{"as_of":"2026-08-10T05:30:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:5cdf5ee9e52a2b29052daadd96cc9aed0598bc152ad8bc1afd6368b160557ae8","coverage":[{"denominator":30,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":30,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T10:59:25.680800Z","state":"measured"},{"denominator":30,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":30,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-09T06:31:02.800959+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.23270/citation-record","integrity":"/paper/2507.23270/integrity","json":"/paper/2507.23270/citation-record.json","paper":"/paper/2507.23270"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.163576Z","title":null,"venue":null,"work_id":"291de5fa-6719-48f0-ba74-0a47c2910760","year":2009},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.577879Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:34efd0981d23a7826e0fa9c89b751fac06d97efbe8a31d9c59f9bcd9db16d03f","observation_id":"3ce19a04-f608-46d4-82ed-625e4a1b2b0b","resolution":{"observed_at":"2026-08-06T10:59:26.167565Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.151581Z","title":"Assembly procedure generation for reconfigurable robot cells considering operation concur- rency and geometrical constraints,","venue":null,"work_id":"31ec0cfd-0c86-479a-9d46-d975c8ffa8d0","year":2024},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.581958Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:c1175c72d7241dc782f862379cc609bbc3ca59d3a45e132b11498fc13c7d5e7e","observation_id":"5504cc9f-071a-4f4f-9d81-fcb4a26ebe98","resolution":{"observed_at":"2026-08-06T10:59:26.155495Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.139602Z","title":"Bandit based monte-carlo planning,","venue":null,"work_id":"bc68225d-e336-404f-a30b-37b2f17bc0bc","year":2006},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.585851Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:aafee0f2b4e18a4cc89ea11d910aaf9272c9553c181a76f4246d259a6669a0df","observation_id":"53c9709f-c367-4ec1-9d5f-cb7d15542fb6","resolution":{"observed_at":"2026-08-06T10:59:26.143391Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.127470Z","title":"Toward efficient trajectory planning: The path-velocity decomposition,","venue":null,"work_id":"4ffa8ff4-1964-4c57-a4eb-35e40ed93ce6","year":1986},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.589710Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:dd508698e2d2ae4e7427bff8b4b154be00aaeca6c2395756cc665681684b2eb1","observation_id":"b1ec4a99-5817-4b41-8690-7ca5f1708adc","resolution":{"observed_at":"2026-08-06T10:59:26.131178Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.593804Z","title":"A new approach to time-optimal path parameterization based on reachability analysis,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.593804Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:91ca1f4fb020e3631f59d34db6602bc658f309ddb52fffec9fae7f4c1346d452","observation_id":"b5a23ed3-103d-4f6e-b2c7-467359cab834","resolution":{"observed_at":"2026-08-06T10:59:25.593804Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.106662Z","title":"Time-based RRT algorithm for rendezvous planning of two dynamic systems,","venue":null,"work_id":"4c0e8d23-8a46-4e66-a95e-aebd56c92576","year":2014},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.597700Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:3ad144793af73245f7f97c27c7c68e3fdab78df6bab70f7fea8f68276546b9e3","observation_id":"abe0eaad-bde1-41c5-9a21-3ea5f9111645","resolution":{"observed_at":"2026-08-06T10:59:26.110530Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.093981Z","title":"St-rrt*: Asymptotically-optimal bidirectional motion planning through space- time,","venue":null,"work_id":"c4486a5b-47fd-44af-8229-e354812959dc","year":2022},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.601717Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:919ca7f8f795f71e3a99c5fc260525a9ce63612e122d56644a90ae1e89fe7b52","observation_id":"c2bab077-57a3-4aff-89c6-b64065ff25f9","resolution":{"observed_at":"2026-08-06T10:59:26.098058Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.081070Z","title":"On multiple moving objects,","venue":null,"work_id":"0780a9a8-31e4-42df-804e-f187c4211a73","year":1987},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.605195Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:579ac54ef6197e14ab82af77953f1d4f9c0e580c4d50f6367d4466d0810e3082","observation_id":"e247ea6a-f616-4b79-94b7-a6fbd30bf6c9","resolution":{"observed_at":"2026-08-06T10:59:26.085211Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.068052Z","title":"Path planning in 1000+ dimensions us- ing a task-space voronoi bias,","venue":null,"work_id":"1590fbb2-6cb0-40e4-9656-44297516ace7","year":2009},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.608621Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:0942fdbd11cec2f65a64bca3d3a5d92e5f3c22307aed9cf642b07a59a7e5b996","observation_id":"f9fef42d-af19-4392-ad63-7c5f5c4e4feb","resolution":{"observed_at":"2026-08-06T10:59:26.071838Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:26.055913Z","title":"Multilevel motion planning: A fiber bundle formulation,","venue":null,"work_id":"76b4a357-46a5-45d2-9d49-ea7d362b91c5","year":2024},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.612044Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:beb1b562ef4ce5d8ef17a18502995272688cb38e89b8698b8d9b9c8706849614","observation_id":"a9d32e05-b14b-4755-938c-083821a4e0d1","resolution":{"observed_at":"2026-08-06T10:59:26.059677Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.937782Z","title":"Centralized path planning for multiple robots: Optimal decoupling into sequential plans,","venue":null,"work_id":"396f34a3-be63-46a2-be98-e4a3db65f0fa","year":2009},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.615483Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:c4baa0c4e3ff0fbcb0ad9f2a9d7f7074c9d9a09acc759e7aa01ab4e157d43bad","observation_id":"13f8d075-119e-4f23-83bd-08c215d80eac","resolution":{"observed_at":"2026-08-06T10:59:26.046922Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.925699Z","title":"Multi-modal motion planning in non- expansive spaces,","venue":null,"work_id":"ef4a5395-dc3c-4965-ac0d-c4e844556b17","year":2010},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.618889Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:ddb269da3dfccb744801901082bd7da807a3a0443193b83e7e966f895d97ef40","observation_id":"b70e267c-75b7-4c3e-9598-ef52a730a49f","resolution":{"observed_at":"2026-08-06T10:59:25.929385Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.913665Z","title":"Randomized multi-modal motion planning for a humanoid robot manipulation task,","venue":null,"work_id":"2dccc1f5-9446-4625-b4de-68032da9de49","year":2011},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.622452Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:1acdcb9cf8811ca1396310981b11a0485073c07a4778e2f8ff36f53ef8501335","observation_id":"262bab26-fb61-40bc-b6d0-5b7e6c75b93e","resolution":{"observed_at":"2026-08-06T10:59:25.917566Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.625853Z","title":"Integrated task and motion planning,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.625853Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:32448405f64a4b024fb6257360baad884910fac67d060ec3530db43448e52603","observation_id":"dc229761-403d-42d3-ab78-dddab9ca8c74","resolution":{"observed_at":"2026-08-06T10:59:25.625853Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.891547Z","title":"Long-horizon multi-robot rearrangement planning for construction assembly,","venue":null,"work_id":"510f1995-635d-4eb4-8c19-8fb0e9831ab0","year":2023},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.629331Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:660d711ed1b56976d85bc0109f03b6a9cf2b57443900c4c05424a8178ba07bb2","observation_id":"e8c12bad-5ea5-4c8b-a612-3161d1a423fd","resolution":{"observed_at":"2026-08-06T10:59:25.895251Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2203.02475","last_updated":"2022-03-04T18:12:49Z","snapshot_observed_at":"2026-08-05T10:34:19.934772Z","submitted_at":"2022-03-04T18:12:49Z","title":"Cooperative Task and Motion Planning for Multi-Arm Assembly Systems","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2203.02475","snapshot_observed_at":"2026-08-06T10:59:25.632613Z","title":"Cooperative task and motion planning for multi-arm assembly systems,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.632613Z"},"links":{"cited_paper":"/paper/2203.02475","citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:b879eed74ae47432f05bd4ae09bbd89db53f069179f7cb599ac29fe6c1b239e9","observation_id":"b53210e5-af6a-4cb1-81ee-d62065a4d281","resolution":{"observed_at":"2026-08-06T10:59:25.632613Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.879933Z","title":"Multi-robot geometric task-and-motion planning for collaborative manipulation tasks,","venue":null,"work_id":"c8fae929-cf59-4a2a-8b61-bbf8bb428fae","year":2023},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.636570Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:bbce6bac0759f7fea2f94218de9246631edcd2b68358603677e0d2c53a7a8cbb","observation_id":"ffc67453-9207-40d0-b498-594996f36ded","resolution":{"observed_at":"2026-08-06T10:59:25.883687Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.868138Z","title":"Multi- arm trajectory planning for optimal collision-free pick-and-place op- erations,","venue":null,"work_id":"645990eb-b09e-4b5d-b2e0-09f1180f226a","year":2024},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.640003Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:c1e008d3f94bd3239e271602d6283e2d16f622103c1acfbed755902862b6427c","observation_id":"29f3236c-4856-4787-95c0-b92b9c055dc2","resolution":{"observed_at":"2026-08-06T10:59:25.871950Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.856808Z","title":"Optimization by simulated annealing,","venue":null,"work_id":"0c1e7a40-0e5f-41b0-83cd-5e1d162881e7","year":1983},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.643511Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:957cea37a32808f8f45c14cfb1690ac1d9dc2703c669386dcd5c89d1f0ee2fb2","observation_id":"95ff067c-8920-4dfa-9082-0f9ded36abda","resolution":{"observed_at":"2026-08-06T10:59:25.860300Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.844900Z","title":"Statistical cooling: A general approach to combinatorial optimization problems,","venue":null,"work_id":"2d663df2-e5ff-4eca-97ed-3a7b3b6dba19","year":1985},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.646815Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:f3751d63516e2d9fd5b0dfca178d3800b30a8afba7a32cdd793d3de7d70d5df6","observation_id":"5f8859bf-fbbb-4222-85b4-75b3b350287c","resolution":{"observed_at":"2026-08-06T10:59:25.848595Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.832757Z","title":"Multi-robot task scheduling in micro-manufacturing,","venue":null,"work_id":"8f04cb53-0fa0-452d-8506-e849da09bbb0","year":2005},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.650639Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:1103dcde9433a9fad52a4294b2809f71ad9effb914a4d0d9e8363fd14923eedc","observation_id":"65c85eb6-2071-4ab7-bad6-8256647ab09f","resolution":{"observed_at":"2026-08-06T10:59:25.836592Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.821263Z","title":"A new optimizer using particle swarm theory,","venue":null,"work_id":"42bf7db6-a032-4f20-b240-1f9ab1582d0c","year":1995},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.654012Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:00a60c833ee0c22181a355660462ded3fb9137ec401c5a604ca3f64ed0579f22","observation_id":"85107e03-8e8b-4c51-9aac-1bf22147da2a","resolution":{"observed_at":"2026-08-06T10:59:25.824848Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.808436Z","title":"A note on two problems in connexion with graphs,","venue":null,"work_id":"829f328a-81fd-440a-9e67-7e51bdd24411","year":1959},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.657487Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:de3e42fb7af989ae13f85f4a62ede9493bf0570154b8da94520a82617598e533","observation_id":"4747baac-87f1-4914-93be-35ca65368267","resolution":{"observed_at":"2026-08-06T10:59:25.812717Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.795589Z","title":"Probabilistic roadmaps for path planning in high-dimensional configuration spaces,","venue":null,"work_id":"f45625f4-ef6b-451c-bc38-366b727507a0","year":1996},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.660930Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:adbd9464a72850891419011dacbc9d4b5973a5ea037ce7463951550ccb9cb04e","observation_id":"9591ed07-c1a2-470d-b29e-24850ba6fb77","resolution":{"observed_at":"2026-08-06T10:59:25.799266Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.783581Z","title":"Rrt-connect: An efficient approach to single-query path planning,","venue":null,"work_id":"beaad98b-8d1e-4de9-b4f8-14ce59d0c888","year":2000},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.664248Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:e3d820c289135c124f9cccea6a7f17c08372879656038b372acf98e35fc8a621","observation_id":"4eb0ae98-7a36-4470-9129-63482b1983a0","resolution":{"observed_at":"2026-08-06T10:59:25.787348Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.770961Z","title":"SANDROS: a dynamic graph search al- gorithm for motion planning,","venue":null,"work_id":"271063ce-23d7-448f-a283-987be04ddbc8","year":1998},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.667648Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:41b3b39c33f0b262f0a04546beb654d1de214dc48bad2b85355ae93433a1d936","observation_id":"42fb5cc8-dc20-40d1-bebb-8a97c321848d","resolution":{"observed_at":"2026-08-06T10:59:25.774889Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.758365Z","title":"Creating high-quality paths for motion planning,","venue":null,"work_id":"b0cdd96f-2814-4f05-b881-1b977bd17c70","year":2007},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.670897Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:2449573d94f06b1137b5588f6c41e0f4158496d895db98c51dc57ee7170f8039","observation_id":"74eb3bde-424f-4982-8602-dda648c8eb6d","resolution":{"observed_at":"2026-08-06T10:59:25.762481Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.745742Z","title":"Pybullet, a python module for physics sim- ulation for games, robotics and machine learning,","venue":null,"work_id":"d2dd7b73-e0f9-42df-8811-fc44ce738a5c","year":2016},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.674142Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:0d4bb73b265324c195a7527f0e387e5840565858b4a325472bb92eb728966a22","observation_id":"7332b14e-048c-4d1a-99d8-9f6eb48da0b0","resolution":{"observed_at":"2026-08-06T10:59:25.749833Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.677556Z","title":"The Open Motion Planning Library,","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.677556Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:04bc182d18dd2b2ce87911877b96d63f016d9c49b0e2dd7f0984ce10e67b23d4","observation_id":"987f855f-b1b2-47cd-b3ea-9f986b50f7d0","resolution":{"observed_at":"2026-08-06T10:59:25.677556Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T10:59:25.722620Z","title":"A modified particle swarm optimizer,","venue":null,"work_id":"fe1f0c83-9a48-4615-8b47-b864891171c4","year":1998},"citing_paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells","version":3},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T10:59:25.680800Z"},"links":{"citing_paper":"/paper/2507.23270"},"observation_digest":"sha256:fa9095e0ea75e2f9d4d8ccb997c1de45138c9776a1354bc8641f530f8bf8afc7","observation_id":"8ae645c6-0e6a-42d4-b43e-37eef4181d2e","resolution":{"observed_at":"2026-08-06T10:59:25.728077Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.23270","last_updated":"2026-07-15T11:07:45Z","latest_version":3,"primary_category":"cs.RO","snapshot_observed_at":"2026-08-07T21:00:49.144594Z","submitted_at":"2025-07-31T06:11:40Z","title":"Simulation-based planning of Motion Sequences for Automated Procedure Optimization in Multi-Robot Assembly Cells"},"reference_resolution":{"displayed":30,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":5,"verified_exact":0,"verified_fuzzy":25},"total_outbound_references":30},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 30 of 30 outbound references and 0 inbound Pith citation observations for arXiv:2507.23270."}