{"as_of":"2026-08-24T03:18:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:16cc2559d50d852a5582ed702e04680f3e177af278d853fe960dfc63d751b22a","coverage":[{"denominator":52,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":52,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-05T12:03:47.001943Z","state":"measured"},{"denominator":53,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":53,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-23T06:30:58.430688+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-25T23:23:23.195917Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-07-04T17:50:00.757854Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"cited_work":{"arxiv_id":"2509.02052","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2509.02052","snapshot_observed_at":"2026-07-04T17:50:00.757854Z","title":"arXiv preprint arXiv:2509.02052 , year=","venue":null,"work_id":"4bb80f89-e4e9-45d1-a91c-ee76f5c951cd","year":null},"citing_paper":{"arxiv_id":"2606.24386","last_updated":"2026-06-24T08:21:23Z","snapshot_observed_at":"2026-08-16T10:34:36.093463Z","submitted_at":"2026-06-23T10:18:54Z","title":"Line Planning at Scale: Models, Methods, and Insights","version":2},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-06-25T23:23:23.195917Z"},"links":{"cited_paper":"/paper/2509.02052","citing_paper":"/paper/2606.24386"},"observation_digest":"sha256:f5e7947b3e7f69b95b30e19fa4da85c0091f5d68c8a920a0068951bbf768e3b6","observation_id":"e6ab49b9-0419-4d68-bdab-de98acc4b9bc","resolution":{"observed_at":"2026-07-04T17:50:00.759631Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2509.02052/citation-record","integrity":"/paper/2509.02052/integrity","json":"/paper/2509.02052/citation-record.json","paper":"/paper/2509.02052"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:57.582421Z","title":", author Ceder, A","venue":null,"work_id":"3693f61e-4d48-4c63-81cc-add1244228c3","year":2014},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.208551Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:e64a5143aa9bfd66fe6b1eecd327d43975181419915404bc95464ac4070a7d26","observation_id":"21b3b9ad-d202-4b6a-841a-839c2938693a","resolution":{"observed_at":"2026-08-05T12:03:57.681382Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:57.323317Z","title":", author Tamp \\`e re, C.M.J","venue":null,"work_id":"6c885565-568b-468b-997c-b3e5bb6d047a","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.306501Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:5f46408bd84f56caad3bce55f48154c7331dcf69fc320a179c5ea3c9ff97853b","observation_id":"73f9267d-9905-4ab4-b855-c7a0a8e6d8cd","resolution":{"observed_at":"2026-08-05T12:03:57.456972Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:57.075047Z","title":", author Maknoon, Y","venue":null,"work_id":"393e1bec-0603-41c7-8e37-e29476dccecc","year":2017},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.444970Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:200b538a2c88adf0fa1c1f05229600c7de48eb0af72a6a38c8ac320eecef1e57","observation_id":"2f8c9784-f622-40ed-b844-92c0568f8bb6","resolution":{"observed_at":"2026-08-05T12:03:57.160605Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:56.842989Z","title":"o rfer, R. , author Gr \\","venue":null,"work_id":"08fb5d27-4c17-46bd-ab3a-ecc90e88fad9","year":2008},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.590177Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:6eb0c060c08bfaaeb49df7227dec390d79c96bd63d87b31ded5c78ab84893a46","observation_id":"e16c897a-68c1-4d3b-b093-aa262bdeb24b","resolution":{"observed_at":"2026-08-05T12:03:56.964620Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:56.619809Z","title":", author Hoppmann, H","venue":null,"work_id":"c70f3739-c930-4f48-8d8a-d8d9645c984e","year":2013},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.703400Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:c98eb2d433c1893060d54479efedc5e73731446e4050ca37eb5ca9fb894ab00c","observation_id":"6cb9dd6b-4963-463c-a938-e3dc4df96ee7","resolution":{"observed_at":"2026-08-05T12:03:56.716862Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:56.510737Z","title":", author Larsen, J","venue":null,"work_id":"39778c99-c333-4a25-b59d-f0051fe57c33","year":2019},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.819445Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:eeaf7b61f86e480c445942107816412632e4b4f70aa66ecadfe333cf91a79e34","observation_id":"bac2c453-e147-4bfb-8da1-f4d2faf6b6d2","resolution":{"observed_at":"2026-08-05T12:03:56.567220Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:56.386764Z","title":", year 1998","venue":null,"work_id":"8fc57c34-b85e-47ce-a0c6-4b6c5813be7a","year":1998},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:41.935750Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:665d30dff14190163286b0e744d615847810b38a8d32a57104cd0c2986f842dd","observation_id":"d994d490-406c-4b97-a872-e579517f3257","resolution":{"observed_at":"2026-08-05T12:03:56.446475Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:56.190190Z","title":", author Wilson, N.H.M","venue":null,"work_id":"87449a64-1e9a-4a26-89b8-7923e801469e","year":1986},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.029370Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:fe06a1ab9b6a60b19aaae9679d7854dfdeac5ac5616eb412cbeae9743f469c7d","observation_id":"0bc303c2-7720-404a-814c-bdb2b3652057","resolution":{"observed_at":"2026-08-05T12:03:56.315858Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:55.933835Z","title":"title I nwoners per gemeente","venue":null,"work_id":"d6f571db-cd75-4828-bbfa-01461943f9cd","year":2025},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.145293Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:ebd9ef1880af35ffbea8ed3968263448db67191aa99f2946a19e780e787c2cd5","observation_id":"0daf8840-4dd0-4fef-9b80-86809e35a609","resolution":{"observed_at":"2026-08-05T12:03:56.052864Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:55.701000Z","title":", author van Dijk , N.M","venue":null,"work_id":"1b5cecee-7f6f-479d-a71e-4d3f9358eff4","year":1998},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.228292Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:c1c614cf23a7116f5c559ba89fdbfa712e5bbcc06fc3d869173623d842601ed8","observation_id":"dcb766d8-bb2e-40af-a267-1ee2ee45fe13","resolution":{"observed_at":"2026-08-05T12:03:55.812154Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:55.512737Z","title":", author Mulangi, R.H","venue":null,"work_id":"25ddb694-6ef0-466f-90b0-b990bb48de0a","year":2020},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.339611Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:0b6ec3e9bdce3b96206442a98dca6fe5ebfd0c2c2e5936c50ec53a6ebcb633e8","observation_id":"bc1c750d-66fa-41f7-95e6-acc46f1c153a","resolution":{"observed_at":"2026-08-05T12:03:55.623375Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:55.256510Z","title":", author Vaatstra, I","venue":null,"work_id":"c8628675-b614-46fe-bf80-d33de7f7305b","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.449297Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:151b26fcf8f41b56d666862549e560bbc4108bc3777494f1b45490bcd2868cae","observation_id":"29fd97be-6f93-4496-af94-5e5efec0c7a9","resolution":{"observed_at":"2026-08-05T12:03:55.383465Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:55.025471Z","title":", author Li, D","venue":null,"work_id":"40ef08c5-bbfb-479e-8b12-4ea285ae6152","year":2020},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.591989Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:6b7e0d571059df2391c8b8634ed2dc0a563f327a965b62b42060dc4743f74d8e","observation_id":"9f379d65-6a52-45d0-94f4-8fe64d59b0e8","resolution":{"observed_at":"2026-08-05T12:03:55.127104Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:54.840250Z","title":", author Van Kooten Niekerk, M","venue":null,"work_id":"b8cc4294-4c6d-4e42-abe6-4dedde6e9ad4","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.688683Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:c123e5ae6de1ba466da2e60c7d88883a7c24cd278b2033209ef56259e8b09df3","observation_id":"04a8797d-98ba-474a-b405-808f02c5a756","resolution":{"observed_at":"2026-08-05T12:03:54.952404Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:54.656948Z","title":", author Vansteenwegen, P","venue":null,"work_id":"0deee639-9f01-41c5-a7d5-e359d01719e0","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.777317Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:74db52790f881d12605904fe116070467b3107bfe8c0854fba7ec067c93fed8f","observation_id":"bf33c90b-fcb3-4a9e-ad5d-89a5fc10446d","resolution":{"observed_at":"2026-08-05T12:03:54.731066Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:54.421927Z","title":", author Nie, L","venue":null,"work_id":"acab296d-d753-4d7f-b5f0-9488f7705009","year":2015},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:42.887192Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:00af79edcfa99c6ca73e4e82480ce1fa5f6eabffb985de4dacc9210dc473b8ad","observation_id":"a2cab213-7ed0-4ce4-9c5f-f6d237218642","resolution":{"observed_at":"2026-08-05T12:03:54.534297Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:54.235124Z","title":", author Van Hoesel, S","venue":null,"work_id":"0648b0d6-ed16-4e41-b15b-eaac8972ba3e","year":2004},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.022098Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:f2f8b9025f7e4cb2aee990a772d66e7cf109c25dd7aaca2c0c8d6c6808751411","observation_id":"fa7dcabe-7b24-44d5-959d-85af6d1057d1","resolution":{"observed_at":"2026-08-05T12:03:54.331279Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:54.046057Z","title":", author Yang, H","venue":null,"work_id":"ec04b06a-f719-40ef-8091-03b4e4ce5923","year":2006},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.125590Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:15efe93ff1ab80be3b97871e4e3e585e0cc14feffd61b22a33c8e6693b582b9e","observation_id":"4d1add9e-f91d-4f56-92d4-c83a74884148","resolution":{"observed_at":"2026-08-05T12:03:54.143280Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:53.802109Z","title":", author de Bruyn , M","venue":null,"work_id":"17c5d0db-14c1-41bd-9600-fb53650701f8","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.271022Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:5496dcc3c21ec109551df1f44a8eda29552e8ffd8f904da86be0f2bd7c24f977","observation_id":"933e04fd-d749-42cb-a61e-655af193d8c1","resolution":{"observed_at":"2026-08-05T12:03:53.927525Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:53.574312Z","title":", author Shires, J","venue":null,"work_id":"49711c38-ee23-44da-b475-638ad21dee72","year":2006},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.374721Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:e6ef4b12a9aaea1fe9a4f8c54426efe51fbe511ffa60a6f7a6ba4cd901003bbd","observation_id":"2a45dce6-bb0d-42c5-8649-b1f0fde5cdcf","resolution":{"observed_at":"2026-08-05T12:03:53.677091Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:53.394791Z","title":", author Raviv, T","venue":null,"work_id":"f7e9d9ba-b899-4e00-a706-976d7cc76102","year":2013},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.467942Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:faf89c012187f38fd1e2d2281304245d419cdec06cd74277269964adcfa51b45","observation_id":"845e2311-743e-41f9-8fe9-31b0a909149b","resolution":{"observed_at":"2026-08-05T12:03:53.470902Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:53.228475Z","title":", author Xu, R","venue":null,"work_id":"3caa10ea-406d-4942-8067-25f67a7dc2ce","year":2019},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.569748Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:cc0ba3241e2a157a3a6de1550e0aa8b60a2a5f3b2fca8cd41f5cff56bf4632df","observation_id":"d2daf5c6-6c65-4df2-a235-4804ca62f7de","resolution":{"observed_at":"2026-08-05T12:03:53.296687Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:53.067845Z","title":", author Florios, K","venue":null,"work_id":"e951dcf8-f751-47a2-9481-9370f0453fb0","year":2013},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.654927Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:1ab6a580e500f8fd3e7d173d7be048dfe59e0c6e54494e0ad37a35903f19e55e","observation_id":"771e6df6-eb84-405d-b2cf-c26cb06abc3e","resolution":{"observed_at":"2026-08-05T12:03:53.130814Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:52.847327Z","title":", author D'Ariano, A","venue":null,"work_id":"8f6ec4c0-439a-4b77-b831-46155f59db4c","year":2021},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.760274Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:9222ed488c43f23e09d8e57ca7f082415838eccadb14cc442b6ff880f366ddd5","observation_id":"2bd0d612-93da-4464-a4f0-8523cc692620","resolution":{"observed_at":"2026-08-05T12:03:52.969006Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:52.679568Z","title":", author Jerosch, K","venue":null,"work_id":"8664e974-cba3-41d4-b720-eb236b211e17","year":2008},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.859194Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:0a15b6672865372f524b587d51f7576f837ecd9ab3db64100377c7b30c696743","observation_id":"65c89167-441d-4f24-8758-960b882ae91a","resolution":{"observed_at":"2026-08-05T12:03:52.724123Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:52.488355Z","title":"title Nederlandse Spoorwegen, 2023 Annual Report","venue":null,"work_id":"963f7252-b9fd-4581-a44d-6c3dc6fb48c5","year":2024},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:43.924683Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:aaec32dd87f9219305b1deb596439de1a649f3512f10400dc8cb848f4d76c8af","observation_id":"886932e9-569f-4e23-a00e-45105beca94c","resolution":{"observed_at":"2026-08-05T12:03:52.563444Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:52.301134Z","title":", author Nie, L","venue":null,"work_id":"1942c325-e924-4bc4-9e22-11e409fe4c3a","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.027857Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:12383b82979d576107813f4af1ab9368d8f6885b68aae60da0a0bd7403cbc66a","observation_id":"3076a332-445a-46de-bb76-440194d16550","resolution":{"observed_at":"2026-08-05T12:03:52.374994Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:52.077884Z","title":", author Peng, Q","venue":null,"work_id":"f1926483-692b-46f1-a698-7c2aa8715896","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":28,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.149000Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:7474ed2f368f2b9c849d2bc031eb36e37d01e6570b5bf89394c1bedbf8ecad4c","observation_id":"6227d3f5-71d1-4854-a03e-a9d472697133","resolution":{"observed_at":"2026-08-05T12:03:52.195915Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:51.838131Z","title":", author Tr \\'e panier, M","venue":null,"work_id":"79e7fe88-2529-4863-af55-d7448089c43e","year":2011},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":29,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.277039Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:a95cd98a33d2890a5948e961c0554623772b0e24f92ce372297b372b06a23fc2","observation_id":"caf27f1b-c146-4884-985a-15e647c05793","resolution":{"observed_at":"2026-08-05T12:03:51.969840Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:51.646485Z","title":", author Cacchiani, V","venue":null,"work_id":"22aea9b2-c78f-4fea-a066-457553841396","year":2021},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":30,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.338555Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:2859a5dbe5e09d58bcac85f4f31b9752a255bdb26774e08d6900b88743f56ce2","observation_id":"c7e32f7b-d156-4972-bc02-ec1426fbbd21","resolution":{"observed_at":"2026-08-05T12:03:51.740966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:51.479494Z","title":", author Wang, Z","venue":null,"work_id":"b2dc3175-fa64-4cc6-b16a-1f2dd2d0121c","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":31,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.456106Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:b11b4f5cc2aad0cf7d6b4f4ff86e121b5cbbcb31582df4599925e90d4bf4b707","observation_id":"89023ff9-d3c8-4750-99c7-e5a65d72f905","resolution":{"observed_at":"2026-08-05T12:03:51.527615Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:51.313683Z","title":", author Ahmadi Digehsara, A","venue":null,"work_id":"2b7b1058-102d-4a6b-bb3d-4ebbb0fce0fe","year":2020},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":32,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.515576Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:fde1ed6176b10c3fc75e46c0f3b7e376c8c1105bf1bff4485522605e1501a4a3","observation_id":"63243fea-4292-4b17-a500-96daf0073523","resolution":{"observed_at":"2026-08-05T12:03:51.389227Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:51.128639Z","title":", author Sch \\\"o bel, A","venue":null,"work_id":"250c0978-6d55-43c4-9a39-4a7e466b3115","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":33,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.654524Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:17090860499e10763db7c683d70f6a9ae38ba2c6cf7d57d8ea3bf330ebbaf375","observation_id":"3dccd96a-25bf-41a0-ac99-17271da33caf","resolution":{"observed_at":"2026-08-05T12:03:51.217845Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:50.959061Z","title":", year 2012","venue":null,"work_id":"f3379ba9-8bbf-480b-b54b-b8e8d1e05bca","year":2012},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":34,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.821777Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:c329cfa5783071b1a3618aa17c817fdee7071b25e30a0c6cffc50dfc05bd886e","observation_id":"da432e2b-8f85-454b-bc8d-e94c4a73591f","resolution":{"observed_at":"2026-08-05T12:03:51.039826Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:50.737846Z","title":", author Scholl, S","venue":null,"work_id":"020a1c6f-eefe-4d33-9cf8-2d2644cc23d8","year":2005},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":35,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:44.927345Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:b1b317d6d095f41162836faffd13f4e0f5f83318b1c4888d975e407aceccf157","observation_id":"e2b85c5d-e2a2-4f7b-877f-0101627889fb","resolution":{"observed_at":"2026-08-05T12:03:50.843484Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:50.462898Z","title":", author Yang, J","venue":null,"work_id":"9ebdb426-165c-495c-a9c0-05fa195deb4f","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":36,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.039765Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:5c09210bb64157207b8d51764759ce80ade98e34ff7b39efc10c742aafa4351b","observation_id":"75b43410-5138-4006-9c61-5a42b4d5a46c","resolution":{"observed_at":"2026-08-05T12:03:50.575389Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:50.207082Z","title":", year 2020","venue":null,"work_id":"022789e4-b532-4ae2-bacd-9ef8535bf7fc","year":2020},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":37,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.132688Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:dcf7ba60616ebf7195152e46441cee7822659889b7ce4e31504ade84f64b66fd","observation_id":"f2bba0ed-5b0d-4a66-a097-6d68ced1b122","resolution":{"observed_at":"2026-08-05T12:03:50.326665Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:49.967526Z","title":", author Hassard, R","venue":null,"work_id":"20b81422-fe85-45b4-8692-1755a39203dc","year":1973},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":38,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.259787Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:ac87733966ea97f75fce4be2731c2f24ed43a0328bff61e2fc6f7b9811d47323","observation_id":"146292ee-16a1-4343-856d-f70f7c0bfbba","resolution":{"observed_at":"2026-08-05T12:03:50.095030Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:49.773188Z","title":", author De Bruyn, M","venue":null,"work_id":"d8b15b85-e4f5-44f1-be32-6c1d98cbcd85","year":2024},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":39,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.401462Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:9fcf69abb0d1ae086094711758f331137a093a3ad59739643ba818801f960297","observation_id":"14b8e5dc-2760-4074-a83f-3052227f112d","resolution":{"observed_at":"2026-08-05T12:03:49.847299Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:49.536163Z","title":", year 2011","venue":null,"work_id":"ba78b93e-e0cc-4291-a95a-b2dece2732e5","year":2011},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":40,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.527314Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:df27857a2c0662f1d656ebf6779f716bb28e38afa286696f76dc86b4b455a973","observation_id":"f9498953-f5be-4c37-a789-24c92a6c0364","resolution":{"observed_at":"2026-08-05T12:03:49.654276Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:49.325980Z","title":", author Boterman, J.W","venue":null,"work_id":"fb137ae1-067b-44d1-bcf5-431281fbf883","year":2012},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":41,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.625374Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:747e494cf2ce0fc795a3c7df4f0458db82c2bd143d46438bf068f774aa19d08e","observation_id":"144bf054-b855-4e44-baaf-f359f1520e08","resolution":{"observed_at":"2026-08-05T12:03:49.423326Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:49.137802Z","title":", author Brands, T","venue":null,"work_id":"2b726f63-c940-4f4e-856a-6507b1a78561","year":2015},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":42,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.745420Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:b6f1c4bcd9bf353f1dcc263d2b58a1ac5feba27f5a1484ca4f5af59baff28be4","observation_id":"b5a96919-fa90-465e-8d7f-bb31af870147","resolution":{"observed_at":"2026-08-05T12:03:49.224767Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:48.911839Z","title":", year 2012","venue":null,"work_id":"cf25bdb1-fe2a-49ab-9f18-349bfebfcb49","year":2012},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":43,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.886874Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:c260ef5432ad7146163e39652b6ca245f0ee946b2c241fefedbfa70b2a5366b3","observation_id":"dd31452d-0d38-466e-a802-7f371c2f38b9","resolution":{"observed_at":"2026-08-05T12:03:49.009419Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:48.764214Z","title":", author Shires, J","venue":null,"work_id":"a8925bfd-7df7-4fad-b8d2-04bc8d7210f8","year":2004},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":44,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:45.986338Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:e91ceca540f83a5a86bdced7695c102466a3fb4e84cc83edcf37346bd441384e","observation_id":"868eafce-4c95-4ad6-b363-4e9a9dd8aa21","resolution":{"observed_at":"2026-08-05T12:03:48.851686Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:48.543590Z","title":", author Be s inovi \\'c , N","venue":null,"work_id":"a540d98f-d861-41af-acdd-ea1d78e8e5c5","year":2019},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":45,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.120946Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:7e73135304fa0afdfe3462760ba6ffbca8b019b37b39778919fd0bb8ba8b44a4","observation_id":"17c2e3a7-a80a-4e32-a7c1-5c6938bd76f3","resolution":{"observed_at":"2026-08-05T12:03:48.650115Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:48.354978Z","title":", author Li, D","venue":null,"work_id":"41536d49-bdd9-4559-9efc-d2e0742559c1","year":2024},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":46,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.252661Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:f078e01a2f8ae175149571b3dfc3450d4053a16bac1c87367a861f330acccd79","observation_id":"9e405f1e-c287-416e-9357-2656f4cec83a","resolution":{"observed_at":"2026-08-05T12:03:48.460288Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:48.141849Z","title":", author Gao, Y","venue":null,"work_id":"e8660988-0ccd-4195-bb4f-b7f0f128338b","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":47,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.363723Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:b295b8ba5cc1bc62f98806d38e6f4efee8646364a1891a638b5de4e6b5792c5c","observation_id":"156db3b8-4182-4f7a-81c2-70393c51cd79","resolution":{"observed_at":"2026-08-05T12:03:48.231065Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:47.970473Z","title":", author Nie, L","venue":null,"work_id":"796e0548-9ab2-46d6-bd88-9b184733bb09","year":2020},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":48,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.487752Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:7d43fbeda60df8aa1cd8fcef97096047009455d71ddfe1afa701bb4541d2d3e1","observation_id":"c5058412-93e0-4025-84d7-52f44ebe56f9","resolution":{"observed_at":"2026-08-05T12:03:48.041327Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:47.735276Z","title":", author Chen, J","venue":null,"work_id":"ef43838e-a8cf-448f-bf9d-40990a714d15","year":2022},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":49,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.623728Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:0786c5322de6602bfd2018f5f3e1d53f3c20fd2955ce2b751d25b2fe2536c2b7","observation_id":"a2b0ae81-f77b-4a85-a0d1-b92e0712ed4d","resolution":{"observed_at":"2026-08-05T12:03:47.864503Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:47.490271Z","title":", author Yang, H","venue":null,"work_id":"d5346d4d-4c0a-42ca-bc30-1457473d6e48","year":2021},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":50,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.763323Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:11c239130b0e9e2a39e8379ed252088da3e574f5bcb10a9355997a00ba8d135e","observation_id":"f1f7906a-ba79-410f-b7a7-2b2ddd207ed0","resolution":{"observed_at":"2026-08-05T12:03:47.614398Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:47.346441Z","title":", author Huang, Y","venue":null,"work_id":"d45d86af-5a3a-4b1e-a355-92faba79b207","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":51,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:46.860174Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:4ec978d85c84fb1e7728de745ff5a20e8129f97c6670a335ff492de2a66ab1f6","observation_id":"98cc7684-f0be-454d-9a4f-7a9a5672b6de","resolution":{"observed_at":"2026-08-05T12:03:47.394670Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T12:03:47.156982Z","title":", author Li, X","venue":null,"work_id":"18b642ba-5e7b-4c82-b1a6-7826f013b4f9","year":2023},"citing_paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines","version":1},"reference_index":52,"source":"arxiv_source","source_observed_at":"2026-08-05T12:03:47.001943Z"},"links":{"citing_paper":"/paper/2509.02052"},"observation_digest":"sha256:49f9d34790d1a49611cb4419b58b46d8d671aa33471e7fd033de34e19b27aef0","observation_id":"741a2523-2662-4256-86db-47ecaae33b44","resolution":{"observed_at":"2026-08-05T12:03:47.245029Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2509.02052","last_updated":"2025-09-02T07:46:00Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-13T11:21:04.408090Z","submitted_at":"2025-09-02T07:46:00Z","title":"Multi-period line planning for varying railway passenger demand with asymmetric lines"},"reference_resolution":{"displayed":52,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":52},"total_outbound_references":52},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"thesis":"As of 24 August 2026, this Paper Citation Record lists 52 of 52 outbound references and 1 inbound Pith citation observation for arXiv:2509.02052."}