{"as_of":"2026-08-12T20:13:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:8131a437e7af3ed36021660885b3dea0ecf4022a5a99f6e5fec06e3e0ccb58df","coverage":[{"denominator":81,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":81,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-03T16:27:45.833481Z","state":"measured"},{"denominator":81,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":81,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-12T06:34:41.77262+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2512.13496/citation-record","integrity":"/paper/2512.13496/integrity","json":"/paper/2512.13496/citation-record.json","paper":"/paper/2512.13496"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.107602Z","title":"Renewable energy directive, fit for 55 packages","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.107602Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b3b5a27aa54123b378dbd4a67a5958bd088e8fda6ce174f116509a4d5a26c4c5","observation_id":"f999bc35-3300-4347-beaf-0f08173a79f0","resolution":{"observed_at":"2026-08-03T16:27:40.107602Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.162828Z","title":"The north seas as Europe’s green power plant delivering cross- border projects and anchoring the renewable offshore industry in Europe,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.162828Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ef81b9b99994d739b325c0fd88252e42d85e62b9794752dae230657a759ed0fd","observation_id":"d76aaa07-75cc-4a80-91b7-e99b2b2a5cfe","resolution":{"observed_at":"2026-08-03T16:27:40.162828Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.273719Z","title":"Van Hertem, O","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.273719Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ed5750bb40ceeeb41d074e4973cc49cba4c5b2eaf8892de37fbb2557163a70b9","observation_id":"10b8c7e7-fc61-4be1-ad25-cffecbd09ac1","resolution":{"observed_at":"2026-08-03T16:27:40.273719Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.350458Z","title":"Future north sea infrastructure based on dogger bank modular island,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.350458Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:3b7ecc3fc30e09d8c66432331cad0a6d03528ebe63f6ed917eec77d74e1ffb3d","observation_id":"542b7d69-0d49-466b-97f5-11643a1641d0","resolution":{"observed_at":"2026-08-03T16:27:40.350458Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.394910Z","title":"Transforming our seas into europe’s sustainable economic engine","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.394910Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:0fd5bbd2626b0709c80e52ca30682f07fd494f8d82573a97d44d7decb1b25c23","observation_id":"40ca91b5-8772-48e0-862e-e41ee9c461f9","resolution":{"observed_at":"2026-08-03T16:27:40.394910Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.496626Z","title":"Denmark’s energy islands","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.496626Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:2062b9622843decc2303f7da88547ada999b307be97714b7ca29743509213efa","observation_id":"8e38fbd3-e523-42aa-ab80-ad06b69d5cdc","resolution":{"observed_at":"2026-08-03T16:27:40.496626Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.610860Z","title":"Commercial framework offshore bidding zone","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.610860Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:a5c89e19f912bd5f7a13fd92e85fe6dad095a6ac46db5902cd0c7d3990b19548","observation_id":"1d64d85e-2b85-4d4f-84a7-4546ef686f0f","resolution":{"observed_at":"2026-08-03T16:27:40.610860Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.782614Z","title":"Review, definition and challenges of electrical energy hubs,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.782614Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:34de5339e6b7ad7b85e1a018b6dd2ecf62a96e79524ef43721b647b4c5df76a8","observation_id":"1f44a12f-03d0-4993-bd37-df8d82677d7c","resolution":{"observed_at":"2026-08-03T16:27:40.782614Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:40.901765Z","title":"Technical report PES-TR86 - Studies for Planning HVDC,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:40.901765Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:910fc5952c453a4fe21ba9562e98fd120afa16f04801219773832296b9851e17","observation_id":"53c8bbe7-6bef-4c4a-a310-a89bbb095f29","resolution":{"observed_at":"2026-08-03T16:27:40.901765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.005107Z","title":"4th entso-e guideline for cost benefit analysis of grid development projects","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.005107Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:0e2c5991d775ee4113bdad0301ca9ecc18c4ea0e97790b88ff83b46083f59a27","observation_id":"1fd4aacd-7ff1-4ab2-8ff1-17c8923f54fe","resolution":{"observed_at":"2026-08-03T16:27:41.005107Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.164682Z","title":"A Multi-GW Energy Hub for Southern Europe: the Mediter- ranean Energy Island Proposal,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.164682Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:545538139da6cb580ecbc62bad1c65d306f7e18d9f17ef79acac1c43cb7442c5","observation_id":"04f2d9b6-4ad3-4887-9af4-7c758f89e5c7","resolution":{"observed_at":"2026-08-03T16:27:41.164682Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.256224Z","title":"Glossary","venue":null,"work_id":null,"year":2004},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.256224Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:cca227df61929ecd0bc49cb49786cd9c33635c6c100ae9741d99339f6c113e48","observation_id":"018954e5-6ebe-428b-b989-a0bd25a851e1","resolution":{"observed_at":"2026-08-03T16:27:41.256224Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.292653Z","title":"European offshore network transmission infrastructure needs","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.292653Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:d2e4e6cdd652a2b8252a7569705c18e41cae47e702e16249c895a2ac3b2f622e","observation_id":"185f56f1-b0ed-4d3a-a3b2-c471f0af24cb","resolution":{"observed_at":"2026-08-03T16:27:41.292653Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.365378Z","title":"Network Code on Operational Security","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.365378Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:d717da925325874bc8293510dd88dcceec0c780c928992e2df22f0af13470dbb","observation_id":"db73e4c4-3e19-4f80-9ef7-0a3848a1a318","resolution":{"observed_at":"2026-08-03T16:27:41.365378Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.426708Z","title":"The influence of frequency containment reserve flexibilization on the economics of electric vehicle fleet operation,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.426708Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b2bb57dc001c8dfba17968e553637c07e6cdd9f7fbc620d9c6f77f0e90600fbd","observation_id":"18fef2fc-5628-493a-b309-d3df202b3ee6","resolution":{"observed_at":"2026-08-03T16:27:41.426708Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.479713Z","title":"Task Force Overfrequency Control Schemes - Recommendations for the Synchronous Area of Continental Europe","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.479713Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:0ee6a66b6d2e6d351a7d6eee78e0003aef07a53652f0e8aded75abe062057c49","observation_id":"6fa070dc-1ccd-4b95-95a1-48e8c1a473f0","resolution":{"observed_at":"2026-08-03T16:27:41.479713Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.516086Z","title":"Adequacy and flexibility study for Belgium","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.516086Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:bb9aa15458f4092cc7dfd5d9396e42e9029ee4173451427f6f006f7c0504985a","observation_id":"24340d25-cdbc-443f-9c2c-261a67c9d293","resolution":{"observed_at":"2026-08-03T16:27:41.516086Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.599982Z","title":"PICASSO","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.599982Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:6848130bb4fafa027f50132559e6eea38223bd3be654be54ca19043fd36ba6ce","observation_id":"c8664df5-6bb3-4ecc-b110-22152232a90e","resolution":{"observed_at":"2026-08-03T16:27:41.599982Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.664473Z","title":"MARI - KPI REPORT 2022-2023","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.664473Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:225ef70bac79aa3781ccfd6b200a452db9b5d6a8c1ba9c6a322b59a3d25af17e","observation_id":"d2cfbed4-ac4d-44fb-8259-17842c601002","resolution":{"observed_at":"2026-08-03T16:27:41.664473Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.719737Z","title":"Electricity grids and secure energy transitions","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.719737Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:27c3746862784417deee089c8a5e48a92a9019522de54a72c5f0be9385fb6db2","observation_id":"cb87af0e-bce2-4296-9fb7-1938c011968f","resolution":{"observed_at":"2026-08-03T16:27:41.719737Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.788583Z","title":"Electricity 2025: Analysis and forecast to 2027","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.788583Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:bbf54f79ef3f1433a3f62856c242bbe3d0a4ab2eaefca2bdce6d8e395b7f7f98","observation_id":"e8f53bff-4305-4fe6-9550-9fad20ad5726","resolution":{"observed_at":"2026-08-03T16:27:41.788583Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.832054Z","title":"Commission Regulation (EU) 2015/1222 of 24 July 2015: Establishing a guideline on capacity allocation and congestion management (Text with EEA relevance)","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.832054Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b0d9630def15e4ded4b150c304a2ac0e06072c81cb3d84b0c031b0dec07a4bcb","observation_id":"bac6c8b5-097a-4dd7-b012-659bb95e1f0a","resolution":{"observed_at":"2026-08-03T16:27:41.832054Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.889446Z","title":"Future- proofing the European power market redispatch and congestion management","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.889446Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:7de21cfe005e46fbbbd66ca9348f719980ea388bfe6c56ae3162e6dbad5c033c","observation_id":"39af8fd7-4204-4029-afe2-ded0e3d2acaa","resolution":{"observed_at":"2026-08-03T16:27:41.889446Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:41.953519Z","title":"Costs of congestion management","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:41.953519Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:44794d6bd13f97376921bf2b2eb64dadaefc9756743b42b04a9e6742afd31a40","observation_id":"e3dddeba-fe25-471b-9d23-fd636e350669","resolution":{"observed_at":"2026-08-03T16:27:41.953519Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.021089Z","title":"Congestion management","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.021089Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b9104f793d3acce0eeb011d6b409af050f39476c0ffdc67ff7220de826d1029b","observation_id":"778492a0-409b-4b77-a1a7-57d260cdb251","resolution":{"observed_at":"2026-08-03T16:27:42.021089Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.097432Z","title":"Optimal transmission switching,","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.097432Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:f7b54769175d61af6539cc01f02e00df6d4a9957cdb6221bb1d89e6d898cfcbe","observation_id":"fab37762-4c90-45d6-abe4-3ea3d75068fb","resolution":{"observed_at":"2026-08-03T16:27:42.097432Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.170105Z","title":"Optimal transmission switching with contingency analysis,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.170105Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:a05722f3614516aeeda1bc9a177fea489d890ed3e2403eca5b779c95dd111c9a","observation_id":"ece566d6-de0e-4223-a2a5-c1605b03afd2","resolution":{"observed_at":"2026-08-03T16:27:42.170105Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.239805Z","title":"Optimal transmission switching—sensitivity analysis and extensions,","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.239805Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:42b7d459be161d2abe96bd1ae09f5701e30943e13017fb7647cf402f06dab650","observation_id":"51f35894-6eed-4d92-9c0a-771ce951856d","resolution":{"observed_at":"2026-08-03T16:27:42.239805Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.306392Z","title":"An optimal transmission line switching and bus splitting heuristic incorporating ac and n-1 contingency constraints,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.306392Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:f8f95a5b3424df546f5034f0c6c7086f2024370d4add97daeecb45e1f63f74b5","observation_id":"47a7d85e-1d86-47dc-87fa-296e03300959","resolution":{"observed_at":"2026-08-03T16:27:42.306392Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.354173Z","title":"Security constrained OPF utilizing substation reconfiguration and busbar splitting,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.354173Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:9cdc108e07d613f1340fdfa7f8124a7549c81836cad1b2d4c5a7764c1b820ee0","observation_id":"7bb71872-1d71-4971-839a-b0ff645ff7eb","resolution":{"observed_at":"2026-08-03T16:27:42.354173Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.428703Z","title":"Optimal Transmission Switching and Busbar Splitting in Hybrid AC/DC Grids","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.428703Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:2398b8ae8a9fcc6129c44688e271b1fac93de9adcbf386a957a8065b2836115a","observation_id":"f8e775ad-6882-4ddb-add9-8d96fffb17b3","resolution":{"observed_at":"2026-08-03T16:27:42.428703Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.515338Z","title":"Day-Ahead Transmission Grid Topology Optimiza- tion considering Renewable Energy Sources’ Uncertainty","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.515338Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:5310abee6a2f3b258bb6fcec19ae89b841b9eddbbfd77f93450027fd105d9e05","observation_id":"4602ca77-75e8-4664-b11e-109340584e80","resolution":{"observed_at":"2026-08-03T16:27:42.515338Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.583935Z","title":"Identifying best candidates for busbar splitting","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.583935Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:9d90b799cb6305fad6a6a89a51aa9ca53be780fd727c28af68ffc8e83801ced9","observation_id":"dd3b540d-df98-47ad-bb0d-26517c0d7649","resolution":{"observed_at":"2026-08-03T16:27:42.583935Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.647721Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.647721Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:f60cc8b5488042448cdaf8f27481cfe3c44e2c244241106d517c699939d58f15","observation_id":"2f87ecf9-9df1-46c0-a08d-b71ffab8c51d","resolution":{"observed_at":"2026-08-03T16:27:42.647721Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.716373Z","title":"Optimal transmission network expansion planning in real-sized power systems with high renewable penetration,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.716373Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:f44f3305ccd07da41d0d38e937400e4ad9119251d20a721ab346dbc1cdb186f3","observation_id":"56c17ec1-4dcb-431b-ba91-5cbc22942cbb","resolution":{"observed_at":"2026-08-03T16:27:42.716373Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.787253Z","title":"Tnep of meshed hvdc grids: ‘ac’, ‘dc’ and convex formulations,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.787253Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:cebb98e4ab443f233ad867b247a679f07dc54a23a76fe9cac85638f98d5df7b7","observation_id":"fef83474-a88d-43cc-84e7-e5c5445681e2","resolution":{"observed_at":"2026-08-03T16:27:42.787253Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.859032Z","title":"Alpha Ventus","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.859032Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:32e1a9eddabb0ea79d2417d152deaa3840b66b682360fa2480730836567835c5","observation_id":"c4e776fe-1156-4086-b2ac-ee4b99081ca5","resolution":{"observed_at":"2026-08-03T16:27:42.859032Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.930285Z","title":"Final outcome of the task force princess elisabeth zone,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.930285Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:8e8236f8b72d7e842f2f31e78e836d91699de0a977ba86b501d9f9e612381a00","observation_id":"fb6e2228-e3e7-493a-895d-dece374989bc","resolution":{"observed_at":"2026-08-03T16:27:42.930285Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:42.990286Z","title":"North sea energy island","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:42.990286Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:eb37b1f9b9fd930951d1b73c3fdf03c9a4a8ce464e60abfecfa69c493b6148dd","observation_id":"6b44228a-da3c-4083-a157-4dea6255dabd","resolution":{"observed_at":"2026-08-03T16:27:42.990286Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.086232Z","title":"A review of key strategies in realizing power system resilience,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.086232Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b392fd0949b8592e8eda43014f8688b79eba52c3032c07e6ffc7e042b64709a4","observation_id":"72fc7be9-4e30-4272-a6fa-61ccccc7e615","resolution":{"observed_at":"2026-08-03T16:27:43.086232Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.135737Z","title":"Building the future transmission grid - strategies to navigate supply chain challenges","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.135737Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:dc81982a8cd11a101e05036bf791fb64f7df6d4c39e63cdc80334c9d3a6c0f95","observation_id":"991c8084-f676-458c-a726-cbdda8ec0eda","resolution":{"observed_at":"2026-08-03T16:27:43.135737Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.201837Z","title":"Grinding the grid: Contextualizing protest networks against energy transmission projects in southern germany,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.201837Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:2fc05e14bc185643837a0f90cce0fa3d3536369d961c787ed0247c875fe62b55","observation_id":"7bdf20e9-0649-4f4c-b716-3f3cf209e405","resolution":{"observed_at":"2026-08-03T16:27:43.201837Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.298871Z","title":"State-of-the-art of hosting capacity in modern power systems with distributed generation,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.298871Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ead1311fce933e39b5d1546c6613d9d3bb9b80b26f501f79b2fa9361691c6fad","observation_id":"cc226cef-82e5-48df-a4c9-e92484de12b1","resolution":{"observed_at":"2026-08-03T16:27:43.298871Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.368404Z","title":"Antoine, L","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.368404Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ee58ba9df3ce5debb61dbc7c069c9a113d39019a3b5ad873d45178c2bc0fa674","observation_id":"096df5fa-5ea9-44d4-aa4c-df6285add8e8","resolution":{"observed_at":"2026-08-03T16:27:43.368404Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.422783Z","title":"The reference for the future european electricity system","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.422783Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:528c3db5ebbc00ef93834c971fa3233c3ae7a936d61f41c265e3990075ea9c4b","observation_id":"057fe467-ab6f-416e-9c0a-f5a540c98d4a","resolution":{"observed_at":"2026-08-03T16:27:43.422783Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.485996Z","title":"Security and quality of supply standard","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.485996Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:4feb7a84c9d4b7540a7f5f499117291171bd3d4506676c82eb598bee0a824481","observation_id":"8bc63a6a-7d9d-4d22-8019-793c7618c84f","resolution":{"observed_at":"2026-08-03T16:27:43.485996Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.568654Z","title":"Requirement for minimum inertia in the nordic power system","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.568654Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:f985edace73e34581f3e01bf4739f57a3bf30d9e01fd807afc0682c4b82cd446","observation_id":"cf8c971e-718a-41b6-b549-240d36e97f10","resolution":{"observed_at":"2026-08-03T16:27:43.568654Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.621607Z","title":"A Techno-Economic Analysis of meshed Topologies of Offshore Wind HV AC Transmission,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.621607Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:52e21522ccf1544c4bfb6d808d23c8bc1850877b03fe3fe1b4287077d4095b2c","observation_id":"4589b1b5-060f-4e98-80bb-1307de545820","resolution":{"observed_at":"2026-08-03T16:27:43.621607Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.680027Z","title":"Multi-terminal VSC HVDC for the European supergrid: Obstacles,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.680027Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ef12cd40af8416dc81f6fde2230fd370c450ea31a466c26634836a85651599e7","observation_id":"c327988b-6e32-4246-93c0-8a81821249d5","resolution":{"observed_at":"2026-08-03T16:27:43.680027Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.745464Z","title":"Substations for future hvdc grids: Equipment and configurations for connection of hvdc network elements,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.745464Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:9b262e455f73a6f2511640642f053dc274bca0db08e22dfa4230734a1d8ac383","observation_id":"52706e3e-57a0-4bd2-a9d9-84fa156bdda9","resolution":{"observed_at":"2026-08-03T16:27:43.745464Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.812557Z","title":"On control and balancing of rigid bipolar mmc-hvdc links enabling subsystem-independent power transfer,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.812557Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:6412a2f7b68bf331da52752b0957dcd63d48d2fa4b72b25469ccc8ab8f1fc304","observation_id":"62b4118d-54a7-40c6-8fc9-8fa03e8a5ffa","resolution":{"observed_at":"2026-08-03T16:27:43.812557Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.915469Z","title":"Hybrid ac/dc opf model for unbalanced operation of bipolar hvdc grids,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.915469Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:5e7726cf8044f961f9b5127ee0de498507d6e2f02ce44959731c075ccc7b5fd3","observation_id":"a3363071-3102-43d5-9807-0727c6e4ca0b","resolution":{"observed_at":"2026-08-03T16:27:43.915469Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:43.986076Z","title":"2 GW program","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:43.986076Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:0119ff62d2f577ab2ae8972b337758c673782f329ccb9dca0abdbeebf51d2e03","observation_id":"2398027f-9eca-480c-aafd-88dfd107a3e9","resolution":{"observed_at":"2026-08-03T16:27:43.986076Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.079433Z","title":"Hvdc links in system operations","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.079433Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:e614f6d060b3b34a15fc32fef67cee4a08ef2a592393184aa02bffaeb3f525b5","observation_id":"5246e44f-d2fc-4229-893a-a05421b488c0","resolution":{"observed_at":"2026-08-03T16:27:44.079433Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.166339Z","title":"Wenig,Potential of Bipolar Full-Bridge MMC-HVdc Transmission for Link and Overlay Grid Applica- tions","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.166339Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:894ae1895aba49b3b9fbaaa7fd8f5913e0be7aa9bdb4bff900954e6a70edc96f","observation_id":"fefb6a2d-8e96-417e-b85f-48dadf545f0e","resolution":{"observed_at":"2026-08-03T16:27:44.166339Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.205383Z","title":"A review of lcc-hvdc and vsc-hvdc technologies and applications,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.205383Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:c239b72cb7e98908cac1ebfc845812511b7742d4b265e43bc8b7d86d6e0d5a2d","observation_id":"15a81259-3fe3-4b9a-925c-57773d76d3f6","resolution":{"observed_at":"2026-08-03T16:27:44.205383Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.267703Z","title":"Circuit breakers in hvdc systems: state-of-the-art review and future trends,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.267703Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:582f45bb84324dd8f4603bc381ee8e272083bb5248705802840cd7b2ed926a54","observation_id":"59f93640-8b6e-4548-9c5d-5793aead546b","resolution":{"observed_at":"2026-08-03T16:27:44.267703Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.354053Z","title":"Designing for high-voltage dc grid protection: Fault clearing strategies and protection algorithms,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.354053Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:0ac9721ff25467d511bb83b0d95ac1274db8c15698a2dc2e064d1c69084a919b","observation_id":"7b161d62-5daf-4dc6-911a-1d7013ac028e","resolution":{"observed_at":"2026-08-03T16:27:44.354053Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.444944Z","title":"Techno-economic comparison of preventive dc-side decoupling and dc circuit breakers in multiterminal offshore hvdc grids,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.444944Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:4db4e3b47510f52c5d6d9bef45cbf76210628ad331db0cc0d7b11fa1d7c677fd","observation_id":"fa241edf-7a9b-48bd-b9c5-7e1229f3cafc","resolution":{"observed_at":"2026-08-03T16:27:44.444944Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.493800Z","title":"Five misunderstandings about case study research,","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.493800Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:40ef7e1b76b6fa34f604c53ac13a9e22ee8aee7d368f2d26c668435521159ea5","observation_id":"a1bbc92a-de1c-43f2-bfd2-9c1391595d5d","resolution":{"observed_at":"2026-08-03T16:27:44.493800Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.576191Z","title":"Flyvbjerg, N","venue":null,"work_id":null,"year":2003},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.576191Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:cb0aa2542ded71202c79072c56a6628d12655e0296b634b9c5a39c6a978dd10a","observation_id":"b5e1b567-e07f-4eff-920b-165a6b65e756","resolution":{"observed_at":"2026-08-03T16:27:44.576191Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.629825Z","title":"Fully qualified 640 kv underground extruded dc cable system,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.629825Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:fd824cf8a71987255f11ff40c8ee0722e6da9e809ce37ff0ff96cff36e8b7218","observation_id":"68d21e31-f037-47eb-a46e-0736fbca03e5","resolution":{"observed_at":"2026-08-03T16:27:44.629825Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.694017Z","title":"Converter station design of the±800 kv uhvdc project yunnan-guangdong,","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.694017Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:82524348680c60b7b9879d78ba57374090853874cc4d7104964ae93d726792ac","observation_id":"dc6edaf5-ca54-41d5-ac59-81634bd973c2","resolution":{"observed_at":"2026-08-03T16:27:44.694017Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.736714Z","title":"Bornholm energy island","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.736714Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:06220c21d650a0d2febf776d0fff93c0909139588cfe29c5cb6821a9cdae9f10","observation_id":"59384e44-c620-4725-a058-0172baa2f139","resolution":{"observed_at":"2026-08-03T16:27:44.736714Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.805082Z","title":"Offshore energy hubs feasibility assessment of hub topologies","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.805082Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:1c20af1d334cc4b81ff3feb4c385a3e95e9128c05b3417958c7bc1e5fa1ede17","observation_id":"79e97450-3520-4489-ad24-52f2fcd4f10b","resolution":{"observed_at":"2026-08-03T16:27:44.805082Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.848251Z","title":"Exact methods for the knapsack problem and its generalizations,","venue":null,"work_id":null,"year":1987},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.848251Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:2d79681d06ae0e0a1e4d3430337a50df0f3807d599443965e960467a31a1d5fb","observation_id":"e4893fb4-d6b0-45ed-bb0a-5a460790b46d","resolution":{"observed_at":"2026-08-03T16:27:44.848251Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.908005Z","title":"Converter station configurations for gw-scale mvdc systems using superconducting cables,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.908005Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:9244b3d7fc8d5468e6b72237269adc9cbde41cc7cd4ee361031959383902e917","observation_id":"9dc242b9-391c-459c-a612-935384fc04e9","resolution":{"observed_at":"2026-08-03T16:27:44.908005Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:44.963719Z","title":"Preventive dc-side decoupling: A system integrity protection scheme to limit the impact of dc faults in offshore multi-terminal hvdc systems,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:44.963719Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:b37f3b5113a37cb1cf1d0ecff5b7097696950dec49fb4f56fd98301ee2da2ffd","observation_id":"4c992a6d-8ca6-4322-96a3-c0502cbcf520","resolution":{"observed_at":"2026-08-03T16:27:44.963719Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.005061Z","title":"Modular multilevel converter losses model for hvdc applica- tions,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.005061Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:56227893a0691f7a33e063a861c5160957a1582942e3dd44763bff853e230851","observation_id":"9b1aab55-6098-41c5-b7e4-ce85f9fe1a07","resolution":{"observed_at":"2026-08-03T16:27:45.005061Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.086735Z","title":"Optimization of transmission technology and routes for pan-european electricity highways considering spatial aspects,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.086735Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:63e59b8cb03628e83d7b01485083ea18700ad95f554c78efd6e15d6e5a2077ef","observation_id":"c319b1ab-0d2e-415a-9e94-ceb6d72d7fb0","resolution":{"observed_at":"2026-08-03T16:27:45.086735Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.141742Z","title":"On informationally decentralized systems,","venue":null,"work_id":null,"year":1972},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.141742Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:96b077b633d5d38a399b44e67162a0c8e42a5acbda76e1572eb9d0d79920f9de","observation_id":"cd7d31cf-0ac0-4670-bc67-d8c594a7c622","resolution":{"observed_at":"2026-08-03T16:27:45.141742Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.221110Z","title":"Exploring market properties of policy-based reserve procurement for power systems,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.221110Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:16435449fbe7e320a3463f5e7efc5019e5cee33d1ad185ab16f0f9b5761d31fa","observation_id":"a57672e2-9cef-4948-b752-cf775a33b51c","resolution":{"observed_at":"2026-08-03T16:27:45.221110Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.266791Z","title":"Efficient mechanisms for bilateral trading,","venue":null,"work_id":null,"year":1983},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.266791Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:aa3e4693d3a5c3f31a105ff19043ec4eab1ac63a937441ab0f1f2c3844eeed24","observation_id":"95e98a65-4a38-4597-ab2d-693ec88d20de","resolution":{"observed_at":"2026-08-03T16:27:45.266791Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.335178Z","title":"Deliverable 4.2 Multi-Part Cooperation Framework-Preliminary draft with focus on information sharing","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.335178Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:cc42fb14f6237242f8dac219dcb3e6c24dbbcad7f14595bfde126b4ac924c18b","observation_id":"9163add2-df8e-494d-9cac-7e571517d813","resolution":{"observed_at":"2026-08-03T16:27:45.335178Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.397554Z","title":"Multi-vendor interoperability in HVDC grid protection: State-of-the-art and challenges ahead,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.397554Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:1fcba3bc29444382ef9f5f7c31d1177dc636af9b087fb5dde937101cc057ed83","observation_id":"6f401ebe-e216-457e-b59d-31bf6655683e","resolution":{"observed_at":"2026-08-03T16:27:45.397554Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.464253Z","title":"Prediction of reliability and availability of hvdc valve and hvdc terminal,","venue":null,"work_id":null,"year":1970},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.464253Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:305c6285f5022425f64be0dcab57faebfcd2625b2e8e59c99155252697967acd","observation_id":"7167ddbb-d988-4efa-8759-d9d8e0ab755c","resolution":{"observed_at":"2026-08-03T16:27:45.464253Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.536417Z","title":"Review and classification of reliability indicators for power systems with a high share of renewable energy sources,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.536417Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:5463361754ba8c3a35a48537d0562506cafefa5fe35b415928fc43a62433beae","observation_id":"c4dbd310-242c-45e7-89d0-9f5d1dc0409a","resolution":{"observed_at":"2026-08-03T16:27:45.536417Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.622991Z","title":null,"venue":null,"work_id":null,"year":1999},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.622991Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:75a248b9e18a98be1084a582163686f76eb2bec5b989916ae62695f8e9a3d282","observation_id":"f7ee4f0b-3d4d-4c34-b410-0929e8aaea4f","resolution":{"observed_at":"2026-08-03T16:27:45.622991Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.710101Z","title":"Regulation (eu) no 517/2014 of the european parliament and of the council of 16 april 2014 on fluorinated greenhouse gases and repealing regulation (ec) no 842/2006,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.710101Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:ad7affc86cb6556f41046871900c0b593d14ed7781fbd14ec17bc8f5be78718c","observation_id":"557668dc-f132-46c7-84fb-bd7cf62769e2","resolution":{"observed_at":"2026-08-03T16:27:45.710101Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.754975Z","title":"Princess elisabeth energy island","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.754975Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:d696d173936fb1cb49a2099b16e93ecae8df438eda6d44020afdc1651db2830e","observation_id":"918ac7b3-7e47-4be2-9127-01b0acdcf322","resolution":{"observed_at":"2026-08-03T16:27:45.754975Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T16:27:45.833481Z","title":"Circular economy: A brief literature review (2015–2020),","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects","version":2},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-08-03T16:27:45.833481Z"},"links":{"citing_paper":"/paper/2512.13496"},"observation_digest":"sha256:c6262879e25b611df5dd6cd7ab4f76b35636b52a9f11068f02b5c805ecef4e01","observation_id":"5d6a8839-5646-4f49-93ae-835fc75858d1","resolution":{"observed_at":"2026-08-03T16:27:45.833481Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2512.13496","last_updated":"2026-07-23T11:58:44Z","latest_version":2,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-10T02:08:43.940564Z","submitted_at":"2025-12-15T16:26:10Z","title":"Identification of Technical Design Constraints and Considerations for Transmission Grid Expansion Planning Projects"},"reference_resolution":{"displayed":81,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":81,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":81},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"thesis":"As of 12 August 2026, this Paper Citation Record lists 81 of 81 outbound references and 0 inbound Pith citation observations for arXiv:2512.13496."}