{"as_of":"2026-08-10T18:11:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:80b7334e7aec03fdeaa6015dced6b797c20410fe735aa8a2b8d03d54d38e0c8d","coverage":[{"denominator":27,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":27,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-04T06:23:54.433418Z","state":"measured"},{"denominator":27,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":27,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2601.14558/citation-record","integrity":"/paper/2601.14558/integrity","json":"/paper/2601.14558/citation-record.json","paper":"/paper/2601.14558"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.139631Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.139631Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:81770fa0d8aa10a5ba41f9596fdbdc37a38c17b04e89bff0fe888f556f84e4a5","observation_id":"aa29e2b9-e4bc-4917-8f5b-17854d485fa9","resolution":{"observed_at":"2026-08-04T06:23:51.139631Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.231579Z","title":"The Future of Nuclear Energy in a Carbon -Constrained World,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.231579Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:7862c2686447e9bf6bcc8f6a8c44a1f23fecc5e6f2fa45680cf168edede44098","observation_id":"6c0f3c18-499a-41b2-8b30-fd0a7effbaad","resolution":{"observed_at":"2026-08-04T06:23:51.231579Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.389241Z","title":"Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.389241Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:f034e07231f303a4f0e8851a2078be10758964c701875f4f3abd02d96f04bf13","observation_id":"5408c901-cdbb-4df8-a711-2b60c83a1d84","resolution":{"observed_at":"2026-08-04T06:23:51.389241Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.513365Z","title":"Phase IX Update (1987) Report for the Energy Economic Data Base Program,","venue":null,"work_id":null,"year":1987},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.513365Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:ee8af37726a183344fc9cc21225f79d0238a62f1bc2938ad8c83e515b0699c19","observation_id":"fc0f9bf3-cace-4e39-b718-f8ef5f823564","resolution":{"observed_at":"2026-08-04T06:23:51.513365Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.656393Z","title":"Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics,","venue":null,"work_id":null,"year":1981},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.656393Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:eeaf48f08a1544b58b8d4103c7465522c879740930cd3bc857a897caa95e1134","observation_id":"1e838be3-c733-4258-87b7-c7da83ae9212","resolution":{"observed_at":"2026-08-04T06:23:51.656393Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.772277Z","title":"An Analysis of Nuclear Power Plant Construction Costs,","venue":null,"work_id":null,"year":1985},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.772277Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:b5c2700d4b233ba457fb3f27dc14dcea91bcec60ce6dc706bb4b2ad40eabb01c","observation_id":"fd766646-8467-4c1d-8804-9fe0759c9776","resolution":{"observed_at":"2026-08-04T06:23:51.772277Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:51.909785Z","title":"Analysis of Nuclear Power Construction Costs,","venue":null,"work_id":null,"year":1988},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:51.909785Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:37570fe352ea5f80f7f1031e1cadf5511942165583f1fefd7f801bb268270979","observation_id":"a0269d4b-2ed1-423a-9ba3-64ba0768c51c","resolution":{"observed_at":"2026-08-04T06:23:51.909785Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.037097Z","title":"The Successful Delivery of Megaprojects: A Novel Research Method,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.037097Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:8f1bbbc67728ac93a60673343424db6184f50ab0b9e43ab12b283b64a882d6b5","observation_id":"6d207660-2d82-4683-b6cf-6e5dcab3436a","resolution":{"observed_at":"2026-08-04T06:23:52.037097Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.078013Z","title":"Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.078013Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:9db39eed4dfbf4b4b7ecd54c977690d319f24d68d8a70b8c830d9f89f1a375f7","observation_id":"1d28fefd-476f-4852-a2eb-3ecabde78c69","resolution":{"observed_at":"2026-08-04T06:23:52.078013Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.192038Z","title":"Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.192038Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:913c8abd0a030b65e48c2275372592ef4cc9f90b9ae786bc1a66247ff07fc07e","observation_id":"1cd65838-db1c-445b-9122-7d74d18e990a","resolution":{"observed_at":"2026-08-04T06:23:52.192038Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.308771Z","title":"Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.308771Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:fe27d00b570fc6e62b54c38927f27fbf1799c669bade007dc3f5b0a0e47259b8","observation_id":"cd18919d-6262-4143-aa7c-e8fe0e780b10","resolution":{"observed_at":"2026-08-04T06:23:52.308771Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.438629Z","title":"Capital cost estimation for advanced nuclear power plants,","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.438629Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:8fcf6341059a4227495a54dcc0d6c74b72d4c48b4198bc0c9946c019bb32ebf9","observation_id":"e85e2cdd-d05e-43a1-a6fd-fb8be9ddfa9f","resolution":{"observed_at":"2026-08-04T06:23:52.438629Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.563242Z","title":"Construction schedule and cost risk for large and small light water reactors,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.563242Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:1db8a85a79b01510e4984920c00f51209f2b85e6685d976556e117b5916299f1","observation_id":"86c847a3-be97-416b-80f7-4f4c53263d64","resolution":{"observed_at":"2026-08-04T06:23:52.563242Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.717866Z","title":"Why Does Nuclear Power Plant Construction Cost So Much?,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.717866Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:e429bc70056aa6c807c0054d8c910079f17403e3b63c632d89506f0778e0ea38","observation_id":"4e8e1656-e038-473a-a5d4-3cd185801573","resolution":{"observed_at":"2026-08-04T06:23:52.717866Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.851262Z","title":"Will Claims By Contractors on Big Design -Build Projects Ever End?,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.851262Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:649527f70fb28ae372987a6b0b2ab1aa6b3c64afaa29fa30e74175c9155be457","observation_id":"82b4de8f-b892-407b-b218-94bdabcd66ff","resolution":{"observed_at":"2026-08-04T06:23:52.851262Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:52.962468Z","title":"Plant Vogtle's contractors sue Georgia Power, project's co -owners,","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:52.962468Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:fb6f32bf91f507867172a1c46fcb0165e9b4ac161d3e3957fc194bb0375eec1d","observation_id":"3b8edb5c-fbb1-4e48-b8f2-32b4d59f5318","resolution":{"observed_at":"2026-08-04T06:23:52.962468Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.012024Z","title":"V.C. Summer Nuclear Generating Station Units 2 & 3 Project Assessment Report,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.012024Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:1a4a78fc1f86be646684ce559c89dc029970ce8825b9545879608f78c82a03fa","observation_id":"c7c1131d-7fb7-48cb-97f5-38e0d5386bbe","resolution":{"observed_at":"2026-08-04T06:23:53.012024Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.108168Z","title":"Exhibit (K_P -2): Bechtel Report Issues as Discussed in Prior Quarterly Reports and Testimony and in Correspondence From and With ORS,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.108168Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:157a5f9cd5754f6b95ce3dcb424d61d845aa884a203be37133563dacbfac6214","observation_id":"e7ab985c-ff04-40a4-9666-a563e85f0021","resolution":{"observed_at":"2026-08-04T06:23:53.108168Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.250953Z","title":"Schedule-Based Construction Incentives,","venue":null,"work_id":null,"year":1989},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.250953Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:385fcf69c03af3752c561a64d3faef3ab0076d9f5a1fb5bc7c6605dcdf5a7043","observation_id":"5495007f-2be6-4d4a-865c-0fa1f0fca079","resolution":{"observed_at":"2026-08-04T06:23:53.250953Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.407888Z","title":"Flyvbjerg and D","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.407888Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:7cdc692fab2e736f15ee0e3f90228d217cd8c3e6c09827ccd7ff0b4096233954","observation_id":"a0f47a9e-ac0d-4969-b316-0ee74e948bf6","resolution":{"observed_at":"2026-08-04T06:23:53.407888Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.567220Z","title":"2024 Total Cost Projection of Next AP1000,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.567220Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:6ea7f16229c25e89c9f4685853b52f9be5812bc9f40b3b488af224067c61a9de","observation_id":"a48e9fd7-e145-476e-9eaa-bf726c6871bf","resolution":{"observed_at":"2026-08-04T06:23:53.567220Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.713552Z","title":"Pathways to Commercial Liftoff: Advanced Nuclear,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.713552Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:f6aa3bd7f65cd7ccce8911e96a09b5a6075410d342134fd066ad0ae7dc4c57b0","observation_id":"a8d213d8-a3df-4f4a-9be7-90c8d76d30b6","resolution":{"observed_at":"2026-08-04T06:23:53.713552Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:53.914608Z","title":"Analysis of GW-Scale Overnight Capital Costs,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:53.914608Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:7f2a9b8ae0b56c4ac8a4ead940a41c67a3c525001505057104813354aac56777","observation_id":"323cdd4e-ec75-42e9-916c-7fb651bc6d15","resolution":{"observed_at":"2026-08-04T06:23:53.914608Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:54.102884Z","title":"Laying the Foundation for New and Advanced Nuclear Reactors in the United States,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:54.102884Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:f98d57aa6ef681399d0964bd2391254be30dbf056fbf5adddddb8f8523af4841","observation_id":"71f913d6-a6ee-4adf-a995-a446be0b2ebc","resolution":{"observed_at":"2026-08-04T06:23:54.102884Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:54.243607Z","title":"A Generalized Nuclear Code of Accounts for Cost Estimation Standardization,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:54.243607Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:ad27693fa8a2627422133efc59c8fc556fe119cb3446f1077b9b1c7873b6faa4","observation_id":"315b211e-cf3e-470f-996e-e3962773ff1d","resolution":{"observed_at":"2026-08-04T06:23:54.243607Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:54.296894Z","title":"Technical Reference Book for the Energy Economic Data Base Program,","venue":null,"work_id":null,"year":1984},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:54.296894Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:bbec1c0e33b366d6aefc9ea8dc4652a24c14520fc7e2b5609bb15c181b9a7e9b","observation_id":"faa7fe4f-3c4a-4327-a174-46251e6f7e88","resolution":{"observed_at":"2026-08-04T06:23:54.296894Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-04T06:23:54.433418Z","title":"Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,","venue":null,"work_id":null,"year":1980},"citing_paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-04T06:23:54.433418Z"},"links":{"citing_paper":"/paper/2601.14558"},"observation_digest":"sha256:3aa3b63100e32a4718c0e4819251b572f395d7449c88ca6b4dab495bab7fac3b","observation_id":"b6aa8c02-0baf-48c3-afcf-b17d73a11d6c","resolution":{"observed_at":"2026-08-04T06:23:54.433418Z","resolver_source":null,"status":"malformed_identifier"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2601.14558","last_updated":"2026-08-02T16:50:25Z","latest_version":2,"primary_category":"econ.GN","snapshot_observed_at":"2026-08-10T17:36:06.077219Z","submitted_at":"2026-01-21T00:53:50Z","title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring"},"reference_resolution":{"displayed":27,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":26,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":27},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 27 of 27 outbound references and 0 inbound Pith citation observations for arXiv:2601.14558."}