{"as_of":"2026-08-09T19:24:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:1a5a86f88eb99c99467bcedf2fbf9c79bb50050f062aa46938da59fee3920fcb","coverage":[{"denominator":57,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":57,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T18:17:11.378554Z","state":"measured"},{"denominator":58,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":58,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-09T06:31:02.800959+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-07-31T16:45:20.442048Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2507.09134","snapshot_observed_at":"2026-07-31T16:45:20.442048Z","title":"arXiv preprint arXiv:2507.09134 , year=","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.24369","last_updated":"2026-07-27T12:42:38Z","snapshot_observed_at":"2026-08-08T03:02:01.463425Z","submitted_at":"2026-07-27T12:42:38Z","title":"Model Predictive Planner for UAV Navigation in Non-Convex Air Corridors","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-07-31T16:45:20.442048Z"},"links":{"cited_paper":"/paper/2507.09134","citing_paper":"/paper/2607.24369"},"observation_digest":"sha256:87ddf32297ce183694fa0d71046419c6b39f17b606c7c12dbbf21911a09e02c6","observation_id":"ee8e463c-4723-4066-9236-075673a90df4","resolution":{"observed_at":"2026-07-31T16:45:20.442048Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2507.09134/citation-record","integrity":"/paper/2507.09134/integrity","json":"/paper/2507.09134/citation-record.json","paper":"/paper/2507.09134"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:20.248052Z","title":null,"venue":null,"work_id":"8b660c94-65ba-46b5-9ed5-70a3494e03ca","year":null},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.312743Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:be7aa090d69fb59ce248c271e23873ed57606fbe898d5d159feb4f734f9113eb","observation_id":"f56e30ef-75d2-442b-824f-a72f63013b71","resolution":{"observed_at":"2026-08-06T18:17:20.348473Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:20.105151Z","title":"In this paper, we focus on nominal MPC without explicitly considering disturbances for brevity and to better focus on our novel contribution","venue":null,"work_id":"1c9c9959-185d-48b2-8d61-218289339020","year":null},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.383870Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:dce0b8675839716b14092eab4dec228d50145d1bfcce61dc69ee68603801ad5a","observation_id":"9b7ec881-824a-4350-a65b-0ebc1265d923","resolution":{"observed_at":"2026-08-06T18:17:20.174788Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.442079Z","title":"Path planning of automated guided vehicles based on improved A-star algorithm,","venue":null,"work_id":"7e2b4002-724c-45be-88cb-182bd1c5c9a3","year":2015},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.763326Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:8ce39c96fdbcc63b0a2ee1b6654e2aa0f5f9d0f9f40675a3e58edc3cf4fb3770","observation_id":"c5f6fbfc-439c-4bd0-8024-bda7af99dc9a","resolution":{"observed_at":"2026-08-06T18:17:19.499448Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.901828Z","title":"close enough","venue":null,"work_id":"ad7811fc-1f86-4f5a-be11-3e99efd53403","year":null},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.471041Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:4f079eb1efac001028327b2e78a22b7eba36f3df5a54f79cfc9e7678a29d1d9e","observation_id":"250a1605-a1b0-436c-a9cd-ce1c8eb92c4b","resolution":{"observed_at":"2026-08-06T18:17:20.026566Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.733720Z","title":"Inspection path planning for aerial vehicles via sampling-based sequential optimization,","venue":null,"work_id":"d6a0f685-8837-487d-bfe0-38853e3eb796","year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.546233Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:26037634463e2d20f89c58218ffed90273065f407f6a52179d5ae726872bac7c","observation_id":"fc8b4bf9-314b-4205-9e19-1e28534e5851","resolution":{"observed_at":"2026-08-06T18:17:19.802724Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.594626Z","title":"Path planning for automa- tion of surgery robot based on probabilistic roadmap and reinforcement learning,","venue":null,"work_id":"1d9e2495-9351-4f87-aad2-124fd2f65c5c","year":2018},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.627901Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:f75a1803a335098f39041d58f57affed27c8fedf2ca8061df0d49fc22f53581b","observation_id":"741dfb11-0050-4989-9f14-225ecde5a861","resolution":{"observed_at":"2026-08-06T18:17:19.657525Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:18.688871Z","title":"A survey on path planning algorithms for mobile robots,","venue":null,"work_id":"70cf4c7f-6293-4752-852d-a1acf1f53a60","year":2019},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.156545Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:fe75d9ca5fc6fff42a1c340df7ef110ed0dda4a987f58ec834fcb3cf4c78b75c","observation_id":"6e95fd2c-b014-4fe2-8125-edffd7de46e7","resolution":{"observed_at":"2026-08-06T18:17:18.812054Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.293986Z","title":"Uncertain moving obstacles avoiding method in 3d arbitrary path planning for a spher- ical underwater robot,","venue":null,"work_id":"21846d0b-84d1-4e1a-b005-4938c946ed74","year":2022},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.895845Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:562f320e397206f97ae53217911c197eb6a0c8a4b39df12c92c2103cafc80da6","observation_id":"350a847c-d936-466e-acdc-806b52b0bbb3","resolution":{"observed_at":"2026-08-06T18:17:19.356538Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:19.111365Z","title":"Gross motion planning—a survey,","venue":null,"work_id":"e41962b2-7f77-4bf9-be25-2b0ed80b37af","year":1992},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.989137Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:4178698cac8067e76af056aab8eebdfc367fae7e64a6a395a055881e732abe17","observation_id":"c9b336de-4666-43c6-9a50-d6b9068e06e7","resolution":{"observed_at":"2026-08-06T18:17:19.203681Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:18.895391Z","title":"Motion planning for mobile manipula- tors—a systematic review,","venue":null,"work_id":"0d63d2e7-64e5-4534-aa70-bd0b7637bc82","year":2022},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.066975Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:0c63cf5492338012de4ecbdde63292406479d831eabe39c2f630a30bc4299cd5","observation_id":"623d8636-b90e-4ae8-acf8-62f0766407c0","resolution":{"observed_at":"2026-08-06T18:17:19.018553Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.923687Z","title":"STOMP: Stochastic trajectory optimization for motion planning,","venue":null,"work_id":"8b79c935-c0b7-4de6-80e9-0d4ca9fe086a","year":2011},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.547936Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:e04f18e9a4b7b4056042f7f17e2830c2837b177c40e5d6716cab5634a81dc956","observation_id":"3965e183-32cc-485c-9b8e-05685408a717","resolution":{"observed_at":"2026-08-06T18:17:18.042538Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:18.493430Z","title":"A survey of path planning algorithms for mobile robots,","venue":null,"work_id":"89dbd744-faf5-4a0a-b2ba-13d38113fba6","year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.238161Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:c993ecc33ad61389de1b04c8fc250ea10b0ed461b6af7fa9eed921acea829d24","observation_id":"1a5867f7-912d-4f34-b62c-33c15aaed3c1","resolution":{"observed_at":"2026-08-06T18:17:18.583901Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:18.315396Z","title":"Brogan,Modern Control Theory","venue":null,"work_id":"e687024b-685d-4b83-b833-96542ba84076","year":1991},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.379677Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:66b229a56411c71d202cf6524ae3e736dce1efdeb229ddcc547f218c8835937a","observation_id":"e95a2f58-b048-4625-8c20-dac353e81830","resolution":{"observed_at":"2026-08-06T18:17:18.399771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:18.122370Z","title":"Goodwin, M","venue":null,"work_id":"f5f07289-d8fa-4103-87c8-febe5f75a90d","year":2006},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.482976Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:f1e1503b36743f6bd3e5e493ade8f07be3f4d74d4354c65547992304a3340dea","observation_id":"8a4741db-9401-42b0-845d-33b5f361f4d7","resolution":{"observed_at":"2026-08-06T18:17:18.205747Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.274200Z","title":"FASTER: Fast and safe tra- jectory planner for flights in unknown environments,","venue":null,"work_id":"1285c3c8-f63b-42b3-865e-c8d44207ea81","year":1934},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.922848Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:80d7397b0865a180998c10056e8cc5108d6d5c8fe4c5cafdbf71f24c216836fc","observation_id":"b8fc10a3-7925-412c-adf7-0e9f6c8c814b","resolution":{"observed_at":"2026-08-06T18:17:17.357608Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.728127Z","title":"Information theoretic MPC for model-based reinforcement learning,","venue":null,"work_id":"e9c88813-8d5c-48fe-addc-c04959bef8fd","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.644530Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:1ddf5dddb18d766c4d251d6fb1d65db43a55d259b4a108cc6a02cd22185a0f43","observation_id":"979cb21d-679b-4efe-b521-2f1a049084da","resolution":{"observed_at":"2026-08-06T18:17:17.818854Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.581167Z","title":"Robust real-time UA V replanning using guided gradient-based optimization and topological paths,","venue":null,"work_id":"3077d208-df17-46d2-ac24-5bebbdac5a46","year":2020},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.725691Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:98731468faf0acab811b2c9a95fea5cd25543e3f2877dc689d46eab77c0496bc","observation_id":"c8eed537-15b7-4005-89c0-b3e57a97bffd","resolution":{"observed_at":"2026-08-06T18:17:17.634597Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.421346Z","title":"Efficient trajectory planning for high speed flight in unknown environments,","venue":null,"work_id":"7c1ea5d7-82d8-480c-a7af-4dfbea8bbec9","year":2019},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:06.794200Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:427cc7f3cbf89361ab3879dc3cb1b922168c8bc20d6c91a0a9b13ba05e919e67","observation_id":"af6e4f46-df9b-4602-9efa-d74fb9f1d1eb","resolution":{"observed_at":"2026-08-06T18:17:17.494910Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:16.488315Z","title":"External forces resilient safe motion planning for quadrotor,","venue":null,"work_id":"898c339c-1771-4d78-91b4-a8341a717d4e","year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.291022Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:5a2347f305e005d43416321b5fbd72cc04f035e21819230f9412d8e75f87f018","observation_id":"a18f8f89-a8fe-455d-b1a5-06c67b32bdd4","resolution":{"observed_at":"2026-08-06T18:17:16.567143Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:17.103421Z","title":"Model predictive planning: Trajectory planning in obstruction-dense environments for low-agility aircraft,","venue":null,"work_id":"8318eb5f-85b2-41e0-ba65-b4db733ede26","year":2024},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.021372Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:da470e0e6aff65c105f17fa36dc7e8fc9950d2c42879dc0b0ffb5df66b25e3aa","observation_id":"974a8624-8a40-4281-ba60-fe7cd7ebf5cf","resolution":{"observed_at":"2026-08-06T18:17:17.155898Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:16.859045Z","title":"Planning dynamically feasible trajectories for quadrotors using safe flight corridors in 3-D complex environments,","venue":null,"work_id":"3bd70a5d-30d8-4ec4-bfc1-54b0403bb91d","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.111446Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:e903a35fbd328d2e34b95dc5f77683110965c2a7114a9ef2879f397f4167022a","observation_id":"a75256ba-d32b-4ddb-8a8f-190c3584b5e6","resolution":{"observed_at":"2026-08-06T18:17:16.951469Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:16.682233Z","title":"Online safe trajectory generation for quadrotors using fast marching method and bernstein basis polynomial,","venue":null,"work_id":"43c978fe-f773-4da3-bb37-0aa0fcf4fca0","year":2018},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.203286Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:5d93d17a76349eb53e2a4d87fc6c07c03daf2d3a4eb09a0a2cba9a2740056baa","observation_id":"3c798f68-5c38-4e37-9bb6-86576a36d1c1","resolution":{"observed_at":"2026-08-06T18:17:16.759144Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:15.807082Z","title":"FaSTrack: A modular framework for fast and guaranteed safe motion planning,","venue":null,"work_id":"ebe9ce9c-8387-4f09-9259-0e87153e4399","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.710141Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:1995c18fff1e4bec5a6d1b0c6edacfa808671bf165d9344e858de85f8ee65482","observation_id":"5fd8b44a-bd1d-4de5-b764-222adaf969e0","resolution":{"observed_at":"2026-08-06T18:17:15.890950Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:16.359817Z","title":"Integrated planning and control for quadrotor navigation in presence of suddenly appearing objects and disturbances,","venue":null,"work_id":"8b68b988-887c-44fe-af09-7633c030258b","year":2024},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.388534Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:bd1d410856aaefe0d70592ac0011e2145e482eb964aa26b7d7a2cfb2dbf80065","observation_id":"d35e1eb3-4a89-4049-863d-295c4aaebbb8","resolution":{"observed_at":"2026-08-06T18:17:16.407686Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:16.189576Z","title":"Path planning and predictive control of au- tonomous vehicles for obstacle avoidance,","venue":null,"work_id":"d7c30f4c-f755-4e9c-be1a-7610b4959e34","year":2022},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.459033Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:768589f282d82d79d39dd111658306d46d7765bf14f1feb9b483f49a542fa0b4","observation_id":"14021681-6aeb-42df-936d-4283ba813e7e","resolution":{"observed_at":"2026-08-06T18:17:16.251570Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:15.993569Z","title":"Supporting BIT*- based path planning with MPC-based motion planning of the self-driving car,","venue":null,"work_id":"0ff1d9e7-8e84-4cd4-add4-15170310ce4e","year":2022},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.604144Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:9dec9ad96ad4f435cffdb1ca607095064f190ab81cafcff473612c79e7d066c8","observation_id":"ef49dd6c-f186-4b3c-98a9-d7e8a19394b0","resolution":{"observed_at":"2026-08-06T18:17:16.085323Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:15.092915Z","title":"Randomized kinodynamic planning,","venue":null,"work_id":"b89ff7cd-b519-4ca4-8b2b-e93b6ede6b2a","year":2001},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.029688Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:e57aab63bc8c12efec06d0193cb49857d87646067c9c1d27695ae0dd65d22a62","observation_id":"be097c86-8633-4077-83c3-e9593937779a","resolution":{"observed_at":"2026-08-06T18:17:15.172517Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:07.786687Z","title":"FaSTrack: A modular framework for real-time motion planning and guaranteed safe tracking,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.786687Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:bc224e14d09251e8ba10f69c0e8bb0568d481fad21d52d88b3edee551f9d40e4","observation_id":"ea922e5f-ca2d-4b2d-b583-aef0bef51e7f","resolution":{"observed_at":"2026-08-06T18:17:07.786687Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:15.478302Z","title":"Safe returning FaSTrack with robust control Lyapunov-value functions,","venue":null,"work_id":"ce991703-beb8-4f7a-b0b2-596ba49c307c","year":2024},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.846927Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:e325b961d06a79063f9be122612672e7c20512c50156338d36639e42c469ae35","observation_id":"3aeb0757-6d12-4b66-bd02-287bebe14b7f","resolution":{"observed_at":"2026-08-06T18:17:15.636537Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:15.278274Z","title":"Randomized kinodynamic planning,","venue":null,"work_id":"47f885cd-e9b8-4e1e-90a5-cd369997ce75","year":1999},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:07.935832Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:380990dc48ed1fa2001b96825d42bd9c431a14ab954cd23524d7282ba0811fe0","observation_id":"694d56af-01ad-496e-8392-bc31707de01b","resolution":{"observed_at":"2026-08-06T18:17:15.370745Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:14.278208Z","title":"Motion planning with invariant set trees,","venue":null,"work_id":"a2fcb7d2-9727-4648-8ca7-b51c8ba150dd","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.388050Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:82417e27835cf5156114b1f37dcdcb1a54ff9503c08e9ec75cd00f40b94a3a04","observation_id":"69a28d9f-2f16-4a80-9aa1-4f6bfb6c87c7","resolution":{"observed_at":"2026-08-06T18:17:14.384730Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:14.949267Z","title":"LQR- trees: Feedback motion planning via sums-of-squares verification,","venue":null,"work_id":"882466a7-c8e1-4def-90f3-d7baba10eda3","year":2010},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.137391Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:2e0979d7204c1782f0d9d2f0fa0903ccf1e2a5b25e880182a547d66170026821","observation_id":"5e7adee0-5773-4a0d-b550-08502bddbf24","resolution":{"observed_at":"2026-08-06T18:17:15.017982Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:14.692237Z","title":"Safe positively invariant sets for spacecraft obstacle avoid- ance,","venue":null,"work_id":"8cdfcc94-5e65-4f20-ab8c-fb9d002c9326","year":2015},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.217434Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:51f2b68084d501b897ed877f555fd14fe878754c122ee6b04c41677c7cd4aec5","observation_id":"e428f894-9c30-4fe7-a577-301d3370f621","resolution":{"observed_at":"2026-08-06T18:17:14.798565Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:14.500047Z","title":"Path planning using positive invariant sets,","venue":null,"work_id":"8273809e-fbb3-4e10-b739-16a2aa3ad8c8","year":2016},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.288206Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:9e0d7c5fb65dbfc26e5844249624382569eed80b2d8f32a8cceac57f769aa0e3","observation_id":"85bb749b-0176-447a-a43c-defaae806049","resolution":{"observed_at":"2026-08-06T18:17:14.586706Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.588566Z","title":"The explicit reference governor: A general framework for the closed-form control of constrained nonlinear systems,","venue":null,"work_id":"f062444c-8ba5-4303-8836-b3eb1538574f","year":2018},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.706351Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:c67b64ee7a283cdbbf0f11d8e03aff3abd14f98a0c5ccb1adbc159a3f44b284d","observation_id":"b1c87b52-462a-4de5-b23f-a9228f4074f7","resolution":{"observed_at":"2026-08-06T18:17:13.675335Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:14.101608Z","title":"Automated driving: Safe motion planning using positively invariant sets,","venue":null,"work_id":"c0cd027b-8808-4a4e-a3b7-a9e0dc657757","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.458287Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:aed46b7f1e713d1dbdba8742e2a3f1814f3cc2aa251da06d389fa8d52fc42cf4","observation_id":"7b1d1f71-2718-40c0-8058-8760fb39de92","resolution":{"observed_at":"2026-08-06T18:17:14.181400Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.960076Z","title":"Robust motion planning for uncertain systems with disturbances using the invariant- set motion planner,","venue":null,"work_id":"642e4470-1b70-4f9b-a1e0-d25e155eb3ed","year":2020},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.538032Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:9af9e1f8d4719051453dbeeb4422f64d1375624f8d152f163e43b30f87c31a07","observation_id":"b46290a6-b7be-4819-8367-6c6814ebdac0","resolution":{"observed_at":"2026-08-06T18:17:14.012025Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.777803Z","title":"Dynamically feasible path planning in cluttered environments via reachable Bezier polytopes,","venue":null,"work_id":"17c4ae74-147c-4acf-8b09-197f547ce70a","year":2024},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.636890Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:8ae247f599714035726afc09b300f626fe7fd435628c7b5904dbeec80e1fe5f5","observation_id":"c3ef726f-1ec2-4e0f-994f-8e777c4ea372","resolution":{"observed_at":"2026-08-06T18:17:13.870349Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:09.102586Z","title":"Model predictive control: Recent developments and future promise,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.102586Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:b1f4b7a901cb0a93d4f280c9f80b58bb3070dbdbbd09bd8f808a38d05cee9b6e","observation_id":"0c446aca-3c40-4e22-b461-484fea30ca1d","resolution":{"observed_at":"2026-08-06T18:17:09.102586Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.433405Z","title":"Invari- ant set distributed explicit reference governors for provably safe on-board control of nano-quadrotor swarms,","venue":null,"work_id":"dbb2a70f-fcef-48a5-935f-b4bae3cc3e87","year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.801109Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:59d4bba611c67e6368fcbc56095b1d24f1005e7291c0095ec6be50e120dfd210","observation_id":"4b061b7c-bfb5-46c0-9412-c563a04df19a","resolution":{"observed_at":"2026-08-06T18:17:13.515485Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.278074Z","title":"Governor-parameterized barrier function for safe output tracking with locally sensed constraints,","venue":null,"work_id":"875521de-eda8-4c2d-9131-1497356bddbc","year":2023},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.886387Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:cb11c0d60d56cff97c3c7a7667db9c698b95f542abd9e7068edd7f70783259f2","observation_id":"67e0760c-d182-4ac8-b8cd-12164430a382","resolution":{"observed_at":"2026-08-06T18:17:13.353631Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:20.429552Z","title":"≡” is used for definitions, e.g., “a≡b","venue":null,"work_id":"10013088-e22a-42a9-96f1-f6ec68415357","year":null},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:05.180427Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:52a81480201573be4b6789532d6b4d252057c7d9484c0f1bc8f6548deb0b7ed8","observation_id":"18f4a5b6-6e85-4414-bd2d-c26ecd322e44","resolution":{"observed_at":"2026-08-06T18:17:20.507826Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.172847Z","title":null,"venue":null,"work_id":"c3ef4974-64f2-4fd9-a78b-c94bd307a766","year":2018},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:08.991623Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:5097a8cabac7b5e85e8db47e38dc1cc5cb69f4be557bc68042943e32ce97f1da","observation_id":"2eed0c2c-298c-45f1-b231-7fc3aca7dfcf","resolution":{"observed_at":"2026-08-06T18:17:13.220840Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:13.059954Z","title":"Feasibility governor for linear model predictive control,","venue":null,"work_id":"c31f6f90-3538-4cfd-813b-04077ae5f689","year":2021},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.171690Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:9c77136ef45f3198329a3eead22f84e5aabd976c3b0976f5fbaa91b42a3f5be6","observation_id":"6903f0f3-1c4f-42bf-bf95-98bf570aace4","resolution":{"observed_at":"2026-08-06T18:17:13.100664Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.946170Z","title":"A feasibility governor for enlarging the region of attraction of linear model predictive controllers,","venue":null,"work_id":"8e8afed0-7b1e-4def-8af2-e54760b625eb","year":2022},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.240699Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:4a78d25d364da0a2602b77371de8bf35c000761a6a55dfa5c93d16fea84cfe9c","observation_id":"addc0831-1b33-4a9b-8ad5-406765743fed","resolution":{"observed_at":"2026-08-06T18:17:12.996076Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.801962Z","title":"A terminal set fea- sibility governor for linear model predictive control,","venue":null,"work_id":"2182931c-18eb-4a1b-a385-0c11f7f35169","year":2023},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.312892Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:3f7bf39bb4adba20ba2a1eda17951e3bd804b5456a9bfcba76228effee64fcd1","observation_id":"60d15a3b-00df-45ea-92f9-b44ef977a761","resolution":{"observed_at":"2026-08-06T18:17:12.862543Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.680434Z","title":"Model predictive control for tracking using artificial references: Fundamentals, recent results and practical implementation,","venue":null,"work_id":"cae73a57-1a05-4f3a-b9ae-d1897112ea58","year":2024},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.407759Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:5f066813005dd5edd00b8a091bc31c7e68c62babaf27226f052c7b08dc333f27","observation_id":"d44c68b6-9078-48d3-892b-acd0bc998348","resolution":{"observed_at":"2026-08-06T18:17:12.751378Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.539401Z","title":"Kouvaritakis and M","venue":null,"work_id":"fc5e37e0-e98c-4562-9909-889f4371f8db","year":2016},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.474980Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:5f69ecddb70c323e8c2ee6175b39f62dbdac4d82430361290dfb240cb4e402dd","observation_id":"fe1b5cb3-ca8a-4d57-99eb-ebd3c686ba4e","resolution":{"observed_at":"2026-08-06T18:17:12.615866Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.358079Z","title":"Time- distributed optimization for real-time model predictive control: Stability, robustness, and constraint satisfaction,","venue":null,"work_id":"8574e5cd-ee05-4a48-b1e8-86f208cb1d95","year":2020},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.625356Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:10c65198bd632249a8bbfd017703e513c9d78b973e316f7274bf60ecd42e27b5","observation_id":"a9202777-4cb3-4a14-84dd-f39f319ca02a","resolution":{"observed_at":"2026-08-06T18:17:12.426498Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.210033Z","title":"MPC for tracking piecewise constant references for constrained linear systems,","venue":null,"work_id":"86464f06-3ec1-4035-900b-1ffdd16615c4","year":2008},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:09.820423Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:2e8e8b8a06166c2890d686374987035e17627435156163d3a73089ec80a44b15","observation_id":"fb46f64b-060a-4c3b-a124-ba502448879d","resolution":{"observed_at":"2026-08-06T18:17:12.263271Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:10.153448Z","title":"Sampling-based algorithms for optimal motion planning,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:10.153448Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:ac9b75f598ec520dfd151051fa7c719a45cf5db949ebcfa0ae1c299a39dc5846","observation_id":"24da2996-8374-40b5-8f32-bb72ae5eac54","resolution":{"observed_at":"2026-08-06T18:17:10.153448Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:12.046355Z","title":"Real-time obstacle avoidance for manipulators and mobile robots,","venue":null,"work_id":"506e411c-4db3-48b8-adde-5d359fac8106","year":1985},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:10.242511Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:7067c570655af7709fb6dfec9ea54533d061eadaf84d599f9b5ac83737fb1acb","observation_id":"8ee0a370-5ecd-418e-9a41-013933ad691a","resolution":{"observed_at":"2026-08-06T18:17:12.113086Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:10.442692Z","title":"Constrained model predictive control: Stability and optimality,","venue":null,"work_id":null,"year":2000},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:10.442692Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:aaabb02d6e5aca608ca94571daf6b2c41d793d7c5920c9729cd99e4e73d63c97","observation_id":"8ba3bb5c-90bb-4d59-b522-1873c76ecbdf","resolution":{"observed_at":"2026-08-06T18:17:10.442692Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:11.853580Z","title":"Limon, T","venue":null,"work_id":"dccf83ea-59a9-40e9-a489-1c2042329c8e","year":2009},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:11.135506Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:7f4e58303ae656897284da97226e0bb95b568e81233bae8ae65f995cc276da4c","observation_id":"62892f55-488c-4d5b-bd65-4bc2692029ba","resolution":{"observed_at":"2026-08-06T18:17:11.932592Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:11.647725Z","title":"Input-to-state stability for discrete-time non- linear systems,","venue":null,"work_id":"2a077d2b-a789-4cf0-961f-910da921281c","year":2001},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:11.215473Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:6f19654629c88eebfe87c5226a41e322ba2353fa5a7771f5df435f6c9d2282a5","observation_id":"e6fdcc43-a938-488f-9aa7-3160042f1e31","resolution":{"observed_at":"2026-08-06T18:17:11.728240Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:11.281068Z","title":"The explicit linear quadratic regulator for constrained systems,","venue":null,"work_id":null,"year":2002},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:11.281068Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:43285189ceb44efd6758736287757058bab88e9a0909e18ed2326a7d3c662980","observation_id":"948d8ba2-fdb6-4f5d-a9aa-92dafa8afc38","resolution":{"observed_at":"2026-08-06T18:17:11.281068Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T18:17:11.482059Z","title":null,"venue":null,"work_id":"2f7d0fb2-43a2-45dc-9ab0-dde3e515bd16","year":2017},"citing_paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-06T18:17:11.378554Z"},"links":{"citing_paper":"/paper/2507.09134"},"observation_digest":"sha256:31deb05737aa75e926d06821aa7a947d8ac695c8580dc7466bba9ce47a7ed3c1","observation_id":"cc3eef92-6921-4402-a5c4-4c999c1e0b4b","resolution":{"observed_at":"2026-08-06T18:17:11.553165Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.09134","last_updated":"2025-07-12T04:24:47Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T06:07:28.306011Z","submitted_at":"2025-07-12T04:24:47Z","title":"Integrating Planning and Predictive Control Using the Path Feasibility Governor"},"reference_resolution":{"displayed":57,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":8,"verified_exact":0,"verified_fuzzy":49},"total_outbound_references":57},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"thesis":"As of 9 August 2026, this Paper Citation Record lists 57 of 57 outbound references and 1 inbound Pith citation observation for arXiv:2507.09134."}