{"as_of":"2026-08-19T15:41:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:eac6a7ea41f8beac1800c8e5b699b8ed932b7300a6f8bf28070da72ba3c3fefb","coverage":[{"denominator":20,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":20,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T11:59:59.687725Z","state":"measured"},{"denominator":20,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":20,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-19T06:32:44.657259+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.22220/citation-record","integrity":"/paper/2507.22220/integrity","json":"/paper/2507.22220/citation-record.json","paper":"/paper/2507.22220"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.615680Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.615680Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:20762f42e7165260615aca8a787ddb27bb262b39acf886fc8d3813a2f0233c23","observation_id":"a716143d-5a7a-4118-858c-451dae1ddddb","resolution":{"observed_at":"2026-08-06T11:59:59.615680Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.620706Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.620706Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:628e5a0212d4f94f0c1aabc12389415a1c044bcdc7b89cf1e73e98eab3c83a30","observation_id":"bbfac554-a0cb-4862-9754-8743e91214d6","resolution":{"observed_at":"2026-08-06T11:59:59.620706Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.937164Z","title":null,"venue":null,"work_id":"801e3ea0-e83b-4c8f-9ef6-e07550c684ff","year":2024},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.624861Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:78582e99aa9a5e72d4e04be2855387227c53292b90b6099018cd445b4e28c651","observation_id":"7f92074a-349f-4971-8963-0251a8735fdf","resolution":{"observed_at":"2026-08-06T11:59:59.940839Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.924897Z","title":"and Guestrin, C","venue":null,"work_id":"bf5fee8b-66e0-4f4e-b8d5-8a3c4f981bd7","year":2016},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.628753Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:884e33f36246fe3f421c1ff0a8f8264ba56941f144cf5f3b8fa9b35836efb015","observation_id":"abab36f5-2845-4491-99b9-6bb76be8da94","resolution":{"observed_at":"2026-08-06T11:59:59.929260Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.912976Z","title":null,"venue":null,"work_id":"d4effe94-d7e9-4701-a60e-ee4baee9218a","year":2024},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.633010Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:460aaed64f9e0bf6469313aa1921d9946787b1b1516c573baa09aa1bce4ccf2f","observation_id":"14457a99-4b1d-4b7e-b6b1-516d4198c595","resolution":{"observed_at":"2026-08-06T11:59:59.916575Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.901264Z","title":null,"venue":null,"work_id":"0347c7f1-dcfc-42a1-af1d-98d2274a13b6","year":2006},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.636998Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:c59cf793c5023c249258b2440f1916d4ba21281a3ee5a8f58f49410cfd08076d","observation_id":"874ca0d4-371f-446b-a2fb-62c68001913a","resolution":{"observed_at":"2026-08-06T11:59:59.904840Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.889330Z","title":null,"venue":null,"work_id":"815c50d5-b665-4fd3-8179-d7da26234b32","year":2009},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.640797Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:0ba7e567d8479d32436e98455f98bb1e2836eefa6db90cdefda8789c32942ea0","observation_id":"210f51be-8b2c-4cc7-a530-ee9e6945a899","resolution":{"observed_at":"2026-08-06T11:59:59.893050Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2412.02722","last_updated":"2024-12-02T19:31:44Z","snapshot_observed_at":"2026-08-17T22:51:41.938099Z","submitted_at":"2024-12-02T19:31:44Z","title":"Enhanced N-BEATS for Mid-Term Electricity Demand Forecasting","version":1},"cited_work":{"arxiv_id":"2412.02722","doi":null,"metadata_source":"pith","pith_arxiv_id":"2412.02722","snapshot_observed_at":"2026-08-06T11:59:59.721996Z","title":"Enhanced N-BEATS for Mid-Term Electricity Demand Forecasting","venue":"cs.LG","work_id":"cc111975-c88f-4988-84db-555fe90c161f","year":2024},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.644474Z"},"links":{"cited_paper":"/paper/2412.02722","citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:c3450c0ad35d734d19b77d366c0a2a0023eef32e00daae0633cb3a5314bbbe51","observation_id":"60a8f2b5-9491-4c52-9deb-285b7de8e5d4","resolution":{"observed_at":"2026-08-06T11:59:59.729200Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.877218Z","title":null,"venue":null,"work_id":"8846e068-4d86-4040-9174-35789a7070cd","year":2017},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.648817Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:96b1f419449079e7901819a0787b6fee6c17e00a8bafbf674377dce51fbf91ba","observation_id":"c92fe4fa-99cc-4c71-b88d-3c18968059d0","resolution":{"observed_at":"2026-08-06T11:59:59.880774Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.865186Z","title":"and Wang, L","venue":null,"work_id":"f53e5db4-d1bc-4047-8c9a-f22561cb0f76","year":2022},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.652365Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:fdf5f80fac42eb4baee52885b4c91327c4bcfb5e6afb4a3994e8177c6d71d76d","observation_id":"25bfac73-56b7-4536-abc1-0379890cbc9e","resolution":{"observed_at":"2026-08-06T11:59:59.868898Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.852676Z","title":null,"venue":null,"work_id":"9bff27ce-c626-4d49-a3a4-0f5739ffddc1","year":2025},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.655988Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:0fa7739d5b559bca9fb0e3ac8b3a6074cb434b9844b6fb0c948ce9485857e3ab","observation_id":"d90296ee-782c-4be5-b4db-87e56b08f720","resolution":{"observed_at":"2026-08-06T11:59:59.856418Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.840705Z","title":null,"venue":null,"work_id":"9909082c-13ac-4e0d-8cb6-4dd2563555ef","year":2020},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.659708Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:0c49fd1079a59c040d812689e423066b34c1070e9f71ccf03ab7aa9a4a30970c","observation_id":"4a6f80c7-8ff4-4235-8077-c596da8d4d14","resolution":{"observed_at":"2026-08-06T11:59:59.844427Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.828746Z","title":null,"venue":null,"work_id":"e470d4e7-1e88-4fa8-886b-2c6bd1103b7d","year":2025},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.663453Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:98029d17725f2d20f008c1a014b1b0aabedf83dac134fc6639d8cd79b1dc69a1","observation_id":"25e28431-2d8d-4d94-a527-4bc7768ba195","resolution":{"observed_at":"2026-08-06T11:59:59.832381Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.816590Z","title":"and Dudek, G","venue":null,"work_id":"ad0583c9-d3bb-4259-98b5-e056d21ece9b","year":2020},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.666998Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:f46868c80cd76be01fe73999dd7260afb8cfaedb82d14e30cf526037a7d5282c","observation_id":"06e7cc8a-bf21-455d-8c05-c138bf355730","resolution":{"observed_at":"2026-08-06T11:59:59.820262Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.804754Z","title":"and Paliwal, K.K","venue":null,"work_id":"52d04014-4a1d-4e7a-ac11-43d9247a67b4","year":1997},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.670498Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:30f80c73c63be4f459e5d21418eb6f479570c86ad2d0ee17ed049a6791ec77e5","observation_id":"9cf3f514-725b-4fd4-b607-17a8b0ada677","resolution":{"observed_at":"2026-08-06T11:59:59.808392Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.790986Z","title":null,"venue":null,"work_id":"0443b686-7429-4c73-868a-19c6f87c223a","year":2022},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.673986Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:7013355abb702097f131e8e6277e203a4ff7c486c1f1f457f2aa47ac4015f602","observation_id":"ca5dfdf7-33e1-4288-9028-cd9d355f0172","resolution":{"observed_at":"2026-08-06T11:59:59.795333Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.778632Z","title":null,"venue":null,"work_id":"288c55d9-529f-4220-9c64-f5d30f145a8a","year":2023},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.677503Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:e19930d7fcb114812c08d4f72c6bfb2b8f09532fac4d96fddea05b06c5854a97","observation_id":"d027e68f-a95f-49fa-aae9-5391ad3da977","resolution":{"observed_at":"2026-08-06T11:59:59.782342Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.765899Z","title":"and Ziel, F","venue":null,"work_id":"c70460e7-6620-4668-89cf-4523021a4e23","year":2024},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.680979Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:77285072a7ca0e5d0892f41992ca4e0cc25d4078c32d796c52db72d2cbf50323","observation_id":"3b34eadd-4428-488d-971d-4df0dda6b1b3","resolution":{"observed_at":"2026-08-06T11:59:59.769691Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.751918Z","title":null,"venue":null,"work_id":"4d61a968-5526-4a16-b215-c6e2afc20b87","year":2024},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.684369Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:89f4cee97620c04f1167e0429ee04f0b04019438bdd1c9494b946208bff5b130","observation_id":"9d27c5d7-fe6d-4cfc-8ce8-1ffd8eca27f0","resolution":{"observed_at":"2026-08-06T11:59:59.755840Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:59:59.738481Z","title":"and Schmidhuber, J","venue":null,"work_id":"7a472306-8072-4d4f-bd6d-ab9b1b22ea2e","year":1997},"citing_paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-06T11:59:59.687725Z"},"links":{"citing_paper":"/paper/2507.22220"},"observation_digest":"sha256:ee343ea46b8b63361ca8abb62239d5ee0cc9e073944712734742d6f5c94e3207","observation_id":"2b6984c3-852c-4909-be69-c2ce14bcce56","resolution":{"observed_at":"2026-08-06T11:59:59.742314Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.22220","last_updated":"2025-07-29T20:36:24Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-17T07:10:39.685242Z","submitted_at":"2025-07-29T20:36:24Z","title":"Explainability-Driven Feature Engineering for Mid-Term Electricity Load Forecasting in ERCOT's SCENT Region"},"reference_resolution":{"displayed":20,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":13,"verified_exact":1,"verified_fuzzy":6},"total_outbound_references":20},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"thesis":"As of 19 August 2026, this Paper Citation Record lists 20 of 20 outbound references and 0 inbound Pith citation observations for arXiv:2507.22220."}