{"as_of":"2026-08-05T00:29:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:b0999eaed0e4db4019d8d89618d4992da8a711e32b3181220648b57555a29c1e","coverage":[{"denominator":186,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":100,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-04T22:40:48.409900Z","state":"measured"},{"denominator":129,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":129,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-04T06:34:03.388597+00:00","state":"measured"},{"denominator":29,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":29,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-03T16:28:28.124147Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-07-10T12:15:01.137692Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-03T04:26:55.805576Z","title":"Electricity demand and grid impacts of ai data centers: Challenges and prospects,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2602.05116","last_updated":"2026-07-22T03:09:09Z","snapshot_observed_at":"2026-08-03T04:26:55.146913Z","submitted_at":"2026-02-04T23:04:33Z","title":"GPU-to-Grid: Voltage Regulation via GPU Utilization Control","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-03T04:26:55.805576Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2602.05116"},"observation_digest":"sha256:384db8fd8e24fe2239b8710e01168bc5bf8ccdf3bf9c4066c5988f82b99bc418","observation_id":"a3c09d89-95b8-4a48-9f36-60b03c8ad7fd","resolution":{"observed_at":"2026-08-03T04:26:55.805576Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2602.10900","last_updated":"2026-04-20T19:03:11Z","snapshot_observed_at":"2026-08-04T19:34:29.285181Z","submitted_at":"2026-02-11T14:28:04Z","title":"AI Infrastructure Sovereignty","version":4},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-05-16T03:02:37.251469Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2602.10900"},"observation_digest":"sha256:4adf2b40688173ae9eb8b258e2db0160edcac313683bc73f3ec634af71045324","observation_id":"047210e8-bb40-4b76-b6aa-4a83f670dd14","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2603.00415","last_updated":"2026-05-05T13:10:08Z","snapshot_observed_at":"2026-07-06T22:47:24.369805Z","submitted_at":"2026-02-28T02:30:56Z","title":"Grid Integration of AI Data Centers: A Critical Review of Energy Storage Solutions","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-15T18:56:33.224016Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2603.00415"},"observation_digest":"sha256:13f5187d655f056d335ca2dbe387ebdd46da9e6fa21cc32bba3315ba12dcf1af","observation_id":"36eb689a-af29-42e1-8876-56fea14e4bbe","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2604.06198","last_updated":"2026-03-13T01:37:09Z","snapshot_observed_at":"2026-07-06T22:54:44.656835Z","submitted_at":"2026-03-13T01:37:09Z","title":"Concentrated siting of AI data centers drives regional power-system stress under rising global compute demand","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-05-15T12:32:10.759391Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2604.06198"},"observation_digest":"sha256:6f2500bdeb591c94a94e84de1266b2e0703ddccd68951f117ef7ceb3446ea18b","observation_id":"c2fb0aae-2193-46a5-b22f-004539f21244","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2604.07345","last_updated":"2026-04-08T17:56:41Z","snapshot_observed_at":"2026-07-06T22:55:37.787732Z","submitted_at":"2026-04-08T17:56:41Z","title":"Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-10T17:23:15.999195Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2604.07345"},"observation_digest":"sha256:6a9d89720c73e8a173b365663f26f861b0db1ab5ca6e1e7504ac190f6e9330d3","observation_id":"4a030242-ecbd-4ad6-bc9f-fc548df75172","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2604.19933","last_updated":"2026-04-21T19:21:25Z","snapshot_observed_at":"2026-07-06T23:06:31.110859Z","submitted_at":"2026-04-21T19:21:25Z","title":"Cross-Atlantic Research Agenda for Scalable Grid Architectures and Distributed Flexibility","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-05-10T01:19:11.099383Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2604.19933"},"observation_digest":"sha256:face50bd2c7be83ece341b50d4f7d0aedcbf6a4513443a470fe741e71bfbaec4","observation_id":"0f960f48-5235-4d90-8213-77d7a7666db2","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2604.21072","last_updated":"2026-05-05T16:09:43Z","snapshot_observed_at":"2026-07-06T23:07:41.856444Z","submitted_at":"2026-04-22T20:36:47Z","title":"Distributed Generative Inference of LLM at Internet Scales with Multi-Dimensional Communication Optimization","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-09T23:01:56.712670Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2604.21072"},"observation_digest":"sha256:b6fb73abfd0dedc6f2aa9c7e402271f00845bce0f46937165b312014bb58ea16","observation_id":"07a89280-0175-4576-b32c-ad29fecf4af8","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2604.27207","last_updated":"2026-04-29T21:25:47Z","snapshot_observed_at":"2026-07-06T23:12:43.284564Z","submitted_at":"2026-04-29T21:25:47Z","title":"Regime-Adaptive Weighted Ensemble Learning for Computing-Driven Dynamic Load Forecasting in AI Data Centers","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-05-07T08:19:25.041670Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2604.27207"},"observation_digest":"sha256:bdd3a34d53df0f383b6f6947e4129ca72b8947db999c8cf3942ae2a132cc890d","observation_id":"adbd1682-d0b5-4e6a-bc7e-c737db013476","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.00681","last_updated":"2026-05-01T14:12:28Z","snapshot_observed_at":"2026-07-06T23:14:01.852096Z","submitted_at":"2026-05-01T14:12:28Z","title":"Deployment-Efficient Short-Term Load Forecasting in AI Data Centers via Sequence-to-Point Knowledge Distillation","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-09T19:29:50.226886Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.00681"},"observation_digest":"sha256:d3aca39c9d793f8e898a9ee3093caaf1dce369b1d232cbae931b107e72d2fd24","observation_id":"ce79cb00-a682-4e2d-8ea1-c455ba61f288","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.00769","last_updated":"2026-05-01T16:31:38Z","snapshot_observed_at":"2026-07-06T23:14:06.327027Z","submitted_at":"2026-05-01T16:31:38Z","title":"Voltage Ride-Through in Large Loads- A Dual PQ Approach","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-09T19:08:31.562833Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.00769"},"observation_digest":"sha256:933b33e83d60077bc1cb963492af856a28b8339d6f91a027304d40c31bb92840","observation_id":"7d3aaaad-9dc2-417f-b767-628760f69335","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.05519","last_updated":"2026-05-06T23:36:16Z","snapshot_observed_at":"2026-07-06T23:18:07.750358Z","submitted_at":"2026-05-06T23:36:16Z","title":"OpenG2G: A Simulation Platform for AI Datacenter-Grid Runtime Coordination","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-08T16:27:25.980456Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.05519"},"observation_digest":"sha256:54644b35563359e957de84ebdedc809a6ad277e533d854f2355230a2305dfc78","observation_id":"db70b024-ebeb-4af8-9c73-0d0fa4a21ed9","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.14105","last_updated":"2026-05-13T20:44:40Z","snapshot_observed_at":"2026-08-03T05:02:30.728161Z","submitted_at":"2026-05-13T20:44:40Z","title":"Battery-Assisted Operation of Hyperscale AI Data Centers under Connect-and-Manage Interconnection Practices","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-15T02:32:58.239747Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.14105"},"observation_digest":"sha256:0545a5306d31762a2f17bed919652e866db477b1c325fcf30cbe05e4ef3f504e","observation_id":"f2f6efbe-844a-407c-b9c5-efce0f952d23","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.14109","last_updated":"2026-05-13T20:48:47Z","snapshot_observed_at":"2026-07-06T23:25:34.835136Z","submitted_at":"2026-05-13T20:48:47Z","title":"Grid Integration of Gigawatt-Scale AI Data Centers under Connect-and-Manage","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-05-15T05:04:55.970241Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.14109"},"observation_digest":"sha256:c7b83ff9c933592ab96aaf3877378c88581cff1e1bf864301baf37a608a5fcb9","observation_id":"de14ea34-ab8e-4da1-9509-6f1e33763c07","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2605.23244","last_updated":"2026-05-22T05:25:00Z","snapshot_observed_at":"2026-08-01T14:10:27.190441Z","submitted_at":"2026-05-22T05:25:00Z","title":"Convex Optimization for Alignment and Preference Learning on a Single GPU","version":1},"reference_index":105,"source":"arxiv_source","source_observed_at":"2026-05-25T05:01:31.560963Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2605.23244"},"observation_digest":"sha256:d6c54380b6d47900a934f2521abc1601b128a5c7540ff637cff0115ce5cfdfae","observation_id":"2b2764a4-2b27-4931-9d12-4aa7093e9bde","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.00941","last_updated":"2026-05-31T00:56:10Z","snapshot_observed_at":"2026-08-04T07:31:43.403301Z","submitted_at":"2026-05-31T00:56:10Z","title":"Power Grid Infrastructure for AI Data Centers","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-06-28T17:04:05.563951Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.00941"},"observation_digest":"sha256:635d3db12297dc4e4a5f4b122d07101d3c09e40b488b9a40fb1fb51d6567057f","observation_id":"276d58a3-64c5-4392-b8bc-4218cff59b93","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.09617","last_updated":"2026-06-08T15:22:38Z","snapshot_observed_at":"2026-08-01T09:37:23.208109Z","submitted_at":"2026-06-08T15:22:38Z","title":"Powering the Future of AI: Navigating the Trade-offs for Europe's Energy Transition and Net-Zero Goals","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-06-27T15:31:40.570235Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.09617"},"observation_digest":"sha256:de53290c937e90ff47f85c7b82144cc22a0d42b6932e4ea4d4f5e928522fa132","observation_id":"8dc37ae7-69cd-434c-8c80-68868a1a10f9","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.10440","last_updated":"2026-06-09T05:36:31Z","snapshot_observed_at":"2026-08-02T18:16:53.172427Z","submitted_at":"2026-06-09T05:36:31Z","title":"ASTRA-sim 3.0: Next-Level Distributed Machine Learning Simulations via High-Fidelity GPU and Infrastructure Modeling","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-06-27T12:09:21.778176Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.10440"},"observation_digest":"sha256:3025bccb50f834b3e1b18588c6a75c72134207aa42740a34784579f54d40084d","observation_id":"5e745cdd-a87f-41f0-bc8f-0cc2854e8875","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.19262","last_updated":"2026-06-17T16:39:40Z","snapshot_observed_at":"2026-07-06T23:54:37.596257Z","submitted_at":"2026-06-17T16:39:40Z","title":"Detecting Hidden ML Training With Zero-Overhead Telemetry","version":1},"reference_index":46,"source":"arxiv_source","source_observed_at":"2026-06-26T21:03:43.112108Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.19262"},"observation_digest":"sha256:453d16f2380761d1af767e96d91fcb65133c8254e1944bbde6514df5f24107da","observation_id":"f30bf21f-2e02-429e-87b4-e4bcd4ccc366","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.21064","last_updated":"2026-06-19T03:29:10Z","snapshot_observed_at":"2026-07-06T23:56:07.147471Z","submitted_at":"2026-06-19T03:29:10Z","title":"AI Data Centers and Power System Sustainability: Understanding the Sustainability Implications of AI-Driven Data Centers on Power Systems","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-06-26T13:54:22.886754Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.21064"},"observation_digest":"sha256:14ea043772bf194a75ba5b969f832ea482b957da4e053e75f29ac4a5a634360c","observation_id":"1f4360d4-bac5-48ef-8011-596a0366ea34","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.21536","last_updated":"2026-06-19T15:35:31Z","snapshot_observed_at":"2026-07-06T23:56:31.454439Z","submitted_at":"2026-06-19T15:35:31Z","title":"Stability Enhancement of Centralized UPS Data Center Systems Under Weak-Grid Conditions","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-06-26T13:23:43.214436Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.21536"},"observation_digest":"sha256:a773a471bf11f06a3ac3a997f34bbab4b5de619e92e0dd12262b80d12593f23b","observation_id":"58210832-ec48-4f55-a166-cc5eb4f6730c","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.22590","last_updated":"2026-06-21T16:54:09Z","snapshot_observed_at":"2026-08-02T22:01:48.112655Z","submitted_at":"2026-06-21T16:54:09Z","title":"Dynamic Resilience Assessment of Power Systems With Data Center Load Events Using Physics-Informed Neural Networks","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-06-26T09:35:43.728077Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.22590"},"observation_digest":"sha256:968a806975844b109b770341eaf9fa93554fa5c59dff6b399cb4ea9a2f288fcb","observation_id":"93b9c82d-2bb2-4255-b5d2-56da4623dde2","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.25098","last_updated":"2026-06-23T19:13:19Z","snapshot_observed_at":"2026-08-02T22:17:26.350141Z","submitted_at":"2026-06-23T19:13:19Z","title":"Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-06-25T21:53:34.228563Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.25098"},"observation_digest":"sha256:e5e4248b2c9f740ac25084bb63187368103329b2d6e997f498f93e9edfec7ccd","observation_id":"4d9d4727-5e34-4ecc-9104-7ad88e315f38","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":"2509.07218","doi":"10.48550/arxiv.2509.07218","metadata_source":"arxiv_reference","pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":"4fba1b9c-f991-4f9c-9abd-ee32bdb7c0aa","year":2025},"citing_paper":{"arxiv_id":"2606.30206","last_updated":"2026-06-29T12:23:10Z","snapshot_observed_at":"2026-07-07T00:04:05.275293Z","submitted_at":"2026-06-29T12:23:10Z","title":"The Many-Body Problem of the Data Centre","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-06-30T06:23:01.459678Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2606.30206"},"observation_digest":"sha256:f7808fa7b4b060b27a9b29b8bc8b581e8f7f1727150d915dc5e8d98fb3cb6212","observation_id":"e13e85df-8227-4004-a0ff-224380bd206c","resolution":{"observed_at":"2026-07-07T01:15:57.572881Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-07-12T03:16:38.965369Z","title":"Electricity demand and grid impacts of AI data centers: Challenges and prospects,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.03324","last_updated":"2026-07-07T14:39:00Z","snapshot_observed_at":"2026-08-01T20:57:37.530921Z","submitted_at":"2026-07-03T13:41:00Z","title":"Hierarchical Multi-Agent Reinforcement Learning for Carbon-Aware AI Data Centers in Power Distribution Systems","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-07-12T03:16:38.965369Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.03324"},"observation_digest":"sha256:aa541ab25e25cd5dd0fc164bc9d3d907cd91fcb90bbc2e8d75f788d4b5a8a499","observation_id":"89aea528-f684-44b3-b83a-9dad48157f6d","resolution":{"observed_at":"2026-07-12T03:16:38.965369Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-01T18:12:45.152414Z","title":"Electricity demand and grid impacts of ai data centers: Challenges and prospects,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.17391","last_updated":"2026-07-19T19:43:35Z","snapshot_observed_at":"2026-08-03T07:14:33.722004Z","submitted_at":"2026-07-19T19:43:35Z","title":"A Phased Development Framework Enabling Islanded Operation of Sustainable AI Data Centers With Onsite Grid-Following and Grid-Forming Energy Architectures","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-01T18:12:45.152414Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.17391"},"observation_digest":"sha256:4363e0418a7b91ce7e5a2baabf6105bf7a022f107059d8f91eaae4c81e0d1430","observation_id":"39462b17-de6c-42fd-86d1-2c42861d7187","resolution":{"observed_at":"2026-08-01T18:12:45.152414Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-01T17:48:45.178671Z","title":"Available: https://arxiv.org/abs/2509.07218","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.17514","last_updated":"2026-07-20T03:38:36Z","snapshot_observed_at":"2026-08-01T17:48:43.884899Z","submitted_at":"2026-07-20T03:38:36Z","title":"A Predict-then-Schedule framework for Power Distribution Networks with AI Data Centers","version":1},"reference_index":2025,"source":"pdf_text","source_observed_at":"2026-08-01T17:48:45.178671Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.17514"},"observation_digest":"sha256:4b6decc7d75ac2ffe023de2ab3a2a2ce73e3821961ff5ac48cdf3446ffdac979","observation_id":"fb8f4686-4188-41cc-b252-9f3403c79501","resolution":{"observed_at":"2026-08-01T17:48:45.178671Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-01T10:40:29.264734Z","title":"Electricity demand and grid impacts of AI data centers: Challenges and prospects,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.20587","last_updated":"2026-07-22T13:58:17Z","snapshot_observed_at":"2026-08-01T10:40:28.202729Z","submitted_at":"2026-07-22T13:58:17Z","title":"SPECTRA: State-Space Exogenous Context and Temporal-Frequency Resolution Architecture for Probabilistic Energy Forecasting","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-01T10:40:29.264734Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.20587"},"observation_digest":"sha256:60f01e4a9739d47bef62ab48c69ccda08e22ee1bb72ecfe5fb5ac4e558d87214","observation_id":"c94b2966-5654-41f2-8429-407b4e2a4b15","resolution":{"observed_at":"2026-08-01T10:40:29.264734Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-03T01:36:51.553410Z","title":"Electricity demand and grid impacts of ai data centers: Challenges and prospects,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.28833","last_updated":"2026-07-30T20:53:59Z","snapshot_observed_at":"2026-08-05T00:15:08.871036Z","submitted_at":"2026-07-30T20:53:59Z","title":"Hidden Economic Consequences of Adapting to Fast Ramping Datacenter Loads","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-03T01:36:51.553410Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.28833"},"observation_digest":"sha256:bca935277738cce5f56bec072da447ebe15d02572c8adf4c18b37397ca44aa6b","observation_id":"827165a4-ef9e-46c9-b1fa-3efd75a45297","resolution":{"observed_at":"2026-08-03T01:36:51.553410Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2509.07218","snapshot_observed_at":"2026-08-03T16:28:28.124147Z","title":"arXiv preprint arXiv:2509.07218 , year=","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.28962","last_updated":"2026-07-31T02:31:37Z","snapshot_observed_at":"2026-08-05T00:15:33.531543Z","submitted_at":"2026-07-31T02:31:37Z","title":"A Configurable Thermal-Dynamic Model for AI Data Center Cooling Load Simulation","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-03T16:28:28.124147Z"},"links":{"cited_paper":"/paper/2509.07218","citing_paper":"/paper/2607.28962"},"observation_digest":"sha256:1f56405c66ffc2953611ac55c3cdc250ccfeedb8d1ee72b4ceb41f11deb661c1","observation_id":"2de1608f-788e-4ea9-89b1-8542e695a617","resolution":{"observed_at":"2026-08-03T16:28:28.124147Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2509.07218/citation-record","integrity":"/paper/2509.07218/integrity","json":"/paper/2509.07218/citation-record.json","paper":"/paper/2509.07218"},"outbound":[{"citation":{"cited_paper":{"arxiv_id":"2303.18223","last_updated":"2026-03-18T05:34:39Z","snapshot_observed_at":"2026-08-05T00:27:35.922648Z","submitted_at":"2023-03-31T17:28:46Z","title":"A Survey of Large Language Models","version":19},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2303.18223","snapshot_observed_at":"2026-08-04T22:40:47.927279Z","title":"A survey of large language models,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.927279Z"},"links":{"cited_paper":"/paper/2303.18223","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:e456794a5cb656a2fe17048d0e4d5a455d06b6a3ed449338a21d93f1741874ac","observation_id":"d628fa3d-dd6a-4b0a-9010-f33b884e2bf8","resolution":{"observed_at":"2026-08-04T22:40:47.927279Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2303.08774","last_updated":"2024-03-04T06:01:33Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2023-03-15T17:15:04Z","title":"GPT-4 Technical Report","version":6},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2303.08774","snapshot_observed_at":"2026-08-04T22:40:47.937335Z","title":"GPT-4 technical report,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.937335Z"},"links":{"cited_paper":"/paper/2303.08774","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:b2c55c251ea7c9b729ab69c83ae9197162f5c57562f86b4e5176eb85fbd00fcf","observation_id":"e322f6f9-e6c8-4a70-adf1-fcbdde05c717","resolution":{"observed_at":"2026-08-04T22:40:47.937335Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2302.13971","last_updated":"2023-02-27T17:11:15Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2023-02-27T17:11:15Z","title":"LLaMA: Open and Efficient Foundation Language Models","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2302.13971","snapshot_observed_at":"2026-08-04T22:40:47.942915Z","title":"LLaMA: Open and efficient foundation language models,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.942915Z"},"links":{"cited_paper":"/paper/2302.13971","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:56485a9b105412ab7dd8b0d7f9f4c0f8682d052d8e186ebbff840340a1cd6f8e","observation_id":"2279fb42-15b3-4901-8523-e69211f6a4bc","resolution":{"observed_at":"2026-08-04T22:40:47.942915Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2312.11805","last_updated":"2025-05-09T21:04:06Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2023-12-19T02:39:27Z","title":"Gemini: A Family of Highly Capable Multimodal Models","version":5},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2312.11805","snapshot_observed_at":"2026-08-04T22:40:47.948148Z","title":"Gemini: a family of highly capable multimodal models,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.948148Z"},"links":{"cited_paper":"/paper/2312.11805","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:8dd33e925add71d9844c8e49e7f33f40aad30286fb5b2b4c664e86b1f5d700fd","observation_id":"64c557ec-5d1f-419a-97f3-2f0938fa7a2b","resolution":{"observed_at":"2026-08-04T22:40:47.948148Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2104.10350","last_updated":"2021-04-23T14:26:29Z","snapshot_observed_at":"2026-07-06T11:02:18.405330Z","submitted_at":"2021-04-21T04:44:25Z","title":"Carbon Emissions and Large Neural Network Training","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2104.10350","snapshot_observed_at":"2026-08-04T22:40:47.953383Z","title":"Carbon emissions and large neural network training,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.953383Z"},"links":{"cited_paper":"/paper/2104.10350","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:6fd397c717c1bc0c46b142b21996ba1c36812f026e5a753d9f5b0bd2452e2847","observation_id":"643f8823-3d08-4957-89b2-fa0b04d0bf14","resolution":{"observed_at":"2026-08-04T22:40:47.953383Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.958678Z","title":"Artificial intelligence, real consequences: Confronting AI’s growing energy appetite,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.958678Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:96bc6e6144d665d67dffeb0865b315331695e54d4a04ee509a6f867da155d3eb","observation_id":"54e8fac5-9969-415a-82dd-fadf201c9f53","resolution":{"observed_at":"2026-08-04T22:40:47.958678Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.964002Z","title":"AI is pushing the world toward an energy crisis,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.964002Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:a6a5bbfd9f1ac1bd139515788987bfc80979ea28483d8ba964ff0174add16596","observation_id":"6e6b2863-9a34-41a6-aa7f-1b4e3f1cc238","resolution":{"observed_at":"2026-08-04T22:40:47.964002Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.968472Z","title":"Energy and AI,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.968472Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:a9d4c5ebe6939a5d771afd3ba54fdf63e056ad8665fcc65537ae42828b776cab","observation_id":"ba00ca7b-9c29-406e-aa4f-5710a59b21ee","resolution":{"observed_at":"2026-08-04T22:40:47.968472Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.973309Z","title":"NVIDIA A100 tensor core GPU: Performance and innovation,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.973309Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:54444d66e2aef42fb67fdca73eba643d3ce92cb66a779bf2fc1db35ab4b39a78","observation_id":"be02b6c4-45a0-4429-8f65-e0ea1f8b7e84","resolution":{"observed_at":"2026-08-04T22:40:47.973309Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.978052Z","title":"TPU v4: An optically reconfigurable supercomputer for machine learning with hardware sup- port for embeddings,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.978052Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:4172f21942cd533ef9cd85220846438dbf8466ea7d9c03af5461d0ecdbfaef15","observation_id":"1d37c041-9e7a-4279-8758-6ba5d5fd8f29","resolution":{"observed_at":"2026-08-04T22:40:47.978052Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.982963Z","title":"The AI disruption: Challenges and guidance for data center design,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.982963Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1e2b4f423c077cf4fa5950e3acd9a1552b93b1948e82d0ed34d1f3b68f866524","observation_id":"cdca1c52-07f1-48b1-bccb-146b545bcbc8","resolution":{"observed_at":"2026-08-04T22:40:47.982963Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.987683Z","title":"Datacenter anatomy part 1: Electrical systems,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.987683Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1f345c0f0f9f8b08e07599e393089696b88b8e135ce5d26d0ed6f37890f14f1d","observation_id":"37b8a668-7ee5-47b5-96b5-083205441958","resolution":{"observed_at":"2026-08-04T22:40:47.987683Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.992222Z","title":"Crusoe and tallgrass announce AI data center in wyoming,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.992222Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:83ad40a8b14e5721f0233a452a2db8e0eacd4151e1d5d8ff53a05537e88699e6","observation_id":"15d575e5-bc65-4d84-bd7e-0479a2ebe08c","resolution":{"observed_at":"2026-08-04T22:40:47.992222Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:47.997215Z","title":"Powering intelligence: Analyzing artificial intelligence and data center energy consumption,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:47.997215Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:251a9833f2231795818c3c0ce840a9dfd89195e827b431c873a200b7732418bc","observation_id":"52548ae5-6770-4d00-ba2b-a66c3d6bde49","resolution":{"observed_at":"2026-08-04T22:40:47.997215Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.002006Z","title":"Data center rack power costs: A condensed analysis,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.002006Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:3d6dc7cb7b323ff68ba1e4279bbcf3e4a03c8d7644b3d84044da908d53b821b3","observation_id":"cf5240cf-7424-4135-9acc-69e36869afde","resolution":{"observed_at":"2026-08-04T22:40:48.002006Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.007002Z","title":"The unseen AI disruptions for power grids: LLM-induced transients,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.007002Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7e525368acbe128b4fbf015642b9b21038cde59230fad6518064877ae6a5834e","observation_id":"473c1309-decc-4cb1-962d-8b7a3b430975","resolution":{"observed_at":"2026-08-04T22:40:48.007002Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2508.14318","last_updated":"2025-08-21T17:25:27Z","snapshot_observed_at":"2026-08-03T07:47:19.254404Z","submitted_at":"2025-08-20T00:04:06Z","title":"Power Stabilization for AI Training Datacenters","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2508.14318","snapshot_observed_at":"2026-08-04T22:40:48.022171Z","title":"Power stabilization for AI training datacenters,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.022171Z"},"links":{"cited_paper":"/paper/2508.14318","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:3a0daf1e9cb3ea4328069b18618a3bab204ca321cddfa45a74292a138610f6db","observation_id":"efee6e5b-26f6-469d-8b43-c440bfc34cd4","resolution":{"observed_at":"2026-08-04T22:40:48.022171Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.027104Z","title":"How AI compute loads are transforming dat- acenter infrastructure,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.027104Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:e4a71f64ce0d4d53412a891326e4532207e02525f683bebe933a7ad7e48f04ff","observation_id":"969dcfff-065f-4aa3-a11e-03ba0c46293e","resolution":{"observed_at":"2026-08-04T22:40:48.027104Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2502.01647","last_updated":"2025-02-06T23:55:34Z","snapshot_observed_at":"2026-08-02T12:33:18.283954Z","submitted_at":"2025-01-28T16:53:07Z","title":"AI Load Dynamics--A Power Electronics Perspective","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2502.01647","snapshot_observed_at":"2026-08-04T22:40:48.031885Z","title":"AI load dynamics – a power electronics perspective,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.031885Z"},"links":{"cited_paper":"/paper/2502.01647","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:eb4305ab4d5df514c13b2ddb7df472be7ccc682a6c768198dae3e4d4bdbf22cf","observation_id":"7251c665-863d-4c2a-b6f7-4fecbc0c917d","resolution":{"observed_at":"2026-08-04T22:40:48.031885Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.036743Z","title":"(2024, Dec.) AI needs so much power, it’s making yours worse","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.036743Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:0b68a9a275bd52528045ce0a49c4deb11bc0d89d758af66693166d2966d08606","observation_id":"0b81afba-7466-401f-9be0-1f89d995148c","resolution":{"observed_at":"2026-08-04T22:40:48.036743Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.041420Z","title":"Exploding AI power use: an opportunity to rethink grid planning and management,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.041420Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:2972cbd7aded1c70368663981f7f76e26627682eb8e437450dcf0e46900d359e","observation_id":"5fdc195c-109e-4e5d-8f91-cf037d5a02cb","resolution":{"observed_at":"2026-08-04T22:40:48.041420Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.046368Z","title":"AI’s power requirements under exponential growth: Extrapolating AI data center power demand and assessing its potential impact on U.S. competitiveness,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.046368Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:b03e0ba976dd86a9f5d24ca04b57f8d80fcc40ee2f3b2407af46819af103c5c3","observation_id":"2ef66b00-342d-4f11-82ad-8e9994efa7df","resolution":{"observed_at":"2026-08-04T22:40:48.046368Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.051708Z","title":"How data centers and the energy sector can sate AI’s hunger for power,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.051708Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7a9bf2706488d431b166b5fa08f564a0f60b6d4f1f2479121a548548ace17896","observation_id":"da580897-5a51-4ccf-95f3-cc49f1f16e8f","resolution":{"observed_at":"2026-08-04T22:40:48.051708Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.056196Z","title":"Generational growth: AI, data centers and the coming US power demand surge,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.056196Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:8ce33e2ba1831ad775edb492a11985ce829f1f1f844af2e74f77b96256747e04","observation_id":"9578215f-5152-4bc8-8e36-8c55c81af2e0","resolution":{"observed_at":"2026-08-04T22:40:48.056196Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.060991Z","title":"How hungry is AI? benchmarking energy, water, and carbon footprint of LLM inference,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.060991Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:da27afe20b0bb3f3e9fe8fbe13aa78b2c2c1e0518e686925a5f092b40f760541","observation_id":"cb811649-0403-4f92-8109-3dd2bf57f59d","resolution":{"observed_at":"2026-08-04T22:40:48.060991Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.065836Z","title":"GB200 hardware architecture-component supply chain & bom,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.065836Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1f2a5aa930eb545a3d8b6ccc7b0d29f1c0f9458ab7d850ffb450a7683ad3477e","observation_id":"a474f6da-f35e-49f5-8638-0a43abad9dcf","resolution":{"observed_at":"2026-08-04T22:40:48.065836Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.070516Z","title":"Cost-effective, energy-efficient, and scalable storage computing for large-scale AI applications,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.070516Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7fb46ba68bb0f331aac23f4000c525053fd6974cdf776b30cb5f7f1d29800b2d","observation_id":"d5f83eee-2963-490d-98a4-a7672c38284c","resolution":{"observed_at":"2026-08-04T22:40:48.070516Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.075160Z","title":"Lustre unveiled: Evolution, design, advancements, and current trends,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.075160Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:ad11cb3f1457bddf65e31ba9c9da82114de518c82cc60c34c3437233b69b51e5","observation_id":"223c3bc7-93f3-4149-bd72-4547310b8d5e","resolution":{"observed_at":"2026-08-04T22:40:48.075160Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.080184Z","title":"What is Amazon simple storage service (Amazon S3)?","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.080184Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:6e59bd3dfdba1c41fd06e510f7c92e4aa6326910ac423e2985d9af40f8d4f3c6","observation_id":"40ad2efc-389a-4c30-9334-4b3868ae94ca","resolution":{"observed_at":"2026-08-04T22:40:48.080184Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.084960Z","title":"NVIDIA NVLink high-speed GPU inter- connect,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.084960Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:dd09cae93191b45d8721d75be5e75aad1eb389e9f293513aca7c7091aa7891ac","observation_id":"0c6c1033-214c-4077-8ecd-3ca7de96b748","resolution":{"observed_at":"2026-08-04T22:40:48.084960Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.089597Z","title":"InfiniBand – high-performance in- terconnect technology,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.089597Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:985cc0693641debb657649e75ea375c969642b7668c50261645ce358e0a6f970","observation_id":"bc0dff55-0043-4bfa-920f-d899c44acefd","resolution":{"observed_at":"2026-08-04T22:40:48.089597Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.094260Z","title":"Opportunities and limitations of quality-of- service in message passing applications on adaptively routed dragonfly and fat tree networks,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.094260Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:4a6e7b37fdd788636d4f49919d7bede5a296ec782a6f613d6ed3d5c5e4c4576c","observation_id":"4f6dd080-d5c0-4131-a166-acb452bf0886","resolution":{"observed_at":"2026-08-04T22:40:48.094260Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.099970Z","title":"Dynamic model and converter-based emulator of a data center power distribution system,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.099970Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7f9b6f6ed1309d69fd738bb2055ca30f14850ec386abf380cd7e5be8f058b323","observation_id":"09cc270c-fa21-40ee-b405-1377b1801896","resolution":{"observed_at":"2026-08-04T22:40:48.099970Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.105015Z","title":"Data center energy systems: Current technology and future direction,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.105015Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:d38285f1f20362bd559833d2bcf8b3d23ef46defcae053224545bccdd8df0ddc","observation_id":"95c9cfb0-aae9-48cb-973a-c6c6e986e952","resolution":{"observed_at":"2026-08-04T22:40:48.105015Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.109346Z","title":"Review: uninterruptible power supply (UPS) system,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.109346Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7450bd3a9c8e8a409bf6f8848488a3560d08be4b8469591c0cd08b5198a317c8","observation_id":"9bfdb00a-58d4-4cdf-9a0d-09423fb24067","resolution":{"observed_at":"2026-08-04T22:40:48.109346Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.114113Z","title":"A comparative study of UPS batteries for data center applications,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.114113Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1d0695d13483dbb4d17a08b53e3269fdd901f6a45b1a1d1d5230b421c201b49a","observation_id":"3fc4ee51-77c5-4758-b40e-7f4191d667c3","resolution":{"observed_at":"2026-08-04T22:40:48.114113Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.118659Z","title":"Moving beyond diesel generators: Exploring renewable backup alternatives for data centers,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.118659Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:45e4d738bd882ffe872d42abbaee5d983111b695e9a103b50ef7619ca1bdc652","observation_id":"74eca774-9c45-4dac-8b62-ff2cc75ed2d1","resolution":{"observed_at":"2026-08-04T22:40:48.118659Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.122883Z","title":"Microsoft and caterpillar power data center for 48 hours using hydrogen fuel cells,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.122883Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:6de2a0707b43700aa3bd90df1162218801de1e9ea72662741d82f40d2e0a8a6d","observation_id":"3c7624b3-2df1-499d-9dec-a9ab56fa1abb","resolution":{"observed_at":"2026-08-04T22:40:48.122883Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.127151Z","title":"A survey on data center cooling systems: Technol- ogy, power consumption modeling and control strategy optimization,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.127151Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:dbc6c262ab47ed00818c5dd8b466d8143e295be23df61261ac912e1269c953a3","observation_id":"d021c8ef-c266-4e8f-8ea4-8c43233d4caa","resolution":{"observed_at":"2026-08-04T22:40:48.127151Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.131770Z","title":"A review of air conditioning energy performance in data centers,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.131770Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:d4a00b36fe78eac542acf0978436bdf4c77b656ff8c88adfa7498d61eaa44aea","observation_id":"7770c83b-cf4f-4bb7-8cbf-9e65acd4562d","resolution":{"observed_at":"2026-08-04T22:40:48.131770Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.136479Z","title":"Immersion cooling as the next technology for data center cooling: A review,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.136479Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:ae54b1d305a992242193b6ebc0d2b988251e6d5a5536d9d56ad238089100ee9d","observation_id":"03fc02f7-e013-4e1b-b68d-d7682816aaeb","resolution":{"observed_at":"2026-08-04T22:40:48.136479Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.140882Z","title":"Experimental evaluation of direct-to-chip cold plate liquid cooling for high-heat-density data centers,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.140882Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:3bb04f7f0a9b563bf953129a69ebbcaf6d538a2201c8aef9b43a8bcb884be53c","observation_id":"224cf202-8813-4bd3-9a81-b41687153a59","resolution":{"observed_at":"2026-08-04T22:40:48.140882Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.145252Z","title":"Thermodynamic analysis of hybrid cooling system integrated with waste heat reusing and peak load shifting for data center,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.145252Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:efd963083fe323d8144cf78e158b79b45a89d26956432d3f55708c3b590dcdfb","observation_id":"48afddfc-2702-46be-8115-e1068f28c57a","resolution":{"observed_at":"2026-08-04T22:40:48.145252Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1186/s42162-","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.848293Z","title":"Enough hot air: The role of immersion cooling,","venue":null,"work_id":"22e2efb8-02ec-4a5c-b73d-5799b3099580","year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.149888Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:ea37161ecaba0ec78d64c58e5bf653617afdedf04262c2b3d2754cbdd27c5e5f","observation_id":"b456660b-ab3f-4f61-98e2-4ad9158b6643","resolution":{"observed_at":"2026-08-04T22:40:48.853246Z","resolver_source":"doi_truncated","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.154133Z","title":"Liquid cooling of data centers: A necessity facing challenges,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.154133Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:844228d971c22c8f51b6aa091010ffaf76dc5d8001f44a755e014830b07d54cf","observation_id":"f713f2fb-ca50-4d6f-9126-3bfe5a4c385d","resolution":{"observed_at":"2026-08-04T22:40:48.154133Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.158679Z","title":"Power usage effectiveness anal- ysis of a liquid-pump-driven hybrid cooling system for data centers in subclimate zones,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.158679Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:064c40bcb740481fd90774c24b48cb1cb5e6216548af32083f9fca2b32dfc577","observation_id":"5be0511b-3841-40d3-9ba9-075bf3484683","resolution":{"observed_at":"2026-08-04T22:40:48.158679Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.162952Z","title":"Google data center pue performance,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.162952Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:547d1d7559b5e1700db1ee84dba1f5c3aacb2c97e5cd9f71a9b2e2936a640ef9","observation_id":"c34d3907-b8b0-4c58-ad38-2f3acb5cf0aa","resolution":{"observed_at":"2026-08-04T22:40:48.162952Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.167150Z","title":"Meta 2024 sustainability report,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.167150Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:8b49669167c3fc440952502112879569fd787c33bc8a73013e2b0d8ad9d56b86","observation_id":"e285bc2f-f4c1-48cc-8768-9e5dead3b307","resolution":{"observed_at":"2026-08-04T22:40:48.167150Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2412.19437","last_updated":"2025-02-18T17:26:38Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2024-12-27T04:03:16Z","title":"DeepSeek-V3 Technical Report","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2412.19437","snapshot_observed_at":"2026-08-04T22:40:48.171939Z","title":"DeepSeek-V3 technical report,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.171939Z"},"links":{"cited_paper":"/paper/2412.19437","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:c2c949563a23ec79fc732955d2592acab54e00f40fe2afad572b793c1a4aec01","observation_id":"e450ca6b-7c53-4ba4-b734-3ac873c1c780","resolution":{"observed_at":"2026-08-04T22:40:48.171939Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.176560Z","title":"Wikipedia,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.176560Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:23304cb76db3975853c30600c1a7fe7cb23d089468d1f4885d56d89db88ccfaf","observation_id":"31d9e6e0-9ea8-4914-afcb-8c8e384f0a83","resolution":{"observed_at":"2026-08-04T22:40:48.176560Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.180968Z","title":"Common crawl,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.180968Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:f8ae61cc61fad586a46aa56e8cf61b2bd51a891652afcfe2381ae0647755b175","observation_id":"a952b726-426f-4a6b-ad39-6b1520f127c1","resolution":{"observed_at":"2026-08-04T22:40:48.180968Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.185146Z","title":"Aligning books and movies: Towards story-like visual explanations by watching movies and reading books,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.185146Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:bfc37f1825a89c0fe46bce4a77e7039a013356fd0467ba01eaef047336647f1e","observation_id":"8c27949f-7d97-4910-a088-6a2af321fba2","resolution":{"observed_at":"2026-08-04T22:40:48.185146Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.189600Z","title":"Artificial intelligence engineering,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.189600Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1fd14ca8f69fe90a7f706f9af11f05ba3741c53e45d2f22997d7d75de370e4bf","observation_id":"1a88286c-9eda-465f-a61b-5af9ddfbd88b","resolution":{"observed_at":"2026-08-04T22:40:48.189600Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.193993Z","title":"Data-centric green AI an exploratory empirical study,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.193993Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1e165faea5a844af6388368e1dcbabea040473b457b7ded02fd142a5e5f54f3c","observation_id":"4193213c-d4c9-4b35-862e-cb56217643ec","resolution":{"observed_at":"2026-08-04T22:40:48.193993Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2209.05258","last_updated":"2022-09-12T14:00:41Z","snapshot_observed_at":"2026-07-06T13:51:12.442343Z","submitted_at":"2022-09-12T14:00:41Z","title":"On the Energy Consumption of Different Dataframe Processing Libraries -- An Exploratory Study","version":1},"cited_work":{"arxiv_id":"2209.05258","doi":null,"metadata_source":"pith","pith_arxiv_id":"2209.05258","snapshot_observed_at":"2026-08-04T22:40:49.140630Z","title":"On the Energy Consumption of Different Dataframe Processing Libraries -- An Exploratory Study","venue":"cs.SE","work_id":"60d4ef2a-c4a6-45aa-aaab-ef8afb87af20","year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.198537Z"},"links":{"cited_paper":"/paper/2209.05258","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:f8050bca596fb2be7a43964abfa70b9b74950dadf42af024d8e24abec9d97cd3","observation_id":"71f92257-6fa5-4dd2-a6e5-5b76f6c77256","resolution":{"observed_at":"2026-08-04T22:40:49.145813Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2412.08602","last_updated":"2024-12-20T16:46:20Z","snapshot_observed_at":"2026-07-06T20:05:28.003434Z","submitted_at":"2024-12-11T18:19:07Z","title":"Empirical Measurements of AI Training Power Demand on a GPU-Accelerated Node","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2412.08602","snapshot_observed_at":"2026-08-04T22:40:48.203198Z","title":"Empirical measurements of ai training power demand on a GPU-accelerated node,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.203198Z"},"links":{"cited_paper":"/paper/2412.08602","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:672b047f608d702ca5b04688310f3f402451c2d02c268ed95dcb59487d3f68df","observation_id":"a4c0e2d0-6301-40c4-bbdf-4b11bfe4e47e","resolution":{"observed_at":"2026-08-04T22:40:48.203198Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.208199Z","title":"Great power, great responsibility: Recommendations for reducing energy for training language models,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.208199Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1831c543c2559f95ecc11562a61a8d45b64bf6446135da146f7caa12ef1fd932","observation_id":"54f577bb-2e86-4dff-97c7-420e1004bb07","resolution":{"observed_at":"2026-08-04T22:40:48.208199Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.212772Z","title":"Fine- tuning large language models for specialized use cases,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.212772Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:60af9f589a7371e31aa9884956349407e9c4aca895b08598e62ed4b979d5ed11","observation_id":"54a565dd-9d6a-4b0f-8d85-59e1f8886ffa","resolution":{"observed_at":"2026-08-04T22:40:48.212772Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2311.10267","last_updated":"2024-10-16T17:22:54Z","snapshot_observed_at":"2026-07-06T16:48:52.656551Z","submitted_at":"2023-11-17T01:27:01Z","title":"Energy and Carbon Considerations of Fine-Tuning BERT","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2311.10267","snapshot_observed_at":"2026-08-04T22:40:48.217628Z","title":"Energy and carbon considerations of fine-tuning BERT,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.217628Z"},"links":{"cited_paper":"/paper/2311.10267","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:0c5669c62431bafe627156c40899d4b0a45530a95612e3a7643f52734a9434d7","observation_id":"ad0aed0c-14f2-4357-8d91-e304070bdfbd","resolution":{"observed_at":"2026-08-04T22:40:48.217628Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2309.13192","last_updated":"2024-02-29T18:27:47Z","snapshot_observed_at":"2026-07-06T16:22:38.571547Z","submitted_at":"2023-09-22T21:55:18Z","title":"Towards Green AI in Fine-tuning Large Language Models via Adaptive Backpropagation","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2309.13192","snapshot_observed_at":"2026-08-04T22:40:48.222766Z","title":"Towards green AI in fine- tuning large language models via adaptive backpropagation,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.222766Z"},"links":{"cited_paper":"/paper/2309.13192","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:acde59ba040d8531bd770f57d351cbda4945a4d10e8d0a91065a173307fcae41","observation_id":"51bf3c3f-cc27-48d7-b3a4-88c760666f41","resolution":{"observed_at":"2026-08-04T22:40:48.222766Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2501.15398","last_updated":"2025-03-14T12:22:12Z","snapshot_observed_at":"2026-08-01T17:56:12.415541Z","submitted_at":"2025-01-26T04:37:27Z","title":"How Green are Neural Language Models? Analyzing Energy Consumption in Text Summarization Fine-tuning","version":3},"cited_work":{"arxiv_id":"2501.15398","doi":null,"metadata_source":"pith","pith_arxiv_id":"2501.15398","snapshot_observed_at":"2026-08-04T22:40:49.074122Z","title":"How Green are Neural Language Models? Analyzing Energy Consumption in Text Summarization Fine-tuning","venue":"cs.CL","work_id":"1a827169-d33e-4801-88b2-b23ed5848336","year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.227906Z"},"links":{"cited_paper":"/paper/2501.15398","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:b95591afd5bcaaff02eadb557801ab5feef35d96859a888955a2ccc57f3a3218","observation_id":"df797af5-d785-4bd9-b090-12869ec2afb6","resolution":{"observed_at":"2026-08-04T22:40:49.079614Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.233131Z","title":"The carbon footprint of machine learning training will plateau, then shrink,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.233131Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:5f55468822b0338e7ae152e294f3393ac26da9d365914ecc15f96ddb5aac21a9","observation_id":"ab1cb57e-0ad9-45f4-bb46-02250ad03692","resolution":{"observed_at":"2026-08-04T22:40:48.233131Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.237520Z","title":"(2024) Search engines vs AI: Energy consumption compared","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.237520Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7237db55c83f2169e0c798f3aba55228bd10fda994a2617bd8721c49d8c4490b","observation_id":"b3eb2257-a91b-43e7-b109-3a2ed17e16ef","resolution":{"observed_at":"2026-08-04T22:40:48.237520Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.241899Z","title":"Power hungry processing: Watts driving the cost of AI deployment?","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.241899Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:779d6b7ee8169c9d54c8b4c0ce1fcd5474a2bfee4f9bc2eed8adb69efd87b2ef","observation_id":"95b942b7-bf5a-4cd0-b493-052c648a8880","resolution":{"observed_at":"2026-08-04T22:40:48.241899Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.246689Z","title":"FPGA vs. ASIC for low power applications,","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.246689Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:a9f4ea6988819732b39da1862953276f1710e7bea2789e687992f8fa02238b9c","observation_id":"b5ae195d-44da-43bd-9cac-a34c7aebfbbf","resolution":{"observed_at":"2026-08-04T22:40:48.246689Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.250925Z","title":"Learning both weights and connections for efficient neural network,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.250925Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:dec7812cf758b7ea427ae59ecf983bd9de2d65643b256b27336ff35c868c4a3b","observation_id":"0846b6f8-a1e9-48df-be90-b9700db6a7d2","resolution":{"observed_at":"2026-08-04T22:40:48.250925Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1907.05686","last_updated":"2020-11-09T10:11:15Z","snapshot_observed_at":"2026-08-05T00:00:17.747850Z","submitted_at":"2019-07-12T11:52:54Z","title":"And the Bit Goes Down: Revisiting the Quantization of Neural Networks","version":5},"cited_work":{"arxiv_id":"1907.05686","doi":null,"metadata_source":"pith","pith_arxiv_id":"1907.05686","snapshot_observed_at":"2026-08-04T22:40:49.053807Z","title":"And the Bit Goes Down: Revisiting the Quantization of Neural Networks","venue":"cs.CV","work_id":"98aa4eaf-85cd-4614-86a1-edbfb7116b85","year":2019},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.259757Z"},"links":{"cited_paper":"/paper/1907.05686","citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:3ba0b71033125bdc6a3d4436dd9085bdb2255bee16e19ff76725f3844383847a","observation_id":"5125e73e-7eed-4153-9fc9-343c640c1f2a","resolution":{"observed_at":"2026-08-04T22:40:49.058787Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.264529Z","title":"A survey on RAG meeting LLMs: Towards retrieval-augmented large language models,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.264529Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:cf0ef9972dc43976ee9aa3dd24bc2a807e475837727757ceed953f79f5dad828","observation_id":"e8322b95-cb21-4f19-a6ec-ac779c439d5c","resolution":{"observed_at":"2026-08-04T22:40:48.264529Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.268868Z","title":"Com- pute and energy consumption trends in deep learning inference,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.268868Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:406327fe5d5cc77d1ce25f3b6bd47f03d171c0156aa1b3872ad3c53e8ae67225","observation_id":"14186762-18a7-46b4-8606-0c6200c9dbe8","resolution":{"observed_at":"2026-08-04T22:40:48.268868Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.273313Z","title":"White paper: The power strain: Can the grid manage the data center boom?","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.273313Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:989c0c0c998df237b6c6b5756cdaa432b6b4163572c6656291bda4de52004227","observation_id":"e697fc02-259a-44ce-b2af-aadc541a06c8","resolution":{"observed_at":"2026-08-04T22:40:48.273313Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.277919Z","title":"Joint expansion planning for data centers and distribution networks based on conditional value-at-risk theory considering low carbon characteristics,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.277919Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:18de1ad6da44a15710ccd716f59e2a48a22beeb31225080a3a9b55c6af80aa86","observation_id":"5dddead1-d833-4556-b79c-a035aa9f5ba2","resolution":{"observed_at":"2026-08-04T22:40:48.277919Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.282897Z","title":"Integrated planning of internet data centers and battery energy storage systems in smart grids,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.282897Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:c0ddcd7ad5f8321a16fce5033bb4df95889d6b8ae01ac94d93eedb14cebca4c6","observation_id":"73ca682f-7907-4df2-a5d4-a071a0e86145","resolution":{"observed_at":"2026-08-04T22:40:48.282897Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.287354Z","title":"A framework for expansion planning of data centers in electricity and data networks under uncertainty,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.287354Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:c6cded0b909fa2589abf00c933f02b80403aaf6933c086397f7cfd925e9f15e0","observation_id":"d248ec1c-bbaf-4a5b-91be-cfee6691ff53","resolution":{"observed_at":"2026-08-04T22:40:48.287354Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.291823Z","title":"A multi-objective interval optimization approach to expansion planning of active distribution system with distributed internet data centers and renewable energy resources,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.291823Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:929d7bff9ed30f6c9972a7e5856f7c71d7508df728f21e8fc48c4f3196a1b1f0","observation_id":"90476f74-b987-4c26-a453-24eab2235de4","resolution":{"observed_at":"2026-08-04T22:40:48.291823Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.296240Z","title":"Amazon buys nuclear-powered data center from Talen","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.296240Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:4b654baea329b622e820ff509a2cd7d89752674694c361e66dbb36380f2d67d4","observation_id":"47fa9d13-e8f0-4592-b076-ac2ff7280bb9","resolution":{"observed_at":"2026-08-04T22:40:48.296240Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.300985Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.300985Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:b239860197c607484ee99e4397fe7dacefc2a17a75ae2177d9e816ccb91ac1f3","observation_id":"e28d675c-8ff7-4f49-b739-9d257e84c32e","resolution":{"observed_at":"2026-08-04T22:40:48.300985Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.305406Z","title":"Texas Senate Bill 6 (2025): Relating to planning for, interconnection and operation of, and costs of servicing certain electrical loads,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.305406Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1a61ea5b029925f5cb7f134c40d66ca18767250107ed999c09855be7daeebbef","observation_id":"8e379100-fab2-46e8-aeca-ac176c56bc66","resolution":{"observed_at":"2026-08-04T22:40:48.305406Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.309800Z","title":"Current power trends and implications for the data center industry,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.309800Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:a9d0750a11d0501b976f566b41a6493e1947be7bbd9c27f64278147648bb1cb9","observation_id":"3a2d8505-416a-4a26-be26-3404962a6ed3","resolution":{"observed_at":"2026-08-04T22:40:48.309800Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.313888Z","title":"Electricity rate designs for large loads: Evolving practices and opportunities,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.313888Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:bafdbd103a2026837ae4e9851b0636618c184bbbe4f469295c090d398107884e","observation_id":"748e7840-9255-423f-8c30-3460b5b4b4de","resolution":{"observed_at":"2026-08-04T22:40:48.313888Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.318496Z","title":"Win-win tariff design and commercial considerations for data centers and utilities,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.318496Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:ddce45836c3bc1362b65b76e0e69c9cf72be5817c3eba6b003d43f704a4bfaeb","observation_id":"090a78fd-c9ae-4d8e-a6fe-40f6584b80a9","resolution":{"observed_at":"2026-08-04T22:40:48.318496Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.322937Z","title":null,"venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":82,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.322937Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:d4dd325507e8af343ad9124bf94a233ac13b91b61bb8e1e86b7a74e9750c6f04","observation_id":"39b055ab-8699-49cb-bcbf-b77e9828236f","resolution":{"observed_at":"2026-08-04T22:40:48.322937Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.327374Z","title":"Short-Term Electricity-Load Forecasting by deep learning: A comprehensive survey,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":83,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.327374Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:f2da9c16143e99c829b6151ffbd30fd78515aff177d2e7e65d3959721643d935","observation_id":"d58288e3-7fcb-4f21-b8e2-79fa25f1eb4f","resolution":{"observed_at":"2026-08-04T22:40:48.327374Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.331889Z","title":"PJM capacity market auction results for 2026/2027 delivery year,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":84,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.331889Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:8c674c33cc5bd9e60130c783f22efe686eaf7fe3989b405d8c3e1bb93b375ab4","observation_id":"82a31ea3-b623-484c-8865-43f986f26340","resolution":{"observed_at":"2026-08-04T22:40:48.331889Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.336407Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":85,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.336407Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7b86915bd57ce0591e5b038070d1d92e7075173ae2754e70dc2b5ab0b2940e35","observation_id":"1f4ccaa5-4275-42ba-b4c6-888651bf4203","resolution":{"observed_at":"2026-08-04T22:40:48.336407Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.340980Z","title":"2025 power trends,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":86,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.340980Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:4ff3122a311ad7e0569403752d23be1ad42851abd3b787305bb05f158a7eed7b","observation_id":"0951e846-c724-4fc5-8bce-453e7ca332a3","resolution":{"observed_at":"2026-08-04T22:40:48.340980Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.345331Z","title":"Long-term system assessment 2024,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":87,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.345331Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:7897c9433d026b02f2cf0fcf1b57ec516e7fe1c8a2366d5df79bd9a8ff195376","observation_id":"c773aa6d-1641-4c7d-8fa6-9913cf8114b1","resolution":{"observed_at":"2026-08-04T22:40:48.345331Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.349589Z","title":"(2025, Jul.) Electric bills are rising in 13 states because of big tech’s energy hunger","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":88,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.349589Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:76e317b807c82f66ae016b1f227c7791da4063c60c5e5f2432351406d76d84fe","observation_id":"0bbcffe3-ddf9-4895-9740-a2be1db2adb4","resolution":{"observed_at":"2026-08-04T22:40:48.349589Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.358532Z","title":"Virginia data center study: Electric infrastructure and customer rate impacts,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":89,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.358532Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:2bf72d777f0fbb6bc277677e7c4014faf8b24bd691ae95cffbe0c29893aba8aa","observation_id":"7986769f-e96c-456d-8bdd-409722a8ab04","resolution":{"observed_at":"2026-08-04T22:40:48.358532Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.362881Z","title":"IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":90,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.362881Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:753e5d6fdfd4f454c0c82a997705a662d94f31c929cad13bff1479b1bd04b3d4","observation_id":"72de6a00-f4ad-43e8-9c43-a9413e9cb12e","resolution":{"observed_at":"2026-08-04T22:40:48.362881Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.354243Z","title":"Available: https://www.businessinsider.com/electric-bills- rise-13-states-because-big-tech-data-centers-2025-7","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":91,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.354243Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:0829340866e4835750283b200f4bc25cf0166866b5c3ddf0743827f1f00bdf03","observation_id":"08780e17-329a-4bac-9c31-4f541711f9bd","resolution":{"observed_at":"2026-08-04T22:40:48.354243Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.371549Z","title":"ERCOT large load loss/reduction events 2020– 2024,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":92,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.371549Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:d0341fcf3b2c971b3cbdd1774bda10b2420a96cbc1df43dbeeee6af3a14d3d27","observation_id":"38cc8d39-7717-4dca-bd29-d3ed7b08558a","resolution":{"observed_at":"2026-08-04T22:40:48.371549Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"calendar/0613202","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:49.028886Z","title":"Large electronic load (LEL) voltage ride-through overview,","venue":null,"work_id":"0141b5a5-07be-49aa-a6ef-5117bd28beb6","year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":93,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.375848Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:9b3eb02bc7c54ef51b9941d8c52cda97f491341b85e7d2b3a22c5cf4c3817efe","observation_id":"f90f1655-2c22-4b11-8b92-c18539ecb315","resolution":{"observed_at":"2026-08-04T22:40:49.037427Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-04T06:34:03.388597+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.367110Z","title":"Understanding the inception of 14.7 Hz oscillations emerging from a data center,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":94,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.367110Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:2cd55d7984989ad4a25a91e5212d5235543a03b607bd2faf57f3715c45719cd1","observation_id":"db030c58-e1ba-4170-b685-77b19e0d0a4f","resolution":{"observed_at":"2026-08-04T22:40:48.367110Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.384399Z","title":"Kundur,Power System Stability and Control","venue":null,"work_id":null,"year":1994},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":95,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.384399Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:ddc63606b64a14764bcf1d6363b9b7071fd3442e92dec579962872eb8a9e9635","observation_id":"8349af7a-4e1f-4681-9be1-e8599bd2498e","resolution":{"observed_at":"2026-08-04T22:40:48.384399Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.388957Z","title":"Impact of low rotational inertia on power system stability and operation,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":96,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.388957Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:1e1608779e3c973bf0dfc30ae9807c1b57d886de713ad665a7da2ef9ff3d9004","observation_id":"a1cfdc05-679b-4f22-b2ce-dfbea74819b2","resolution":{"observed_at":"2026-08-04T22:40:48.388957Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.380074Z","title":"Large load survey and request for information of voltage ride-through capabilities to ensure reliable interconnection and operation of large electronic loads,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":97,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.380074Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:e376d34b1f14cabf9d5f2fdb59feea27df2d71b73f3f96a1a86e4a03c62b547c","observation_id":"a2bedc53-0c4e-4ff5-aa60-9ef17721b363","resolution":{"observed_at":"2026-08-04T22:40:48.380074Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.397209Z","title":"Power system stability with power-electronic converter interfaced renewable power generation: Present issues and future trends,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":98,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.397209Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:b38e03afdc9004514fe51f1722579a55cd7071ed4f51122362f6dbec898d570c","observation_id":"3226de79-2d4d-490d-9876-a4df86ef33f4","resolution":{"observed_at":"2026-08-04T22:40:48.397209Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.401427Z","title":"Low-frequency input impedance modeling of single-phase pfc converters for data center power system stability studies,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":99,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.401427Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:8e1af961f3c29486fc71d7259adc58503f3315a72a9c81bf05ceb2ac2dcc5fd8","observation_id":"70b00b10-9df1-4c90-b6f2-a08a28ff0a5b","resolution":{"observed_at":"2026-08-04T22:40:48.401427Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.393227Z","title":null,"venue":null,"work_id":null,"year":2000},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":100,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.393227Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:572d07c72328d0824612a502c45d05d7dae70e195faa3c3fe7466e8865e29ebd","observation_id":"9e84c437-98b7-4850-ac96-b3da155dedcf","resolution":{"observed_at":"2026-08-04T22:40:48.393227Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T22:40:48.409900Z","title":"Data center power system harmonics: An overview of effects on data center efficiency and reliability,","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","version":5},"reference_index":101,"source":"pdf_text","source_observed_at":"2026-08-04T22:40:48.409900Z"},"links":{"citing_paper":"/paper/2509.07218"},"observation_digest":"sha256:02603105c16412b8d0f5517d8375ffe085b1701d13896222d9b9f3604eebb27a","observation_id":"01599a16-9137-4432-9b36-704d555b237d","resolution":{"observed_at":"2026-08-04T22:40:48.409900Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2509.07218","last_updated":"2026-07-02T18:35:48Z","latest_version":5,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-04T22:40:47.226932Z","submitted_at":"2025-09-08T20:55:54Z","title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects"},"reference_resolution":{"displayed":100,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":95,"verified_exact":4,"verified_fuzzy":0},"total_outbound_references":186},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-04T06:34:03.388597+00:00","source":"crossref"},{"observed_at":"2026-08-04T06:33:57.428241+00:00","source":"retraction_watch"}],"thesis":"As of 5 August 2026, this Paper Citation Record lists 100 of 186 outbound references and 29 inbound Pith citation observations for arXiv:2509.07218."}