{"as_of":"2026-08-11T07:27:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:7d64e133ca16c11f90e254cff8598880349b0b2a71817283bc3c7b28dac03d45","coverage":[{"denominator":73,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":73,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-04T12:39:06.929533Z","state":"measured"},{"denominator":74,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":74,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-11T06:34:44.6726+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-05-25T05:26:41.313475Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-05-25T05:30:23.182330Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"cited_work":{"arxiv_id":"2510.03381","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2510.03381","snapshot_observed_at":"2026-06-08T02:03:45.837880Z","title":"Cross- modal reconstruction pretraining for ramp flow prediction at highway interchanges","venue":null,"work_id":"b96ccc17-e893-40a2-8874-4cf1f3a9892e","year":2025},"citing_paper":{"arxiv_id":"2605.23042","last_updated":"2026-05-21T21:16:15Z","snapshot_observed_at":"2026-08-06T15:52:00.852902Z","submitted_at":"2026-05-21T21:16:15Z","title":"Open-Source METANET Calibration for Reproducible Freeway Traffic Macroscopic Simulation","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-25T05:26:41.313475Z"},"links":{"cited_paper":"/paper/2510.03381","citing_paper":"/paper/2605.23042"},"observation_digest":"sha256:c2d7f49e066d32031b9f0f199095ff8d8d183a495ed1c70b53fd7ffc4feedd86","observation_id":"503be06d-c952-4cfa-a8bd-4b3e3def18df","resolution":{"observed_at":"2026-06-08T02:03:45.837880Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2510.03381/citation-record","integrity":"/paper/2510.03381/integrity","json":"/paper/2510.03381/citation-record.json","paper":"/paper/2510.03381"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:58.749647Z","title":null,"venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:58.749647Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:973ee14af20ee5bcab822bd0f313ce4d3027480e5d48bc26392a7c45337ba7e9","observation_id":"8172e9e1-4b47-419a-b8c8-ece395338ea5","resolution":{"observed_at":"2026-08-04T12:38:58.749647Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:58.852108Z","title":null,"venue":null,"work_id":null,"year":2000},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:58.852108Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:3bdec408b014d4cd461c5b399a11c2f16082993b2d8aa3ccde20de1359305e68","observation_id":"a561db1d-1e35-4df5-9ba4-b386b87b5f57","resolution":{"observed_at":"2026-08-04T12:38:58.852108Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:58.959409Z","title":null,"venue":null,"work_id":null,"year":1999},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:58.959409Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:eac5ed6c7f16dd9a5e31225935d76b2e112b11daeea42f425e532454dcea6b84","observation_id":"8fc68332-8917-44db-b016-ba5e56860144","resolution":{"observed_at":"2026-08-04T12:38:58.959409Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.144130Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.144130Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:108db8fbb6cfa6b96da5568078657739baa9d0ef28f5724b193e627a88825765","observation_id":"712bc9a9-e07e-4005-b272-7f6082383333","resolution":{"observed_at":"2026-08-04T12:38:59.144130Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.224081Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.224081Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:496f4ff8050168f539e55aebc8fca9f010a84dbff28a8cb4ed1cac2b880be5ff","observation_id":"2740f124-c608-410f-a21a-1de9ab315deb","resolution":{"observed_at":"2026-08-04T12:38:59.224081Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.281094Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.281094Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:adff3ba3f88e5d08ac22d1fdde4bfb326fb67f4ab7ddf4ecb9c97f2d16228a4c","observation_id":"c5597de4-4d84-4ebf-aeb5-07289da97a9e","resolution":{"observed_at":"2026-08-04T12:38:59.281094Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.385546Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.385546Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:0847158e8b86af48582c42a17a0b355520c96ede762cf55a1e5274d93ae8a1fc","observation_id":"6db6d4c6-889a-4b28-bb39-402aabac6035","resolution":{"observed_at":"2026-08-04T12:38:59.385546Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.461628Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.461628Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:37af11af0e7bbcbe971bbff72394d7f31d2d515828d6798df5271c7e86db786e","observation_id":"76c07c89-ce11-42f8-a3b5-86c8d5dba534","resolution":{"observed_at":"2026-08-04T12:38:59.461628Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.542759Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.542759Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:298cdc09d6b5a168933418c759f0e8eb9d9298a38c1d18522864fae85f82a87d","observation_id":"f5b4dc40-024d-4e1f-840a-492ff18dd8c7","resolution":{"observed_at":"2026-08-04T12:38:59.542759Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.639149Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.639149Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:898f72b62d0fb8603b77313f86e2d3a014b074117c29fb886db272b8cd418f41","observation_id":"46004f02-07d4-4995-8b54-ae887cdaa37d","resolution":{"observed_at":"2026-08-04T12:38:59.639149Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.739748Z","title":"Zhang, F","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.739748Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:9741f951888259385851fbe98144aa1d67a932cd2abb2b81eb0958dc93a6f6b4","observation_id":"4eedcdd2-6748-4868-86da-89f760c09960","resolution":{"observed_at":"2026-08-04T12:38:59.739748Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.845936Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.845936Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:3fc56894d22cc02dee7f9b799d71bd0214623c301adff8cd20aeceb4260f60bc","observation_id":"48227f09-25f9-4cfc-8e9d-0461e1e5012d","resolution":{"observed_at":"2026-08-04T12:38:59.845936Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:38:59.932722Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-04T12:38:59.932722Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:5346cf7576dec8f39f909925ec6f9cc9a9aed8ea783336f5f51c739d530684ab","observation_id":"f8d08f27-439c-44e5-ba99-34388915a5d7","resolution":{"observed_at":"2026-08-04T12:38:59.932722Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.042330Z","title":"Nohekhan, S","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.042330Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:5fceac508505fe020ee7dc26c1c9a92189eac3621bd7b72309b46f819f9f4c4c","observation_id":"93508420-ce45-4f9a-a3c4-fb97288da99d","resolution":{"observed_at":"2026-08-04T12:39:00.042330Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.199020Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.199020Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:75bc16ac63af3181efc8ce8348678ee7fa8e70450bbff01f2b61a73360d8bf69","observation_id":"3d6f4f8d-acbf-49b6-9d98-e738ac899da5","resolution":{"observed_at":"2026-08-04T12:39:00.199020Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.359351Z","title":"Marzano, A","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.359351Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:497fe024ff8aaad0ff9e5471d4426853b253d67753518ebc75ff57e256f823d1","observation_id":"af08d268-1576-4c9a-87d3-047e785d9810","resolution":{"observed_at":"2026-08-04T12:39:00.359351Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.518476Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.518476Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:8c6f2761c4d2e44594e6dc4bc866c316dcbe92b45b43ec58b643aef2b87db84b","observation_id":"505fc32f-c351-47f0-928e-22ecaeb29576","resolution":{"observed_at":"2026-08-04T12:39:00.518476Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.643330Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.643330Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:56bf0808d51c380af324102b243a144e360714778d935be11cd3aad93f44adde","observation_id":"fbab26b3-717d-4123-ba6d-e912a79e3b59","resolution":{"observed_at":"2026-08-04T12:39:00.643330Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.786450Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.786450Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:9ac010a3df2be0f823a585dc3899a4f6ca0bdb024a27fbb49031140f558f1f54","observation_id":"88343640-cb57-4442-a566-a04b70376cdd","resolution":{"observed_at":"2026-08-04T12:39:00.786450Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:00.961664Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:00.961664Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:c3e3952f4283c953539afc051371212ffc795eef49e56e38f331f6d7b15c9221","observation_id":"a61df164-25d4-4a4c-96a7-abef4b16c404","resolution":{"observed_at":"2026-08-04T12:39:00.961664Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.127169Z","title":"Tsung, C.-T","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.127169Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b65e01fe63b2f86f5ad4a3d04134255408d7bfde68506fde1d80b864a2a0a6af","observation_id":"693b404b-a2d4-41c8-a420-a5997b4a0183","resolution":{"observed_at":"2026-08-04T12:39:01.127169Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.242235Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.242235Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:9a372bd4703390eb1652bfec95a6b35ce84d54fed8bea65e820f08d888cba3de","observation_id":"bd2bcfe8-6f27-4e19-abff-cd4e2f0a67ea","resolution":{"observed_at":"2026-08-04T12:39:01.242235Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.386264Z","title":"Pospisil, J","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.386264Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:87e97dc62d3ed791b58d7e7c710c07381ec90dbb47d570a7ed4061f7ec02343c","observation_id":"4f4807ef-cff5-4c94-9f84-d9244fa3c626","resolution":{"observed_at":"2026-08-04T12:39:01.386264Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.520132Z","title":"Jiang, J","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.520132Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:487acf13172ce2404e1be539d3de33f178fe4507c6147722456f903db3317c8b","observation_id":"6a73c1c2-cd7b-418e-bead-231ba596916d","resolution":{"observed_at":"2026-08-04T12:39:01.520132Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.665094Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.665094Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:39ec3a612e9c09bc365b2c28bf48b1ab28c628ea46113ec50da21e683c224163","observation_id":"6f99e35d-9399-4463-af51-1964e47e26ce","resolution":{"observed_at":"2026-08-04T12:39:01.665094Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:01.819937Z","title":"6778–6786, survey Track","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:01.819937Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:f5c80c324d32fdca26474cad9e050442679f328fe740251c4e0608e9ed5d0389","observation_id":"6ea4199b-fc97-4deb-bdd0-f909d9c2a9e7","resolution":{"observed_at":"2026-08-04T12:39:01.819937Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.011630Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.011630Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:39548f9c9124de2255ec82ce44c3b6d96f5a8f054d88a762d9b70f1764725f9d","observation_id":"facb1bd0-82a2-49a5-afbb-fbd9f7cdb9d1","resolution":{"observed_at":"2026-08-04T12:39:02.011630Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.183406Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.183406Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:1d455d7184a99f454b8f16a4f6362eb58243a06a7235870796b8cea0d4fa4a46","observation_id":"a8acfbad-5857-4832-96ed-5b1f5b22a2be","resolution":{"observed_at":"2026-08-04T12:39:02.183406Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.365824Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.365824Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:6577837acda3c5078152421a06c521e3b07c130be17dad1d91978ade04fe2b8d","observation_id":"f0b75ff0-548c-4ca9-a22a-e30180a7d37e","resolution":{"observed_at":"2026-08-04T12:39:02.365824Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.533197Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.533197Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:82af8d504c5d53f77c9b790fec238a5991be92db94f998bfc1488175b9c39672","observation_id":"f5d31f9b-26ac-488a-93a8-c53820f08b4b","resolution":{"observed_at":"2026-08-04T12:39:02.533197Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.650127Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.650127Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:946d6e47954a031fc905fc52c1477a775ddd9481d1f669587e4858db18501367","observation_id":"98941b8e-ecb2-428c-9fe6-e6c7cb5dae71","resolution":{"observed_at":"2026-08-04T12:39:02.650127Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.771282Z","title":null,"venue":null,"work_id":null,"year":1995},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.771282Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b139e3459af16d3fabad9e50e20f4341fe2687298e6a761b50f49f6429f4b2d1","observation_id":"3ef36df8-3959-42bb-92c0-c5639b260b4a","resolution":{"observed_at":"2026-08-04T12:39:02.771282Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:02.917178Z","title":null,"venue":null,"work_id":null,"year":2003},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:02.917178Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:9c7321ced19013e0dfac41e444e8258af22ee8859df873b431bd20c20a8dbbec","observation_id":"520332f9-ce48-4eda-b35a-61790db8a453","resolution":{"observed_at":"2026-08-04T12:39:02.917178Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.050963Z","title":null,"venue":null,"work_id":null,"year":2003},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.050963Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:3217cf6862ca92cf53b0a8c6cb0a199df83a35078cdf7e281371f6474386f124","observation_id":"45ac561c-8c45-4275-b433-f0640b949a4a","resolution":{"observed_at":"2026-08-04T12:39:03.050963Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.225384Z","title":"Okutani, Y","venue":null,"work_id":null,"year":1984},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.225384Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:96929b4986ba80f6a49d680d5acd4fdf0be824235b9d49ded1b5d34859595b56","observation_id":"7a383ff7-72b5-4ffb-8359-acd52d6d6c85","resolution":{"observed_at":"2026-08-04T12:39:03.225384Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.377652Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.377652Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:292f257d8f270ff0a514823913f5cd76dcb00e28b16a61e851136515b7e33503","observation_id":"12d9eaf1-79fb-42d4-81b1-bc3245673463","resolution":{"observed_at":"2026-08-04T12:39:03.377652Z","resolver_source":null,"status":"malformed_identifier"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.537317Z","title":"Chen, C.-Y","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.537317Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b9d25fd887e573a6f252b8a712b30ff45eb8a80ff7eb9aa89d0bf7532b71bc12","observation_id":"4fe7bd8b-25fb-4f1e-92ea-ff4798c5ef7b","resolution":{"observed_at":"2026-08-04T12:39:03.537317Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.650051Z","title":"Zhang, G","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.650051Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:4f3b4654b3cce1dbd616d4de2e4a1b8938aa0f7dadca5d47203b03c0fb4edd5c","observation_id":"36352e83-4e4b-480c-bd04-554c6385aa6a","resolution":{"observed_at":"2026-08-04T12:39:03.650051Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.756191Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.756191Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:bff2e3a525eb456fcb060498ba8398403b0b350b4cc0e93fdc2e899e3eb941d6","observation_id":"6996860c-e642-434d-b10c-0d652a05ecb0","resolution":{"observed_at":"2026-08-04T12:39:03.756191Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.905594Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.905594Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:015bc52e3cf43a0739fb8a59876824e76ceba654deb3a16cd236c7c64a1cc2d1","observation_id":"520ba029-d495-4667-8dcb-5a2485b10ca8","resolution":{"observed_at":"2026-08-04T12:39:03.905594Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:03.976217Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:03.976217Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:e5e8dd62f5577823a4a832962ac5b88a7c42bdb5e37c404a0a706070bb6698b0","observation_id":"fa1700b1-86d7-461b-ab89-fa36a2c2c448","resolution":{"observed_at":"2026-08-04T12:39:03.976217Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.099816Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.099816Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:4a54b900b527c8c8209576de639a2b29509a2835caf174c35df61d22065d2a1b","observation_id":"b60ac22a-4061-4dcc-974d-2bb9c286b918","resolution":{"observed_at":"2026-08-04T12:39:04.099816Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.187833Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.187833Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:1459f9b968f8fa2f0fec287fd9efa80a48f068b86b643ecb46606771afb81181","observation_id":"44ae823d-d5c4-4883-b48f-683bf6e1d8cc","resolution":{"observed_at":"2026-08-04T12:39:04.187833Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.325092Z","title":"Jiang, L","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.325092Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:8867f841128089914f659934db6c288ce24d5af1e09e1ec7acbaa4c8459d8a30","observation_id":"c2f4cc50-a9ab-4838-915a-7c19524058d0","resolution":{"observed_at":"2026-08-04T12:39:04.325092Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.413935Z","title":"Méndez, M","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.413935Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b5b925f76b2046974c8b8b1da40931a086031dbf7910a408d2a3077950763d89","observation_id":"e9ffff65-7c3e-489a-8f6d-640155415d8f","resolution":{"observed_at":"2026-08-04T12:39:04.413935Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.487441Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.487441Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:f29d0e507016f88f3d0bc9acfa12b8e38845f23d2019c3dc81daa78ca785dfe4","observation_id":"4445a32c-9e8f-41eb-ada8-35294567b864","resolution":{"observed_at":"2026-08-04T12:39:04.487441Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.627631Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.627631Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:5ad59b3e07300452b45120c28d427c3e4b4fc05da69cbcf6bca871ca9b74fc6e","observation_id":"23d58b61-31fc-4ed8-8a31-14d43005bb85","resolution":{"observed_at":"2026-08-04T12:39:04.627631Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.778642Z","title":"Zheng, X","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.778642Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:5cf18aec79fd0ba5090c71d4bb5e2c75c8535f50abe6c0e4692d4b105f44853f","observation_id":"63e23f7f-3f48-4667-b29d-7cf4a920a346","resolution":{"observed_at":"2026-08-04T12:39:04.778642Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.850736Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.850736Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:5a1ede17020347c1edc110ffe5ed69851b58ffd4ac8495cd6bf99f038d2c10fd","observation_id":"98d28ea6-2ed4-431a-8dc2-a265fd42eecf","resolution":{"observed_at":"2026-08-04T12:39:04.850736Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:04.945569Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:04.945569Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:047de2ded557c0fae8f022dd7ec9be26e5d77db84cea6a85f1124ab76bee3b1f","observation_id":"17f46f2b-0c12-446e-b558-32d9e36bc54f","resolution":{"observed_at":"2026-08-04T12:39:04.945569Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.046695Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.046695Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:04a9307e85c7ab3e2508469fb2b071e5c3e04aa92712b764148fbdd80cb4e932","observation_id":"a0092935-9b93-418e-b7c0-bfc65486cb05","resolution":{"observed_at":"2026-08-04T12:39:05.046695Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.109808Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.109808Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:e6654d0062120ccfcfe6ca3d18db558efea97a18d2d9746a8bd6156ea7f2d475","observation_id":"dea56f10-a996-4b5f-9de2-86ac9bfe0a04","resolution":{"observed_at":"2026-08-04T12:39:05.109808Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.199118Z","title":null,"venue":null,"work_id":null,"year":2002},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.199118Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:53087110a987dfe317c685b047e252ef141a055c1eb0a7d9dda99210701b9356","observation_id":"b40438e7-f9db-42e1-b1ec-c74e713b2aef","resolution":{"observed_at":"2026-08-04T12:39:05.199118Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.269599Z","title":"2114–2124","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.269599Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:4f1553370832bb705ec0384fdc34340fcdf858f2e9da86124d3df77c015ddd34","observation_id":"c5b370b3-3255-4bad-8441-2322adafacc4","resolution":{"observed_at":"2026-08-04T12:39:05.269599Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.341263Z","title":"1567–1577","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.341263Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:aca11864fe6ee1b2f3c774e682f3810a700041d5af7316242a687ac1cdefaa0b","observation_id":"1249676e-3dc8-4fd5-a6f0-d853b28bfb3b","resolution":{"observed_at":"2026-08-04T12:39:05.341263Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.414068Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.414068Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:e91b156cf1248b615dfed09abb8b1cfb1567c8ae009f3a0d9eba4496887416c8","observation_id":"594591a2-1770-4f49-8245-dd7bf6fbd670","resolution":{"observed_at":"2026-08-04T12:39:05.414068Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.483486Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.483486Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:258c6261f1ef7bdae297b36e22be15e75c47bb952fed1a4da4233b5b0a265e6c","observation_id":"d8f46c48-7775-4d9d-9c77-8bf23465d177","resolution":{"observed_at":"2026-08-04T12:39:05.483486Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.556500Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.556500Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:fcd627e30a48c34ca577966606381e35d4f9710b200c47ed0e4f9754bc703e8e","observation_id":"519b0055-853b-4e8a-a52e-a3967eed8685","resolution":{"observed_at":"2026-08-04T12:39:05.556500Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.656932Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.656932Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:820eb74f128116f6a389a87fcf812e3d7a2581fa5a23afdb1dcbbd7188945d6c","observation_id":"48b0f5f0-476f-4816-a392-bb64e8a371d5","resolution":{"observed_at":"2026-08-04T12:39:05.656932Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.743660Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.743660Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:8f8b46af4126c3c1697cf5dd711cee6472f873d81e61ef2e324b86b001d6b81f","observation_id":"754373f8-da21-44ad-bd5b-15e3199d1ac7","resolution":{"observed_at":"2026-08-04T12:39:05.743660Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.840604Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.840604Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:121c0225075c8473f77aa8b673dbe0726308ce7980f8775aedda70580ea89162","observation_id":"3102b2a8-f47c-4ce3-9c23-4f685bbec620","resolution":{"observed_at":"2026-08-04T12:39:05.840604Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.912737Z","title":"Vaswani, N","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.912737Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:54ee17a065ab7095dd4eb36b2aff8269a77b83b9f586c49884ebe09548bee04d","observation_id":"534a5eb6-3d4d-4609-859a-4530a55d6486","resolution":{"observed_at":"2026-08-04T12:39:05.912737Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:05.979182Z","title":"Wang, J.-C","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:05.979182Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:1f23e712532a0bd1395b54c4bace3cd2d32b7aaecb779d4b0b3d5bf0830c76ba","observation_id":"057883b3-33a7-40d4-a71f-04f054436a06","resolution":{"observed_at":"2026-08-04T12:39:05.979182Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.059896Z","title":"1907–1913.doi:10.24963/ijcai.2019/264","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.059896Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:3d0c75a0483afe700d44ffb0ce98d355413d8e8e2daa8f2c512bbf17747c8841","observation_id":"d8bad158-7132-484b-94ef-9525e64c5120","resolution":{"observed_at":"2026-08-04T12:39:06.059896Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.129361Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.129361Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:e895dccea4de7dc3c08dcd49c48271b82fd2b0204909ea231744bc4dbb229d9e","observation_id":"d7e6b71f-c4ee-4fd3-b537-a8d744c78992","resolution":{"observed_at":"2026-08-04T12:39:06.129361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1707.01926","last_updated":"2018-02-22T19:52:51Z","snapshot_observed_at":"2026-08-01T21:20:06.448984Z","submitted_at":"2017-07-06T18:20:59Z","title":"Diffusion Convolutional Recurrent Neural Network: Data-Driven Traffic Forecasting","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1707.01926","snapshot_observed_at":"2026-08-04T12:39:06.228066Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.228066Z"},"links":{"cited_paper":"/paper/1707.01926","citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:a6bedc78eb2012223b3949c410af44f0a9bbd5e409b1413de802d19f38f25170","observation_id":"1e6d49b3-3197-41b4-8710-2b0cf4bfd038","resolution":{"observed_at":"2026-08-04T12:39:06.228066Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.335393Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.335393Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:43505e61e0dad451e6a9093db0a2ea6f9e2c4b93e473328d59a5962c681d1a98","observation_id":"ac43561c-c2d5-42e6-96b1-e1dfefbcf487","resolution":{"observed_at":"2026-08-04T12:39:06.335393Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.430811Z","title":"38, 2024, pp","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.430811Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:c089d2d7827e392059b04dc5246e395709f5e3056fe10750dc5d3424137a6ea0","observation_id":"0ae4a885-aec1-4494-a244-32267608eff2","resolution":{"observed_at":"2026-08-04T12:39:06.430811Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2206.09112","last_updated":"2022-09-05T01:56:09Z","snapshot_observed_at":"2026-08-10T11:21:47.320755Z","submitted_at":"2022-06-18T04:14:38Z","title":"Decoupled Dynamic Spatial-Temporal Graph Neural Network for Traffic Forecasting","version":4},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2206.09112","snapshot_observed_at":"2026-08-04T12:39:06.532399Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.532399Z"},"links":{"cited_paper":"/paper/2206.09112","citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b58e6aea8f427dee7a5b31d162c819ca41ba7f905d18a71330ccaef7bf9c1114","observation_id":"835afc26-9730-4367-972a-20ceb7b75f77","resolution":{"observed_at":"2026-08-04T12:39:06.532399Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.613332Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.613332Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:cbbe7669b55ffed543b44c1759720ae351fd5b3305e25a21397e446cfc24d2d0","observation_id":"a72e8656-0f9c-4f48-aaa4-ae64bbf7b6a2","resolution":{"observed_at":"2026-08-04T12:39:06.613332Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.731630Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.731630Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:1ded35e440455779ed3b3b37a5797a477d9262b59d961ed1f1573bb92be02435","observation_id":"8f8558f3-1cdf-4448-a1ac-c939b291d009","resolution":{"observed_at":"2026-08-04T12:39:06.731630Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.849920Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.849920Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:9952e110c6917afc7a6d931a9814732290429403fb7bb13cd35ae4f0826e09bb","observation_id":"9d3b1163-035c-4605-817f-c8e9385b6f95","resolution":{"observed_at":"2026-08-04T12:39:06.849920Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T12:39:06.929533Z","title":"34, 2020, pp","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges","version":3},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-04T12:39:06.929533Z"},"links":{"citing_paper":"/paper/2510.03381"},"observation_digest":"sha256:b3c7f8d3106fa72085eb70c775773647aabfc0e7d17035149a84cf744460f36d","observation_id":"e90da90e-f498-4c92-b1e1-18ee3cfc1119","resolution":{"observed_at":"2026-08-04T12:39:06.929533Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2510.03381","last_updated":"2026-06-05T07:39:08Z","latest_version":3,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-09T23:15:13.472108Z","submitted_at":"2025-10-03T15:26:56Z","title":"Proxy Reconstruction Pre-training for Ramp Flow Prediction at Highway Interchanges"},"reference_resolution":{"displayed":73,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":72,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":73},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"thesis":"As of 11 August 2026, this Paper Citation Record lists 73 of 73 outbound references and 1 inbound Pith citation observation for arXiv:2510.03381."}