{"as_of":"2026-08-19T14:04:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:ee782877e2e9148087aefe3ea8b8c61b18ecab706556b02022e530f0312b3ccd","coverage":[{"denominator":11,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":11,"source":"paper_references, paper_reference_links","source_observed_at":"2026-05-15T01:05:20.231043Z","state":"measured"},{"denominator":11,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":11,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-19T06:32:44.657259+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2604.21932/citation-record","integrity":"/paper/2604.21932/integrity","json":"/paper/2604.21932/citation-record.json","paper":"/paper/2604.21932"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Expert systems with applications 186, 115736","venue":null,"work_id":"cac0d0ce-d62a-4cb1-8fda-b486d0ec5494","year":2023},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:191f90654fcaccda44a74b357c27c8298b3e14953b797c823c4a6d0ea042ed34","observation_id":"cfdb692f-dbff-4889-bf61-21d4dad8e371","resolution":{"observed_at":"2026-05-15T01:09:37.617757Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"by Swain and Guttman","venue":null,"work_id":"97edadb7-4e43-4598-ad58-cb81dc77ac0a","year":2020},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:2ad398e1dd14dfa18b69cc53e9d9950ced4a0448327149499cb8bcb8e02e7461","observation_id":"18c02b6f-e4aa-44bc-b7d2-fc5d11aa9d7d","resolution":{"observed_at":"2026-05-15T01:09:37.615700Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Nuclear Engineering and Technology 57, 103253","venue":null,"work_id":"94ac981f-c69b-45c5-87e6-11bc1f72e3b1","year":2015},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:fe41583555998cefa444df2177fd24693f26594ed125d8899fa5af734344f8dd","observation_id":"14b57dcb-aa5d-427d-ace5-81010eb852b9","resolution":{"observed_at":"2026-05-15T01:09:37.626354Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Reliability Engineering & System Safety , 112330","venue":null,"work_id":"0e28a511-a7f0-4d85-9b61-80a22aeac91c","year":2026},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:d548a9e8643b27d074761a421b0b9d60c8c7e21e5a61bc14047f5811a164d417","observation_id":"0e5d7034-22a3-40a6-a1d6-2eda5123a25f","resolution":{"observed_at":"2026-05-15T01:09:37.611710Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Technical Report","venue":null,"work_id":"e3432c26-b1f3-44b6-9c44-50dc112789f5","year":2000},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:a5bd2e4ca58dfb78626d681c350e25437093c45d6d091f60905842ef4065937f","observation_id":"3ebecc5c-186f-4f33-be0d-a101fc23f1b7","resolution":{"observed_at":"2026-05-15T01:09:37.613733Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Technical Report","venue":null,"work_id":"7483ad0f-d8b0-4d96-bef9-a74baed225c1","year":2025},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:85bde75d0355af24c0a94fac6a8d73241eb601438f2c87242ed93df25b4a444e","observation_id":"6cc07679-cdff-4e97-ba1b-0aefe786b632","resolution":{"observed_at":"2026-05-15T01:09:37.619871Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Nuclear Engineering and Technology 54, 2037–2047","venue":null,"work_id":"c7c3a4bd-1b79-4f53-9808-01e2d76d8c4f","year":2037},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:e58cf0326597a26c51821db8832b7b8918596e338f7c166a3f1de652694e89bf","observation_id":"0839bc90-8a98-443c-930d-460422871dc5","resolution":{"observed_at":"2026-05-15T01:09:37.609525Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Reliability Engineering & System Safety 194, 106415","venue":null,"work_id":"b70d5965-d481-43db-94f3-01c85bb2dc97","year":2022},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:146bedbfed6cda6a370cfb66b46abee4a60737a26b1a1c36a35a51792b94cf5e","observation_id":"c8da62eb-2bc1-4b54-ac6f-7fdefe695572","resolution":{"observed_at":"2026-05-15T01:09:37.624124Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Reliability Engineering & System Safety , 112488","venue":null,"work_id":"a6d21bc8-7d7c-48a6-8d58-39cc5f234fa4","year":2024},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:6f05414957b3f445850e4f1b2745faa3f0a82e737126032a6c351f8436adc835","observation_id":"9b26a9e6-ce68-4fb1-91b2-e113bc3b9b0e","resolution":{"observed_at":"2026-05-15T01:09:37.628645Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2506.18727","last_updated":"2025-05-26T14:02:18Z","snapshot_observed_at":"2026-08-18T16:06:19.270795Z","submitted_at":"2025-05-26T14:02:18Z","title":"AutoGraph: A Knowledge-Graph Framework for Modeling Interface Interaction and Automating Procedure Execution in Digital Nuclear Control Rooms","version":1},"cited_work":{"arxiv_id":"2506.18727","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2506.18727","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Adynamicrisk-informedframeworkforemergencyhumanerrorprevention in high-risk industries: A nuclear power plant case study","venue":null,"work_id":"c2b58e3a-6ddb-4a38-bd22-26148d22386c","year":null},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"cited_paper":"/paper/2506.18727","citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:c1fedd1611a014ae3d3b2dfecef0ea53515a21a6110dd70ae2ddfa562beb5614","observation_id":"8a594d5a-a5bb-4561-bdbb-589e58ff0928","resolution":{"observed_at":"2026-05-15T01:08:25.886079Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Springer, pp","venue":null,"work_id":"b8303b1b-e5ae-4856-9cca-0185d557b8b6","year":2026},"citing_paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-05-15T01:05:20.231043Z"},"links":{"citing_paper":"/paper/2604.21932"},"observation_digest":"sha256:79bbf5c3180797328601ee81a41daf95201a52034a00375bc186743a5b3ab42c","observation_id":"cc0f8c30-d85e-4441-ae75-5475d0e0b870","resolution":{"observed_at":"2026-05-15T01:09:37.622009Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2604.21932","last_updated":"2026-03-23T07:31:13Z","latest_version":1,"primary_category":"cs.HC","snapshot_observed_at":"2026-08-02T19:59:34.230089Z","submitted_at":"2026-03-23T07:31:13Z","title":"Quantifying Interface Procedure Coupling Risks in Digital Nuclear Control Rooms: An Event Based Human Reliability Assessment"},"reference_resolution":{"displayed":11,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":1,"verified_fuzzy":10},"total_outbound_references":11},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"thesis":"As of 19 August 2026, this Paper Citation Record lists 11 of 11 outbound references and 0 inbound Pith citation observations for arXiv:2604.21932."}