of voltage unbalance in distribution feeders using phase switching devices: A decentralized control approach based on local measurements,","venue":null,"work_id":"4af35f7f-28f6-4c78-b74b-1b50e2cef20b","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.336787Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:45e7f3d58ae42f06f5a6589c93e1381bb1c9d8c1eb39ef22395d2bafe47e851c","observation_id":"eb38d74b-1166-4988-a4dd-186eb7a2ef61","resolution":{"observed_at":"2026-08-06T19:19:15.783271Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.763890Z","title":"Jemena DER hosting capacity project interim knowledge sharing report,","venue":null,"work_id":"7640099f-397a-4372-b66d-a8b0b671f5cd","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.341097Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:c1736776738e3252cc1b6eedd18df2b918b638dc370a8490cd2e1e206507aed8","observation_id":"d1154480-2427-4811-933d-6b69dee3d59d","resolution":{"observed_at":"2026-08-06T19:19:15.768301Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.750177Z","title":"Fuzzy optimal phase balancing of radial and meshed distribution networks using bf-pso algorithm,","venue":null,"work_id":"5b7ddcd8-81ca-4824-8c18-76677e443cf9","year":2012},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.346280Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:edae1f30537205a89692d37454e7e2bc41ed8b6ed27425f1700de7d6a239de40","observation_id":"7f9898fa-dfa2-4c84-86a2-d90da572360f","resolution":{"observed_at":"2026-08-06T19:19:15.754548Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.736324Z","title":"Metaheuristics approaches to solve combinatorial opti- mization problems in distribution power systems. an application to phase balancing in low voltage three-phase networks,","venue":null,"work_id":"81265565-e0ef-4690-ab92-6149e19c0257","year":2016},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.350485Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:fb117633c0fc6755f6932380f09df4304b310cf9baf071d5369e8d05b391ab89","observation_id":"d14ed54c-3c23-4b6f-8766-9833ff002954","resolution":{"observed_at":"2026-08-06T19:19:15.741006Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.722712Z","title":"Phase balancing in power distribution systems: A heuristic approach based on group-theory,","venue":null,"work_id":"809602c6-a117-4206-99fd-3f9bdc135de5","year":2019},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.355345Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:fd264643e4ca9f98bf48e7aed95381f900c9955d6767dc3060cfac4173b772e8","observation_id":"8632179e-4334-48d0-b142-316880170a48","resolution":{"observed_at":"2026-08-06T19:19:15.727219Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.709033Z","title":"Comparisons of energy loss reduction by phase balancing in unbalance distribution networks via metaheuristic algorithms,","venue":null,"work_id":"435483b6-3c3b-43f7-83a2-5c181e27c9bf","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.359384Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:1c1e431062f218aa27d69af4b5afecf41d0403d2f79a909ed161a33f092d2aca","observation_id":"43a91954-8fc4-4934-8199-af7ad2679d03","resolution":{"observed_at":"2026-08-06T19:19:15.713635Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.694904Z","title":"Planning of optimal phase balancing for an unbalanced distribution system: A case study of cambodia,","venue":null,"work_id":"9b3f2990-3f38-4cde-9b0c-67c34dfe0444","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.363561Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:37a7a2a8238e028ef314cbfde07e92342eae0137438c2093dd00a33871c9c007","observation_id":"161aa937-7209-48dc-91c3-be70cf3e7c7a","resolution":{"observed_at":"2026-08-06T19:19:15.699783Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.681161Z","title":"Phase rebalancing of distribution circuits dominated by single- phase loads,","venue":null,"work_id":"555e4cbd-6bd5-48d6-8f8e-5d090299972e","year":2021},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.368548Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:14ac6cde09e490764174dce8744ed1b508283123e26625d16d7b28a420f8eaa7","observation_id":"1edcbe0b-715f-4675-87b2-7ed444b10bcc","resolution":{"observed_at":"2026-08-06T19:19:15.685523Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.667006Z","title":"Comparison of linear and conic power flow formulations for unbalanced low voltage network optimization,","venue":null,"work_id":"5eeaaec5-e92c-4ecd-bbfc-1600ce026902","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.372958Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:2309a2445a55ce072e33ba8d697ae60652dee1df41d67c3d6578e6f775add741","observation_id":"be86e362-eb6d-494b-8e3f-eab0721497b0","resolution":{"observed_at":"2026-08-06T19:19:15.671367Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2106.06186","last_updated":"2023-08-21T06:41:49Z","snapshot_observed_at":"2026-08-13T19:05:23.860549Z","submitted_at":"2021-06-11T06:20:11Z","title":"Real-Value Power-Voltage Formulations of, and Bounds for, Three-Wire Unbalanced Optimal Power Flow","version":2},"cited_work":{"arxiv_id":"2106.06186","doi":null,"metadata_source":"pith","pith_arxiv_id":"2106.06186","snapshot_observed_at":"2026-08-06T19:19:15.479368Z","title":"Real-Value Power-Voltage Formulations of, and Bounds for, Three-Wire Unbalanced Optimal Power Flow","venue":"math.OC","work_id":"02012379-2748-49d9-8e95-9d5dfccf354c","year":2021},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.377931Z"},"links":{"cited_paper":"/paper/2106.06186","citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:67ceea28b1f0e9c31a26b9c9f2d591488ee00f2f5600f58025a697bc22b06e29","observation_id":"98e0992d-2fd0-4858-b173-f4f4bdb99f9d","resolution":{"observed_at":"2026-08-06T19:19:15.484046Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.653559Z","title":"A linearized power flow model for optimization in unbalanced distribution systems,","venue":null,"work_id":"4b8110e4-f0b9-41de-95da-a552a593378f","year":2016},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.382309Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:5872adea4d9fd25f161bca4d473f6a67782d9ba64c5e4b15301a9f2a10cca328","observation_id":"306a3836-3631-4a0d-ad3b-4f7b9de2125f","resolution":{"observed_at":"2026-08-06T19:19:15.657818Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.639969Z","title":"Powermodelsdistribution.jl: An open-source framework for exploring distribution power flow formulations,","venue":null,"work_id":"b76d6e13-24dc-4a01-b569-08928e6ecbb2","year":2020},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.387277Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:45ff497c9728ebb8b4971c97d3c36ec7d4a2f43ea3beb6ca6ede78b41f577996","observation_id":"89045f5f-a249-4a78-9d4e-33f14d8812e5","resolution":{"observed_at":"2026-08-06T19:19:15.644337Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2305.04405","last_updated":"2023-05-08T01:17:28Z","snapshot_observed_at":"2026-08-13T11:47:36.973450Z","submitted_at":"2023-05-08T01:17:28Z","title":"On the Implementation of the Fixed Point Iteration Current Injection Method to Solve Four-Wire Unbalanced Power Flow in PowerModelsDistribution.jl","version":1},"cited_work":{"arxiv_id":"2305.04405","doi":null,"metadata_source":"pith","pith_arxiv_id":"2305.04405","snapshot_observed_at":"2026-08-06T19:19:15.456990Z","title":"On the Implementation of the Fixed Point Iteration Current Injection Method to Solve Four-Wire Unbalanced Power Flow in PowerModelsDistribution.jl","venue":"math.OC","work_id":"654e6bec-0b48-40ba-a0d4-66a683d0575a","year":2023},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.391222Z"},"links":{"cited_paper":"/paper/2305.04405","citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:a4b3a498ef5a54dafe859c10e5a7d0adeee40f54cf78f13d3c763b6652eb3c74","observation_id":"1b2710ac-6222-4d3f-b847-2657d4309333","resolution":{"observed_at":"2026-08-06T19:19:15.463676Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.625207Z","title":"Phase identification of distribution system users through a milp extension of state estimation,","venue":null,"work_id":"43fa8492-a2c4-4229-a8c1-26f667ebf9c3","year":2024},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.395744Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:34a2e93cab6e8e7e01a49676d50866328abf2831253fdfe7aeede33aacc64eca","observation_id":"a89bd03b-ea13-4e22-a306-b3e1416c9ff6","resolution":{"observed_at":"2026-08-06T19:19:15.629763Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.610460Z","title":"Genetic algorithm essentials. volume 679 of studies in computational intelligence,","venue":null,"work_id":"cd619bc2-57c7-4b6e-bfd8-4239384b4f21","year":2017},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.401015Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:7499f9ff24e07b1d4f03430f6c64b26fa0375d91d7223ec648386749a23af2d5","observation_id":"5af80cda-d78a-4d0f-b04f-e6712b03507a","resolution":{"observed_at":"2026-08-06T19:19:15.615342Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.594971Z","title":"Low voltage networks models and low carbon technology profiles,","venue":null,"work_id":"360cca7b-b65a-45ce-9805-75d4b0e1dc22","year":2015},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.405124Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:d3b4be117756789f3f646076ed0907233e96a05d8dd7ddf54db38f2c7ace86c4","observation_id":"4f12ea4e-eba3-42ab-a2b4-cb6a751d2823","resolution":{"observed_at":"2026-08-06T19:19:15.600263Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.580204Z","title":"End-use load profiles for the us building stock: Methodology and results of model calibra- tion, validation, and uncertainty quantification,","venue":null,"work_id":"9ad951c8-5478-45be-bcc5-84c63a8d5346","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.409316Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:58ae45921495ac780b39e3dce5cbbc9f28caeed7335bc38dd124d70d6a809412","observation_id":"580edaf0-f686-47d7-9210-123bc641ccbc","resolution":{"observed_at":"2026-08-06T19:19:15.585790Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.564835Z","title":"Juniper: An open-source nonlinear branch-and-bound solver in julia,","venue":null,"work_id":"205e5d0f-585f-413c-81ef-a1e94f30894b","year":2018},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.413758Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:167819c58daaaedab93261d3703bd9b65d04f005f5b8a2252e18217cefc5ad37","observation_id":"1a782117-2a19-4cfe-8e25-ac11ef7ee531","resolution":{"observed_at":"2026-08-06T19:19:15.570229Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.549561Z","title":"On the implementation of an interior-point filter line-search algorithm for large-scale nonlinear programming,","venue":null,"work_id":"2793dfdb-8618-4845-80d1-bc89b447e9c7","year":2006},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.418031Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:14427ab8670f14b28e7f40910dd39c176e198ed1cbae06cc45748b6e2b864a52","observation_id":"7c634ed5-c3af-4fff-8e72-d014cbdaa1f6","resolution":{"observed_at":"2026-08-06T19:19:15.554830Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T19:19:15.535357Z","title":"Metaheuristics: A julia package for single- and multi-objective optimization,","venue":null,"work_id":"7c7e9429-3523-464b-bbda-a4eaaf79d516","year":2022},"citing_paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-06T19:19:15.422421Z"},"links":{"citing_paper":"/paper/2507.05910"},"observation_digest":"sha256:9d03174ae26dc4ddb467147035d901cdc7b7af5942bb6f7c287ec464138a1d29","observation_id":"46e48f73-ce9a-4367-b370-81cbee839e8a","resolution":{"observed_at":"2026-08-06T19:19:15.539744Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.05910","last_updated":"2025-07-08T11:56:28Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-09T10:49:40.471612Z","submitted_at":"2025-07-08T11:56:28Z","title":"Low voltage user phase reconfiguration as a planning problem"},"reference_resolution":{"displayed":49,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":4,"verified_fuzzy":45},"total_outbound_references":49},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"thesis":"As of 14 August 2026, this Paper Citation Record lists 49 of 49 outbound references and 0 inbound Pith citation observations for arXiv:2507.05910."}