{"as_of":"2026-08-15T08:05:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:a4e5f65fe828b1193ac84f84e30d8a7da276ee35c071e64f679f88459d86a311","coverage":[{"denominator":44,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":44,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T16:28:02.299105Z","state":"measured"},{"denominator":44,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":44,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-15T06:32:42.880941+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.13611/citation-record","integrity":"/paper/2507.13611/integrity","json":"/paper/2507.13611/citation-record.json","paper":"/paper/2507.13611"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.806009Z","title":"Enhancing power system operational resilience against wildfires","venue":null,"work_id":"63114d75-fe1a-46b9-a69e-ef385d15e592","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.129519Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:54f18c27d21b387eedd0fc4b6f653618c9e314bfcd13823519c99572a29afe84","observation_id":"7807be7b-4eaa-4b32-84cd-cc12d5402b3f","resolution":{"observed_at":"2026-08-06T16:28:02.810118Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.794653Z","title":"Impact of wildfires on power systems","venue":null,"work_id":"b96a4964-bea9-4abd-abd9-636cf28fa259","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.134054Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:c43a0422cb5c892cf23bc9c0b015522069265b67be2f22c2c254f025caefd673","observation_id":"bfff57c3-0baa-497d-b822-269ed0b3a831","resolution":{"observed_at":"2026-08-06T16:28:02.798380Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.783665Z","title":"Resilient expansion planning of electricity grid under prolonged wildfire risk","venue":null,"work_id":"16f39278-ada8-42e7-ad32-58a3cf7dcd7b","year":2023},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.138486Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:d2fd2d769fa8d894b82d33dc57cc6712acc09d872feb7cddefbb1ad4946d1f18","observation_id":"47db62f7-fdf8-4b1b-8568-c0be38168fcf","resolution":{"observed_at":"2026-08-06T16:28:02.787085Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.773710Z","title":"The value function of a mixed integer program: I","venue":null,"work_id":"22501fc8-b5f2-4a28-bee5-8ea1edc07ef7","year":1977},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.142472Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:abbd61595b6ce3ad210688a3a2d0c4e4365f519b74fc8d51bc19725fdc5b427f","observation_id":"fff33216-f55d-4266-9ac9-3c3c27085d0f","resolution":{"observed_at":"2026-08-06T16:28:02.777050Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.763683Z","title":"Historic fire perimeters","venue":null,"work_id":"075b21b6-d38c-4da2-8d1f-57f1bc0e8ca6","year":2024},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.147697Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:a777ee82b23f2a59f8ded91ad8b6df30dfe8bb3b5b0c5753ec1d7fc756aa9fa8","observation_id":"a9e308cc-92db-4968-a616-7845d883609a","resolution":{"observed_at":"2026-08-06T16:28:02.767323Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.753314Z","title":"On generating lagrangian cuts for two-stage stochastic integer programs","venue":null,"work_id":"5259a452-6995-4af2-902e-6d68c390ffc6","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.151878Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:476ad6cec233ee6bb4431be3d3dcc7bd1efe33844a47340258b6cea26982392f","observation_id":"31fd5f34-727c-4bc7-b3f7-a2755b1c085b","resolution":{"observed_at":"2026-08-06T16:28:02.757014Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.742780Z","title":"Power grid vulnerability assessment against wildfires using probabilistic progression estimation model","venue":null,"work_id":"17e3c63b-c5aa-4a4c-a0a7-aa65a3e514fd","year":2016},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.156864Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:50194be0150e57394c6841b6c5872bdc1d8d322366e652db8af71b6557a7972a","observation_id":"1a07dd78-ecf7-42f6-b1ab-106f669fd157","resolution":{"observed_at":"2026-08-06T16:28:02.746756Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.731547Z","title":"Integrating wildfires propagation prediction into early warning of electrical transmission line outages","venue":null,"work_id":"977f7c88-79f1-43bc-83c8-9579ca157963","year":2019},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.160637Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:2c63e01bb0c78f79f5574e050ae3c2ccde54758ce4867639625606eef8a0d141","observation_id":"1981ee94-de94-4eeb-9768-20494f584e74","resolution":{"observed_at":"2026-08-06T16:28:02.735571Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.721590Z","title":"Dynamic line-switching in transmission system operation amidst wildfire-prone weather under decision-dependent uncertainty, 2025","venue":null,"work_id":"c11f3a60-b838-4488-9bf5-c4f37da14702","year":2025},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.164469Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:1ae60f984e9bf29cccff13fe698809de837dc19da75e1e9f648668b7d7240bee","observation_id":"ddbaaa7b-1412-4d3e-bd6e-e35c5570e4d9","resolution":{"observed_at":"2026-08-06T16:28:02.725147Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.710574Z","title":"Form 1 - electric utility annual report","venue":null,"work_id":"738f324f-39bd-4e0d-8d80-95dda0a02609","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.168971Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:d3179d76a31d9f890300b1e03476d7022e7ebd2b38388bcdea51e29460274264","observation_id":"f7bb3f57-dd76-40a2-b707-5a9529c1d0b4","resolution":{"observed_at":"2026-08-06T16:28:02.714702Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.698088Z","title":"Optimal transmission switching","venue":null,"work_id":"0356651c-1b78-4fb5-a0c4-388db5f8e9f8","year":2008},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.172850Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:c1ff158ee6a560c006eef51182629644126acf776ba98c7658f6208cc88c5c5c","observation_id":"18c9201c-a3f5-4522-9a4a-dd1359b20703","resolution":{"observed_at":"2026-08-06T16:28:02.702897Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.687490Z","title":"Solution strategies for multistage stochastic programming with endogenous uncertainties","venue":null,"work_id":"a8f89b32-e50f-4335-be3d-94a9be554fbe","year":2011},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.176901Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:49add5100562b4319e926ce99b5b0644d9d8d6fb0fc1c75cfd28d3e5a236159f","observation_id":"b8f94613-129d-43d5-8c2d-8d5bc5371d6b","resolution":{"observed_at":"2026-08-06T16:28:02.691133Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.676055Z","title":"Changing wildfire, changing forests: the effects of climate change on fire regimes and vegetation in the pacific northwest, usa","venue":null,"work_id":"27c466e2-2ae8-40ab-8e76-fc4fb8d365fa","year":2020},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.180884Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:3ae1cafb37cce417c3bface69ae7d1de0b70c410b01ccead7379abde854a9155","observation_id":"b56a8006-111d-43df-8c1f-a101481f6903","resolution":{"observed_at":"2026-08-06T16:28:02.680037Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.664947Z","title":"Co-optimization of generation unit commitment and transmission switching with n-1 reliability","venue":null,"work_id":"348d5702-f1b7-4c78-aa0f-a7c47a87d6eb","year":2010},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.184495Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:74f08ac0d6644a099a5fb72dd5a8f7b401774692dcb1d7b7615389aa5a0d3238","observation_id":"a308ed0a-d850-4375-9b51-13f47da8c7b0","resolution":{"observed_at":"2026-08-06T16:28:02.668657Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.654767Z","title":"Scenario tree modeling for multistage stochastic programs","venue":null,"work_id":"3d78a134-3b80-4e7e-8d2d-d4efe3c6927e","year":2009},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.188451Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:6e66d348bc106c8e47477b0eac65446af9b0fd75b992c46bedc67b3c74401fc7","observation_id":"c48cde3b-dd82-4d22-b04f-de0f8b26dccd","resolution":{"observed_at":"2026-08-06T16:28:02.658358Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.643933Z","title":"Computationally efficient formulations for fault isolation and service restoration in distribution systems","venue":null,"work_id":"fbeeb730-ce64-48a8-b4ff-63024eefff33","year":2020},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.192158Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:bd88251688d08111e97607e72c4f678544adea5115d6820ab75723ebe5b101c1","observation_id":"e8f863cc-24e9-4127-9423-c84689a3f061","resolution":{"observed_at":"2026-08-06T16:28:02.647868Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.633439Z","title":"Electrical power unit commitment: deterministic and two-stage stochastic programming models and algorithms","venue":null,"work_id":"8677e6be-851d-4a83-899b-87fe543dc57f","year":2017},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.196172Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:6a19dae73cdb1542aaf2854ac098b1074f546e278459bdf243f984bd931f805b","observation_id":"dea391ca-0a96-4c91-a271-ee21d88063bf","resolution":{"observed_at":"2026-08-06T16:28:02.637053Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.622294Z","title":"Network hardening and optimal placement of microgrids to improve transmission system resilience: A two-stage linear program","venue":null,"work_id":"dfb88ea5-faec-4815-b130-ed50ccfd7e42","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.199769Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:0fcbc01c64a0a0c0bebbe398ef3615471baa52a1fcd764b1b7f7e357b7c9de87","observation_id":"560ebd31-a79b-4681-bb22-7139aed62ce9","resolution":{"observed_at":"2026-08-06T16:28:02.625966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.611108Z","title":"Wildfire danger prediction and understanding with deep learning","venue":null,"work_id":"a103fe21-4fee-4618-86d9-49a64dccb65e","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.203952Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:32c9ecd8da5bab98fda0277c390094f973aa23c2e61e64f5823aff6fe09d7051","observation_id":"f606a39a-a249-4b20-8f1f-92f0c9b87723","resolution":{"observed_at":"2026-08-06T16:28:02.615441Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.600735Z","title":"The integer L -shaped method for stochastic integer programs with complete recourse","venue":null,"work_id":"aa390fc0-4676-485f-97fd-3b525b5b4858","year":1993},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.207980Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:113279626210a696a145fae7061d7fda5754d01ef0e1ac1fb652bdcf5173e4e4","observation_id":"59db8907-8227-4475-8bfa-352b83f0f2f0","resolution":{"observed_at":"2026-08-06T16:28:02.604416Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.590207Z","title":"A review of stochastic programming methods for optimization of process systems under uncertainty","venue":null,"work_id":"a9091538-1c8b-45e5-a4cf-026082b828e0","year":2021},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.211878Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:a854b1dc6759b21c5c881ca32702e9a2749264dcf260314f4c7d98d53c4fcead","observation_id":"22b3a05e-d47f-4647-8a37-55c12a8e0bd8","resolution":{"observed_at":"2026-08-06T16:28:02.594107Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.579417Z","title":"Optimal resilient power grid operation during the course of a progressing wildfire","venue":null,"work_id":"23a520f1-a871-4838-958b-12bfe1c6de2b","year":2015},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.215430Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:e7437368c8c2d4805bf308ce5d11849caec76f03e6c1413654cc99ce33fbeee1","observation_id":"936306de-c006-412c-bc96-44badae161b9","resolution":{"observed_at":"2026-08-06T16:28:02.583962Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.569051Z","title":"Stochastic optimal transmission switching: A novel approach to enhance power grid security margins through vulnerability mitigation under renewables uncertainties","venue":null,"work_id":"16066d35-2029-43d2-a5e2-c77444630014","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.219100Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:9c150587bf22a5b8795a5dd44269c72a6b9215e091091d22c59ee776065a1424","observation_id":"9c63343d-2237-48d1-8350-0debbf0fd968","resolution":{"observed_at":"2026-08-06T16:28:02.572435Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.558960Z","title":"Distribution system operation amidst wildfire-prone climate conditions under decision-dependent line availability uncertainty","venue":null,"work_id":"c1b9bf7e-3f57-4940-b2f2-d469c63c8a29","year":2024},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.222554Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:aa4f845847e3ce6520ed0a2ed65e0b7174383b4de81ae0d84ebf3fe588aaa38c","observation_id":"d42f447d-0f52-4798-935b-d9405d053b88","resolution":{"observed_at":"2026-08-06T16:28:02.562258Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.549201Z","title":"Characterizing probability of wildfire ignition caused by power distribution lines","venue":null,"work_id":"ee056815-e225-4333-be04-699f26300706","year":2020},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.226022Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:f26eb22a0edcd583068568de77e3aeabf16888fb4aa3f4a4396682eddf716361","observation_id":"928d167e-6672-48ba-8d31-3e228d28987d","resolution":{"observed_at":"2026-08-06T16:28:02.552552Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.538882Z","title":"Optimal resilient transmission grid design","venue":null,"work_id":"de0f5a9c-894f-421f-8861-b25167868aeb","year":2016},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.229515Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:714fd5b2fa0628536e7c79a93d848c0faa927275829ed77ef216de7783298821","observation_id":"64abe8b4-0fda-46e0-a493-ea9f344aaf96","resolution":{"observed_at":"2026-08-06T16:28:02.542350Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.528542Z","title":"Preparatory operation of automated distribution systems for resilience enhancement of critical loads","venue":null,"work_id":"a097db10-5942-462b-898f-eab04d12310c","year":2020},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.233186Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:b8c7977d6ad1deffc0f8efcd923f076382c21a40ac8814a0e4924c84fa154c39","observation_id":"e52ca819-95e1-4a34-a4d8-51653a1b138d","resolution":{"observed_at":"2026-08-06T16:28:02.532079Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.519512Z","title":"A time series model for building scenarios trees applied to stochastic optimisation","venue":null,"work_id":"93b2b26f-29fe-4ef7-93d4-a7ed97d2d918","year":2015},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":28,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.236652Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:1fe3eb1668ca13955c71fd8f4ef68070e91324b19250e6ea986a86cdcb5722f4","observation_id":"2299080d-7a9e-4ce7-ac83-d33006dc15cb","resolution":{"observed_at":"2026-08-06T16:28:02.522687Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.508853Z","title":"On the value of binary expansions for general mixed-integer linear programs","venue":null,"work_id":"531cf903-4957-49b5-a34e-0aacfaab1e85","year":2002},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":29,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.240413Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:9cb01e9206f5a41925843704ec14427ddd3f9c3ff73f5e9b3a031ba91f03d2ec","observation_id":"78f59e32-2948-4485-b495-0b6fe4018150","resolution":{"observed_at":"2026-08-06T16:28:02.512593Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.497309Z","title":"Multi-stage stochastic optimization applied to energy planning","venue":null,"work_id":"ef70afe4-03b3-44b9-b7c7-9abdd75a5cd6","year":1991},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":30,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.244153Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:e6ecaaefa2d19c9dcf1fac5d0253b6b9a998eb1a662169e304d847bf5ec20e34","observation_id":"28f49384-da5f-4f0c-b9c9-9dff1f474782","resolution":{"observed_at":"2026-08-06T16:28:02.501814Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2405.04350","last_updated":"2024-05-08T19:19:50Z","snapshot_observed_at":"2026-08-13T00:13:04.441335Z","submitted_at":"2024-05-07T14:28:04Z","title":"Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk","version":2},"cited_work":{"arxiv_id":"2405.04350","doi":null,"metadata_source":"pith","pith_arxiv_id":"2405.04350","snapshot_observed_at":"2026-08-06T16:28:02.330904Z","title":"Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk","venue":"math.OC","work_id":"d1b60cd7-6c87-4ec3-b06a-d49022cbf31f","year":2024},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":31,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.247793Z"},"links":{"cited_paper":"/paper/2405.04350","citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:4afd0362c6395f0675931c9c81cc83d1442c98a71115e1563e00a6210813a8d9","observation_id":"7bee4599-c819-4635-accd-04448148aac7","resolution":{"observed_at":"2026-08-06T16:28:02.337158Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.484661Z","title":"Study on the breakdown characteristics of the transmission line gap under forest fire conditions","venue":null,"work_id":"aac6bbb1-66cb-4ef6-b837-04c6ec2e5269","year":2015},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":32,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.251884Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:4af777abb416d77bc1ebf2fcf04972fe896f0f5d11b8e494ce0bfc7524aba721","observation_id":"42ccea30-44df-413c-91da-259d3939141f","resolution":{"observed_at":"2026-08-06T16:28:02.489168Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.473767Z","title":"Energy management system for smart grid: An overview and key issues","venue":null,"work_id":"5f954662-499c-4d07-97a4-1ac3a26f576e","year":2020},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":33,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.255740Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:44d596e0690ecd1bbd1f95478a9efd50c1754695da59f55af141767e2a89a0c4","observation_id":"6897a305-1977-4b34-bbe4-f3c823c13760","resolution":{"observed_at":"2026-08-06T16:28:02.477428Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.463317Z","title":"Nurse staffing under absenteeism: A distributionally robust optimization approach","venue":null,"work_id":"9d21cf4a-c4b6-4adb-b8f7-684ce05fed49","year":2025},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":34,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.259320Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:a38700b97647e307b6d182d95899a436fdce5ecab976bcf3fbf2f07e5c983fce","observation_id":"e13d3c6c-bd1e-4124-b5d4-153eb3f4c1df","resolution":{"observed_at":"2026-08-06T16:28:02.466943Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.452313Z","title":"Evaluating the resilience of electrical power line outages caused by wildfires","venue":null,"work_id":"c7374fba-bb29-4366-bc39-347d8af3be58","year":2023},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":35,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.263737Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:c32ba2ebcc1e9194a22e27e854721909c05dbe1f2d8a7f6137718a98f869cfa6","observation_id":"a9ff13c4-76fb-4462-a8fc-8b8e266a7ce2","resolution":{"observed_at":"2026-08-06T16:28:02.456284Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.440465Z","title":"California test system (cats): A geographically accurate test system based on the california grid","venue":null,"work_id":"e7281f24-01fd-42ce-9e9a-bd8b5e1f9d80","year":2023},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":36,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.267578Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:ce1f67f1f62bd8ce8539a8e51484d915359a1e15f4ca74778a02cc6c79a6eb56","observation_id":"a1d6bb3b-76c5-4a82-885b-2d3c4862c427","resolution":{"observed_at":"2026-08-06T16:28:02.444270Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.429966Z","title":"Managing wildfire risks: Protection system technical developments combined with operational advances to improve public safety","venue":null,"work_id":"ec81e7cf-fe89-43cb-9625-f9c7ee52c3dc","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":37,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.272556Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:89a2cd4e51164d235041891961c72feb5dba76ce794ef81b066c025bfd3a3f0c","observation_id":"f1e5ece9-0173-4d2f-90cd-c42dd90e50e8","resolution":{"observed_at":"2026-08-06T16:28:02.433660Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.417854Z","title":"A coordinated reconfiguration strategy for multi-stage resilience enhancement in integrated power distribution and heating networks","venue":null,"work_id":"608fb5a8-5de3-4f3e-ad65-fe7390116916","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":38,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.276292Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:56fcb0be356bf3df48eeb57a38e652e21db5461a838a7449ae2e3b8b6c1371b3","observation_id":"53f2c17b-5122-4586-abe5-252cb1c8f53d","resolution":{"observed_at":"2026-08-06T16:28:02.422127Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.406325Z","title":"Multi-period power system risk minimization under wildfire disruptions","venue":null,"work_id":"f38a49bc-6133-4542-bd23-f5648be150f8","year":2024},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":39,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.279960Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:f4b9d5599deeb707be4c9d4505e2f8cd0d6624bfb6b1178b555b4ea4285caae4","observation_id":"601900a2-8dcc-4253-8c17-28a74a64614c","resolution":{"observed_at":"2026-08-06T16:28:02.409983Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.394166Z","title":"Multistage stochastic program for mitigating power system risks under wildfire disruptions","venue":null,"work_id":"66433e94-3f97-4b4a-bd0a-bc924c1ca9a3","year":2024},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":40,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.283387Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:ea8d67c3b8fb01b680f935f4312198e8700254560f4eb9635c5a6f9a1bd7aa4e","observation_id":"e36c3139-c4f7-45c9-be91-eeea5e538050","resolution":{"observed_at":"2026-08-06T16:28:02.398178Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.381752Z","title":"Multistage distributionally robust mixed-integer programming with decision-dependent moment-based ambiguity sets","venue":null,"work_id":"4e3b63be-b14d-433d-a40d-664887c3f1b2","year":2022},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":41,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.287032Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:c607eb678f5a814d25f0eee3924a15be33b4e6e19da2a4654a70115a9cd4e147","observation_id":"0b5ed0ee-a161-4a3f-ad12-78f7efc9b77d","resolution":{"observed_at":"2026-08-06T16:28:02.385851Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.369722Z","title":"Two-stage distributionally robust optimal power flow with flexible loads","venue":null,"work_id":"1bfba8ab-8548-4dc3-b7b0-950352f797f6","year":2017},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":42,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.291147Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:8dc11aad6ccd24bf0b1a0fdc72f6f9862b9a8a3867a8a5afce41226025142a5a","observation_id":"4c0595ce-ae08-4460-bd33-7cd82c8daefe","resolution":{"observed_at":"2026-08-06T16:28:02.373993Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.356697Z","title":"Multistage stochastic unit commitment using stochastic dual dynamic integer programming","venue":null,"work_id":"ce7a9d70-05ea-40b9-8030-f68d4eb383e1","year":2018},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":43,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.295396Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:a3db05d26faeb4e25582a5223fa36adc0560b4efbdc9c2c5aa84ca8642f363ea","observation_id":"0ab50cf2-064f-49ae-ac01-e65e88ac8ad7","resolution":{"observed_at":"2026-08-06T16:28:02.360669Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T16:28:02.345091Z","title":"Stochastic dual dynamic integer programming","venue":null,"work_id":"be866373-79cd-4ced-843e-da631f9fad8f","year":2019},"citing_paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty","version":1},"reference_index":44,"source":"arxiv_source","source_observed_at":"2026-08-06T16:28:02.299105Z"},"links":{"citing_paper":"/paper/2507.13611"},"observation_digest":"sha256:6af60db62143d86d24437b5b2ae3f098a8eca55926239fe63bb930edd8ddae72","observation_id":"bef872c4-81eb-4bd4-b638-4e3b3732486e","resolution":{"observed_at":"2026-08-06T16:28:02.348696Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.13611","last_updated":"2025-07-18T02:41:17Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-13T09:00:03.924744Z","submitted_at":"2025-07-18T02:41:17Z","title":"Dynamic Transmission Line Switching Amidst Wildfire-Prone Weather Under Decision-Dependent Uncertainty"},"reference_resolution":{"displayed":44,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":1,"verified_fuzzy":43},"total_outbound_references":44},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"thesis":"As of 15 August 2026, this Paper Citation Record lists 44 of 44 outbound references and 0 inbound Pith citation observations for arXiv:2507.13611."}