{"as_of":"2026-08-11T06:32:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:45ab86a8814002f2bbc29306244c2a5320f3b196d1650342eceb4873ad10eeac","coverage":[{"denominator":43,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":43,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T14:01:22.238573Z","state":"measured"},{"denominator":44,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":44,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-03T14:51:36.969038Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2507.20029","snapshot_observed_at":"2026-08-03T14:51:36.969038Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.19446","last_updated":"2026-06-18T16:30:10Z","snapshot_observed_at":"2026-08-08T15:05:25.805717Z","submitted_at":"2025-12-22T14:45:29Z","title":"An alternative approach to well-posedness of McKean-Vlasov equations arising in Consensus-Based Optimization","version":4},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-03T14:51:36.969038Z"},"links":{"cited_paper":"/paper/2507.20029","citing_paper":"/paper/2512.19446"},"observation_digest":"sha256:9519032724bc02f0d46bdbfd0e145273085e7cbbe819873ad0175e695fc81124","observation_id":"51054cb1-c5ae-4002-bf99-283dbe1e6e3f","resolution":{"observed_at":"2026-08-03T14:51:36.969038Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2507.20029/citation-record","integrity":"/paper/2507.20029/integrity","json":"/paper/2507.20029/citation-record.json","paper":"/paper/2507.20029"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.667233Z","title":"Aarts and J","venue":null,"work_id":"f9598c4d-391c-4b05-b0ff-0c02422c9d96","year":1989},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:21.877247Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:690f4dc3a0ae94fd55cea3f2c304f1696b7b18f14a268c5fe39b5973b570eb49","observation_id":"0b1f1b29-2632-4a5c-9ea6-477ca6662722","resolution":{"observed_at":"2026-08-06T14:01:22.669521Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.659751Z","title":"Ambrosio, M","venue":null,"work_id":"527f5974-7ef6-4123-b752-985be099f3f5","year":2021},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:21.967188Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:aeb7c73b537e0e896079ac8907797ab661ed84a0d6081c10b096f37c4fbb119b","observation_id":"86dcda8b-f64e-4590-9cec-04e5179e502e","resolution":{"observed_at":"2026-08-06T14:01:22.662227Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.652452Z","title":null,"venue":null,"work_id":"7b2ccab9-dd2b-4f78-8649-3aa0a93ad650","year":1997},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.094431Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:840c904bbd8e66e6c927af5f47834154f9ec7c6e443af6f0a66af34fece6424a","observation_id":"9f0bb42f-1244-44d2-92b2-dba47ab8cbea","resolution":{"observed_at":"2026-08-06T14:01:22.654715Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.645178Z","title":"Baldi, Stochastic calculus","venue":null,"work_id":"743375f4-39b4-4890-b711-9b3677a54d2a","year":2017},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.141828Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:2f43e57907a79b964462979b0a0e2d8c5ca8dd9e55bb7f84f96b8991796c6f6b","observation_id":"61343b4d-988a-404b-b269-890fde4d50c6","resolution":{"observed_at":"2026-08-06T14:01:22.647591Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.144738Z","title":"Baldi and M","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.144738Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:c3fdeb5ea2a2818a1d5e729d41bb4f0319ffdf0db517a44a6bf9b9286fc11b84","observation_id":"860d92d4-ffb3-4ca4-b595-40674d810014","resolution":{"observed_at":"2026-08-06T14:01:22.144738Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.637614Z","title":"Benamou, G","venue":null,"work_id":"13089330-6d22-48aa-88f9-940fff695e1c","year":2015},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.147269Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:b5a9850bc797b8486dfce77d754ddb0b0980ffe64cf1a4fc89393c689de00cfb","observation_id":"8f6c4e73-eac7-4891-b457-6e1e9df6c31b","resolution":{"observed_at":"2026-08-06T14:01:22.639827Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.630003Z","title":"Billingsley, Convergence of probability measures, Wiley Series in Probability and Statistics, 2nd Edition, 1999","venue":null,"work_id":"52ec16b3-55f7-4242-99a3-3e5246e10f89","year":1999},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.149935Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:07e9a9825cc95b1c3fe38dce01a2f457d2920c6a90a17a9fe502a33884a9a304","observation_id":"e2184e6b-7522-4861-9e9a-2924ad376397","resolution":{"observed_at":"2026-08-06T14:01:22.632502Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.622987Z","title":"Borghi, M","venue":null,"work_id":"4f2f7158-dc33-46ae-bbf7-f7e1cbc0e953","year":2023},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.153084Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:fe7700965ae186bd2dc07c7356658693907e6c563e7e1c06b7cb93cda0a07211","observation_id":"b9efa56a-30fd-4517-8ca1-590ce3c55897","resolution":{"observed_at":"2026-08-06T14:01:22.625404Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.615466Z","title":"Borghi, M","venue":null,"work_id":"cb1ef1f9-0839-44d4-ae7f-d2e3f589b530","year":2023},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.155461Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:cf739d2d1724d398d54002bd0118d565de75cf7f6e030bd202cf17b34f1cefc7","observation_id":"d5e2c7c2-e5a5-424f-9843-ea8211bf4dc1","resolution":{"observed_at":"2026-08-06T14:01:22.617793Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.607736Z","title":null,"venue":null,"work_id":"9bf9d270-86d7-402c-a828-269256ffaa90","year":1973},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.157786Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:b2327f339e69dce61be1e8c201382ac54756e6d58549ceea0d040a9116c8b017","observation_id":"9e04ab06-9af9-462c-b95a-2a33f2a8b6e9","resolution":{"observed_at":"2026-08-06T14:01:22.610706Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.600548Z","title":null,"venue":null,"work_id":"fab82fef-3418-435f-a57a-cbd8463ad06b","year":2011},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.160251Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:d2a2edc456df5210c807dacae2a9a490793764ec6ccbc9e4172adccb2f4de405","observation_id":"d5b38cf0-9fbe-4651-add6-42fe52887800","resolution":{"observed_at":"2026-08-06T14:01:22.602999Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.593453Z","title":null,"venue":null,"work_id":"7bc04937-f503-4cda-b0ad-ac5f614c166c","year":2018},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.162698Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:00db8272f4a299b9a07fda2e9f991cc5182ae3517c07cfe8ac9d3aaa2c9558e2","observation_id":"33647b4a-5ed5-42b2-a51c-8e653b346ffc","resolution":{"observed_at":"2026-08-06T14:01:22.595799Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.585751Z","title":null,"venue":null,"work_id":"bccd8dd6-98d3-47b0-a0f1-383eff8d9320","year":2021},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.165187Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:c012affe7d5a701298110d2d5d523dda99a8e848181228d2dd6182449f48d0ad","observation_id":"98a21dbc-8102-41ab-b312-c6158b729159","resolution":{"observed_at":"2026-08-06T14:01:22.587967Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.578466Z","title":null,"venue":null,"work_id":"049bfbab-cac1-4f05-9852-fa056f62857c","year":2023},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.167458Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:6a62314268cef68524593b88e131abf51fd34538c3d9acae9e3fc7078662b2ad","observation_id":"b77ecff2-f5bf-4822-b1c7-89ab72a76960","resolution":{"observed_at":"2026-08-06T14:01:22.580744Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.570986Z","title":"Cheng, N","venue":null,"work_id":"ddf226b3-1d25-4e55-870e-786f785542c4","year":2018},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.169927Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:b82dff6048a8ab2829920cad97efe2bc604dc89a967d6722dc040bdb33e0a5cc","observation_id":"b6b472f0-4eae-424e-bfd5-a37d6edc8fed","resolution":{"observed_at":"2026-08-06T14:01:22.573611Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.563966Z","title":"Dembo and O","venue":null,"work_id":"c6cb7b63-784a-4640-9b88-c243cfa919b7","year":2009},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.172501Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:e695207d1ce0c301738226281a78104786478c51348a5cf52738a694b39f32e7","observation_id":"515b0163-2991-43da-b850-6a93c7c2de54","resolution":{"observed_at":"2026-08-06T14:01:22.566311Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.556513Z","title":"Dupuis and R","venue":null,"work_id":"50758f0e-eab4-48be-b91c-7c5c8ca6e511","year":1997},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.175308Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:d84b967f5113289d449cfc83bb3ffbab0a45673fa251f64866ce07ed1ef37c6e","observation_id":"6bacb20e-4199-441d-a09e-a5500a7cee92","resolution":{"observed_at":"2026-08-06T14:01:22.558955Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.549110Z","title":"Düring, P","venue":null,"work_id":"4f88f9df-1641-4f52-97bd-ce65ce340aae","year":2009},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.178043Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:e918105d19478180bf32f1ffdbd1050e06afd286dc8accb4c70d5765faa25856","observation_id":"acf6dd9a-85f0-4091-af99-a75766372737","resolution":{"observed_at":"2026-08-06T14:01:22.551430Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.10543","last_updated":"2025-07-23T14:37:10Z","snapshot_observed_at":"2026-08-07T17:06:27.892653Z","submitted_at":"2025-03-13T16:57:05Z","title":"A large multi-agent system with noise both in position and control","version":2},"cited_work":{"arxiv_id":"2503.10543","doi":null,"metadata_source":"pith","pith_arxiv_id":"2503.10543","snapshot_observed_at":"2026-08-06T14:01:22.262718Z","title":"A large multi-agent system with noise both in position and control","venue":"math.PR","work_id":"f9ce0b1c-9d62-4a5e-8b8c-cd88b8146036","year":2025},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.180934Z"},"links":{"cited_paper":"/paper/2503.10543","citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:fcaa1d5af103d2d9b5af15cc3ad4dac78928f0ee72e917222d27d5545073b0ad","observation_id":"6ec4d5ef-4a3f-4e7f-a37f-19349f220b00","resolution":{"observed_at":"2026-08-06T14:01:22.267326Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.542052Z","title":null,"venue":null,"work_id":"caafb5b0-fabb-49e6-88d8-1d424620ed42","year":2000},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.183915Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:0e3931b6febef940c98aa7d6907c5ecfaea54450a9ca53ff7f8fed70fc6ffe01","observation_id":"853fca42-f5bc-4827-ac99-42fbf2fc7175","resolution":{"observed_at":"2026-08-06T14:01:22.544427Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.534979Z","title":"Fornasier, H","venue":null,"work_id":"e3b7173d-96fa-4ef6-81bd-c88fd268c844","year":2020},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.186469Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:26043ad11dfb9874c4e30ec0fb345ff4f68c24be8571fb4eccecbc6468be9d74","observation_id":"cdd643a5-039e-4729-9f68-aff858bed47c","resolution":{"observed_at":"2026-08-06T14:01:22.537385Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.527731Z","title":"Fornasier, H","venue":null,"work_id":"df9d668e-0603-4a47-8b3a-700a50ea932a","year":2021},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.188985Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:1060aa34bc32462a4a9a4f7cfb503dead9c0fecdc54191d2b60ce4a2d56003b0","observation_id":"d94cf1a0-6b70-4be3-9619-4b6268766c24","resolution":{"observed_at":"2026-08-06T14:01:22.530113Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.519726Z","title":"Fornasier, H","venue":null,"work_id":"7d2f69b7-e937-4bcc-8e66-85c667f21d96","year":2022},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.191347Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:8308801043867fba3f479b3cc3b9c4a3c473b2eab2b96275efb1da5b3dc3c10e","observation_id":"10b584d3-a2e8-41cb-9063-56189763796f","resolution":{"observed_at":"2026-08-06T14:01:22.522497Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.512650Z","title":"Fornasier, T","venue":null,"work_id":"197f9485-6814-4848-8c30-962ec309704d","year":2024},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.193712Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:743f22d4501f0d39be1cf935424c39af921eb07dea75a99379977404aaf902a2","observation_id":"e88c45b9-dded-4410-a810-361d7e4d7221","resolution":{"observed_at":"2026-08-06T14:01:22.515090Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.505226Z","title":"Fornasier and F","venue":null,"work_id":"4f4a549d-768b-489e-ab6b-8c8ef85ce3fc","year":2014},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.196274Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:b8452161ec3bded962e82ab0baa7b9ced93f0cfa0dd568cafa41e850731750e5","observation_id":"59fa8b08-8924-458c-a9cb-0e47f6f7e391","resolution":{"observed_at":"2026-08-06T14:01:22.507604Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.498003Z","title":"Fornasier and L","venue":null,"work_id":"dbb1a938-5ed6-49f2-aa83-3abc0383e666","year":2025},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.198725Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:1e8b45c58687a2791cd9ad8092546dafc01e1b26ade427fafd5412fe69108224","observation_id":"f1af592f-0578-4294-b0d1-95f531fddbcf","resolution":{"observed_at":"2026-08-06T14:01:22.500369Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.491081Z","title":"Grassi and L","venue":null,"work_id":"3a6db77d-3923-455d-ba7d-fdcc12db6e9d","year":2021},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.201071Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:821254441c91b59d341cd5117988149ca18910f90f1ee0bed52f9aabdcf91131","observation_id":"d84d3732-3076-4140-9f05-35fee4b5ea3b","resolution":{"observed_at":"2026-08-06T14:01:22.493368Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.483750Z","title":null,"venue":null,"work_id":"28bc3665-467c-483a-9125-eb61b76776ed","year":1975},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.203703Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:ebbfc651c3366f0596534663209d36f99cbb61aa6ec7e03c0ffa240cc83a81f0","observation_id":"5595eae6-6cf9-4e59-bcdf-223eb694b7b3","resolution":{"observed_at":"2026-08-06T14:01:22.486218Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.476177Z","title":"Huang and J","venue":null,"work_id":"ee8a6681-5166-48d6-b8c0-97fc6198f95a","year":2022},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.206130Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:1b3672bbbb0ee8597f86d3532933b6ce04d1e81cbfce6eefe702aedfc93d6519","observation_id":"c772969d-7d72-4fce-85bf-dffb418243f0","resolution":{"observed_at":"2026-08-06T14:01:22.478979Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.469223Z","title":"Kennedy and R","venue":null,"work_id":"145c60a2-0c52-43b3-9a99-f1a5dde1273f","year":1995},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.208336Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:1509f623512e22c3f13107e20c2fe4e769c00c757748925b4606dbceb8374867","observation_id":"17550eef-c0ae-4fd3-b9e7-35a95ef483a7","resolution":{"observed_at":"2026-08-06T14:01:22.471471Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.462154Z","title":"Kirkpatrick, C","venue":null,"work_id":"569f0990-6b21-4e45-93b0-b2504b8b8d12","year":1983},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.210702Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:89cff920c1cd539ea7514385c830d63e2572dcd905abcff307b0c2f2fbdde787","observation_id":"a26db734-d59b-4243-a7bd-f8b83c756952","resolution":{"observed_at":"2026-08-06T14:01:22.464493Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.455353Z","title":"Klamroth, M","venue":null,"work_id":"b752927f-7586-45ff-b3fa-aebf105bec23","year":2024},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.213045Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:5f9b80d8072ede36d406104c70ca68fe65f12242d0731598d8566da0699e3bf9","observation_id":"ae3bf9d6-8e44-4488-8785-c9a4cd97add5","resolution":{"observed_at":"2026-08-06T14:01:22.457575Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.448227Z","title":"Le Bris and P.-L","venue":null,"work_id":"8c5cc449-eb1a-4c4b-9ce0-65e563c78785","year":2008},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.215216Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:c471c4daf349d20c9849146b1637a91fc87fbcba9713710262e61af860f7ce74","observation_id":"83bea707-7f5a-437d-b475-a1748e0e6716","resolution":{"observed_at":"2026-08-06T14:01:22.450552Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.441018Z","title":"Loy and A","venue":null,"work_id":"a1a2b3d1-cb57-46d0-9dc2-c334c9242899","year":2021},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.217908Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:c2978ce7074b727eb10bea28b6216ca42fc5e75ccf408cbae86951a2b5ddf873","observation_id":"f40841f8-c03d-49f3-8e33-02fceab6952f","resolution":{"observed_at":"2026-08-06T14:01:22.443380Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.433884Z","title":"Morandotti and F","venue":null,"work_id":"475429e1-e3bd-4570-8502-474a039e4fec","year":2020},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.220183Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:a2e0ef2ee1150c1227f8b8572654944a3a550fe4ce44beea58213f95832efbac","observation_id":"d8cf90c2-ce24-4c52-897f-e41135f6a5f8","resolution":{"observed_at":"2026-08-06T14:01:22.436260Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.426361Z","title":"Øksendal, Stochastic differential equations, Universitext, Springer-Verlag, Berlin, sixth ed., 2003","venue":null,"work_id":"0f2e963d-53ab-4c2c-8304-a2faba00b78f","year":2003},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.222468Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:71cf197a0cbbbe57ffc5fa43765e6a9f3f04118f2fc8ca3f69a80c3d29676c18","observation_id":"3b39f99a-4f16-47fe-be20-51ced6bf3d0e","resolution":{"observed_at":"2026-08-06T14:01:22.429146Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.419322Z","title":null,"venue":null,"work_id":"d3d25c93-8022-4197-bf65-4308ddcddad5","year":2014},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.224950Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:c3ce09d68c5e042d4e37cfb9d8ca06e873197a7a06d69445bcc0278a1c2e82ce","observation_id":"a1c3063e-65a5-4dc2-855e-2578cec5c10d","resolution":{"observed_at":"2026-08-06T14:01:22.421611Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.411493Z","title":"Piccoli and F","venue":null,"work_id":"836a1836-43a5-4e33-99ee-3a48cb34488d","year":2018},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.227342Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:070f5bbbe1980c5b7aef82c09858bf9a4df0f777a01942c3017a29bbfd9231e8","observation_id":"13fcdbf8-5905-48e9-a85b-46171ff03acd","resolution":{"observed_at":"2026-08-06T14:01:22.414182Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.403401Z","title":"Pinnau, C","venue":null,"work_id":"e7dada9a-b2db-47cc-8416-12d042a4a328","year":2017},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.229596Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:f67c47317a267e88541867e63fd23cbbc4da7a138ba31fa9e834f2d6ccd60027","observation_id":"0666aa94-616f-4105-b8e6-60476b161bb4","resolution":{"observed_at":"2026-08-06T14:01:22.405838Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.395475Z","title":"Raginsky, A","venue":null,"work_id":"44ef5091-23b3-42b3-bc48-79d6fe79c228","year":2017},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.231833Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:23eba5cb46df6c42b525a3d17c91aa269b082bab237cae126c3b10d30d0f2833","observation_id":"41a11da3-e9f2-4996-a3c7-bd12bedfe851","resolution":{"observed_at":"2026-08-06T14:01:22.398325Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.387274Z","title":"Storn and K","venue":null,"work_id":"b9783076-f7c8-46f7-a9db-05365d930169","year":1997},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.234178Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:3f89435136ec17e775a1caa9ce0f2e64717b173724d6f069bcee6bb15dda1ec0","observation_id":"6a2688f1-5fa4-447f-a764-f9e725de60a0","resolution":{"observed_at":"2026-08-06T14:01:22.389997Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.379259Z","title":"Toscani, Kinetic models of opinion formation, Commun","venue":null,"work_id":"c888dfc2-55fa-4943-b9d0-cba589fc34d1","year":2006},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.236402Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:affdd3cb77ecc026a780f8e436f4eb502bbbc182bdab3d8a5487752ed255e8e9","observation_id":"169f0ee8-978c-45c1-882e-fe573a112a50","resolution":{"observed_at":"2026-08-06T14:01:22.381913Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T14:01:22.371203Z","title":"R. Caccioppoli","venue":null,"work_id":"6dbba322-9561-4174-9f33-c68cf9f78f64","year":2008},"citing_paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-06T14:01:22.238573Z"},"links":{"citing_paper":"/paper/2507.20029"},"observation_digest":"sha256:7e7e2e2c91c072c8f56b9d350b135736ff9966bea1502da680cea62db144fb75","observation_id":"4781331d-9c3c-4705-878c-60311aaae945","resolution":{"observed_at":"2026-08-06T14:01:22.373843Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.20029","last_updated":"2025-07-26T18:11:11Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-06T14:01:20.099749Z","submitted_at":"2025-07-26T18:11:11Z","title":"A general perspective on CBO methods with stochastic rate of information"},"reference_resolution":{"displayed":43,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":10,"verified_exact":1,"verified_fuzzy":32},"total_outbound_references":43},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 11 August 2026, this Paper Citation Record lists 43 of 43 outbound references and 1 inbound Pith citation observation for arXiv:2507.20029."}