{"as_of":"2026-08-04T03:53:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:18235542731d37c5e53dcb71ecb0d497b60ebe19e33c6221d67a73a8b59a57c6","coverage":[{"denominator":38,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":38,"source":"paper_references, paper_reference_links","source_observed_at":"2026-05-08T17:22:34.567548Z","state":"measured"},{"denominator":39,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":39,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-03T06:30:56.289259+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-01T18:12:44.334634Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2605.03090","snapshot_observed_at":"2026-08-01T18:12:44.334634Z","title":"From barrier to bridge: The case for ai data center/power grid co-design,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.17391","last_updated":"2026-07-19T19:43:35Z","snapshot_observed_at":"2026-08-03T07:14:33.722004Z","submitted_at":"2026-07-19T19:43:35Z","title":"A Phased Development Framework Enabling Islanded Operation of Sustainable AI Data Centers With Onsite Grid-Following and Grid-Forming Energy Architectures","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-01T18:12:44.334634Z"},"links":{"cited_paper":"/paper/2605.03090","citing_paper":"/paper/2607.17391"},"observation_digest":"sha256:a2b76033f4859e6e57d18ab55df403241d7511c01650d83d16ea285fd463201c","observation_id":"754ab152-3348-45cf-be83-26d4aa40bc6b","resolution":{"observed_at":"2026-08-01T18:12:44.334634Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2605.03090/citation-record","integrity":"/paper/2605.03090/integrity","json":"/paper/2605.03090/citation-record.json","paper":"/paper/2605.03090"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"ce857c8f-1291-4ae3-a65c-b0462096e2d4","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:77dd899208d8fe8aec483e821668afb3bc1694d45095db63089840c06a1ccbc8","observation_id":"7c7b0c04-cbfa-4107-9ccc-c893a46227a9","resolution":{"observed_at":"2026-05-26T07:57:28.433993Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2019.The Datacenter As a Computer: Designing Warehouse-scale Machines","venue":null,"work_id":"4538f656-e692-40ce-84c2-1829bda2c110","year":2019},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:ee38066fd29a9b72e1c02f19f2a34c2e44c818fe74d863fb19d9385b1d764298","observation_id":"d483637b-dd04-4c2b-bad5-b555d00a5383","resolution":{"observed_at":"2026-05-26T07:57:28.424495Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1145/3472883.3487009","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-10T00:15:00.872479Z","title":null,"venue":null,"work_id":"10b11670-8c45-4096-b5ad-66791910ac5a","year":2021},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:7846c2d6da78776d423a76778e4b50f0e7ba456ef6c787560c20b91da04773c5","observation_id":"a050ca41-42ca-4e80-b0b4-6783f92b7e03","resolution":{"observed_at":"2026-05-08T17:23:40.243335Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2025.Today’s Outlook","venue":null,"work_id":"c23186b4-0a64-4837-9af2-755e0d08317b","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:e2d9d22f6f33b3330bcbb0a1fdaf0d8b072f18d890cd9bb9d9b76d6491d2ac18","observation_id":"8a23b702-3981-4308-a444-be11c172f728","resolution":{"observed_at":"2026-05-26T07:57:28.430795Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"d8778a87-fb58-43ae-94ce-35ab24a9b909","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:be3e01c2de5c69cbf4ec3a5998244fafadf00e30b7d7952bfd983b14f92b45ca","observation_id":"5a07d428-0757-4dc1-ad6a-c634aeffba6b","resolution":{"observed_at":"2026-05-26T07:57:28.438101Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2508.14318","last_updated":"2025-08-21T17:25:27Z","snapshot_observed_at":"2026-08-03T07:47:19.254404Z","submitted_at":"2025-08-20T00:04:06Z","title":"Power Stabilization for AI Training Datacenters","version":2},"cited_work":{"arxiv_id":"2508.14318","doi":"10.48550/arxiv.2508.14318","metadata_source":"pith","pith_arxiv_id":"2508.14318","snapshot_observed_at":"2026-07-10T12:15:01.137692Z","title":"Power stabilization for ai training datacenters","venue":"cs.AR","work_id":"6dcd418c-5d05-4f2d-bdcc-284f2f581ff4","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"cited_paper":"/paper/2508.14318","citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:57fd3cae604e92ee604a68e6a47cbcaf02961a9a54231a3ab3adab0bb341b3f2","observation_id":"ae25cc87-6b18-4489-b0a1-12323cfd9d14","resolution":{"observed_at":"2026-05-11T17:36:07.318550Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"c8695f5a-bae2-4dea-b412-c842244a56fb","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:f42cce477d3527456104532d83fa14a70cfe1e51c0ab8995c3d2616dabc99f37","observation_id":"b4c658bb-25c4-4e10-b691-e19521b1fb87","resolution":{"observed_at":"2026-05-26T07:57:28.423788Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"171f8530-0114-4fe0-aeb6-0c20545385da","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:2a9ce23472cee8ad6a0eb02b12e616edb4aa66bcce5eefe0cd76a58dccac300c","observation_id":"72790d8f-c408-44bb-912a-1f93ab145008","resolution":{"observed_at":"2026-05-26T07:57:28.421070Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"article/5527792","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"286934f3-c51f-411f-8860-36230bbd23ed","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:2bb244627902f925f3bb8d19826fd4473fe50e500550026f6cbd85efa98261ca","observation_id":"08f64bb7-5029-4c15-82ef-f4dbb419bb00","resolution":{"observed_at":"2026-05-11T17:36:07.327845Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"mil/0923202","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2025.Major energy rate case decisions in the US January-June 2025: Quarterly update on decided rate cases","venue":null,"work_id":"64ef32a4-8f36-4b81-b66e-a1ead712e3ee","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:24cad575f59c69bf65a2f497d453a1a8d52901334cfb90dd4a8a0c2f9e14c90a","observation_id":"a89bb755-d53d-473d-a99e-0cfa4f5ca20d","resolution":{"observed_at":"2026-05-11T17:36:07.332148Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"84c3b362-98fc-4288-8dd4-542ac5c63baf","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:8b597839a556192eab8cc2bd96f51e82bb33eee45e7c222da4d57f049d289c66","observation_id":"9a9e2d02-6256-4dbc-9ce5-14b94afb8eac","resolution":{"observed_at":"2026-05-26T07:57:28.434280Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"cffeb597-3de4-4022-b73e-debf2568e504","year":null},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:e3772b047814017f26ebf9c34e84699f8272c75911651503c1236f06e6709d5c","observation_id":"b7944c4b-13b8-463a-bf2a-eb1d5d7f7e97","resolution":{"observed_at":"2026-05-26T07:57:28.491138Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2022.Global EV Outlook 2022","venue":null,"work_id":"e8489ff7-94d8-460d-b9bd-1a5da4daa75c","year":2022},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:a87d8e188afbf11fca60586842e9f442acfe0824eea44897a5029c86b25f12a5","observation_id":"8e541965-ec26-4095-965b-2c81ca9a8151","resolution":{"observed_at":"2026-05-26T07:57:28.474281Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2023.Electricity Grids and Secure Energy Transitions","venue":null,"work_id":"22a11e07-479d-41ed-bb6a-569743a318ff","year":2023},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:49ef542747063641e5c84c72d33fdc783ee3a6f907d41573124422cfcc8586a0","observation_id":"6d3a2c3c-8c2b-4b43-9296-b71ca693ad77","resolution":{"observed_at":"2026-05-26T07:57:28.465495Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2025.Energy and AI","venue":null,"work_id":"c5c487d3-2015-4987-bd91-c63643a48db2","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:55d040184bbf430662f7b47bd2b928a8b5d0517bbf085b4103ad9fe0f9cdbf94","observation_id":"7a459cb4-d822-42c5-9f26-3ada99576b57","resolution":{"observed_at":"2026-05-26T07:57:28.468569Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1290.18512","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"741d1dba-79de-401a-911f-078dba87b5aa","year":2010},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:3a34c8fb9678cb346bc5143d6c5bb198baa2a2aeca62ef254625dbfe00506086","observation_id":"aa9b8a56-a31c-47fe-a23e-1292c0e95283","resolution":{"observed_at":"2026-05-11T17:36:07.296054Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1038/s41560-025-01927-1","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"ad0e5dd8-ec8e-417b-ac40-23b15cdf3048","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:529e036e603c4920db5437857158c35badad4619b41ee95f88e6a99f8e9c68ab","observation_id":"73f7e1e8-d483-49c2-8b33-ec5e1573a11f","resolution":{"observed_at":"2026-05-08T17:23:40.205170Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1145/3630106.3658542","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-10T06:15:00.866473Z","title":null,"venue":null,"work_id":"ed5c3220-7ce9-4f77-99d9-f9dfe1b0cd3a","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:bfd501154c94a322768f43f4de778a906763a44a2e33890373f11c1ec2b21cdd","observation_id":"951d7a2e-aa4c-43d3-9b45-f2b04abbb10a","resolution":{"observed_at":"2026-05-08T17:23:40.213007Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-07-13T07:50:11.333336+00:00","source":"crossref_status_cache"},{"observed_at":"2026-07-13T07:50:11.333336+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"86b59a75-b643-4e85-b8d9-83d7a4a5d548","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:648d666aa54327797dcc2c30b84e60bfc2f7b5c9967772c565b984081214c563","observation_id":"4d459163-5331-4520-8793-a7f7fcc36c03","resolution":{"observed_at":"2026-05-26T07:57:28.471327Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2024.Meta’s Richland Parish Data Center","venue":null,"work_id":"1ae3d62b-9d08-46e3-adc8-1661fc10d9e8","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:7687e15dd14ac843cf5eda59951e03b04ef2ba4f89276666f05fc03884ff65f2","observation_id":"b4d5b4f6-5494-4baa-b73c-6bec760b8f64","resolution":{"observed_at":"2026-05-26T07:57:28.477252Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"20daeced-b3c3-422a-aeb6-b7c3f6313d57","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:2078dc2626b672d1d4925042ce5ca49834bacb2d4bb9f48a55d1652519b43fcf","observation_id":"6ca80ab4-aa69-41a1-82ec-f759e70b5b0a","resolution":{"observed_at":"2026-05-26T07:57:28.484054Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"8fc0d1f9-3a6f-46a6-83b8-b5a2e14754d0","year":2022},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:9a0b7b8b2e5f5b8a2f0f39aecbe22da18374f3bb87017bdb09cb6f02bead3253","observation_id":"9500ec3b-33a2-415e-86c7-6bd871930dc9","resolution":{"observed_at":"2026-05-26T07:57:28.452945Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Norris, Tim Profeta, Dalia Patino-Echeverri, and Adam Cowie-Haskell","venue":null,"work_id":"8cb6d157-c01d-4cf6-8f46-c1d8c8b459c0","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:d90876aa8a862a30b4fe11cdb07aa7e7f96dc5235d812cd44487aeace4556701","observation_id":"fe4fade5-097c-4065-80a9-8aaf553fe09f","resolution":{"observed_at":"2026-05-26T07:57:28.462100Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2025.2025","doi":"10.4274/balkanmedj.galenos.2025.2025-3-83","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-11T11:50:26.030339Z","title":"Effectiveness and Safety of Lattice Radiotherapy in Treating Large Volume Tumors: A Systematic Review and Meta -Analysis","venue":null,"work_id":"0bc67c92-4f47-495f-b123-8835db5afe84","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:7c1cf3387c7d228a45b06e6c4cbdfc82e57d33c39d804b7e042d8c721284dd33","observation_id":"6f1b7227-b18c-4a03-82aa-36b4968586f2","resolution":{"observed_at":"2026-05-11T17:36:07.307298Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"db034176-1f91-46d2-abda-bb0395ac150a","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:88339d8dffd900cab923f8616b13b388918d6e62b846485b108484f7ccbe24e4","observation_id":"f958ea7c-4faf-4cec-86fa-f320c1419a87","resolution":{"observed_at":"2026-05-26T07:57:28.450279Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"2024.Stargate Advances with Partnership with Oracle","venue":null,"work_id":"3e91130d-305e-4815-97c6-d1181a528ba8","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:c219d6de114ac50e4239fbe6334bbccb056ba4ebcf3b8462ea3c151fd5e1b074","observation_id":"6b5cca0a-afcd-4e56-ac2f-26d0d2a140e7","resolution":{"observed_at":"2026-05-26T07:57:28.437410Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"d8b94652-0426-4187-a019-97c59e530f2a","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:b505cfaaeea98d432be6b6530c5521f4aa00c5a94c7864545c4933cd035ce389","observation_id":"7b3b32ab-bd0e-4d49-8239-47152ff595be","resolution":{"observed_at":"2026-05-26T07:57:28.458871Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"049a25b1-f3ac-4ffa-a913-e6667f650a51","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:23ec82418620acd906b3117ee3b3a979402ecaee200b74d9bde9dd7c236312e5","observation_id":"8ef3d35b-6677-42ba-be46-f87ac077ff4a","resolution":{"observed_at":"2026-05-26T07:57:28.456117Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"041b03ec-aa14-4a7a-a1ff-f5d9217e5318","year":2022},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:508bb18471a0346212f387352ceaf1beb09b5177a77e33b08d0789150d64c427","observation_id":"208a6670-bace-438d-81d7-69a7bec605b3","resolution":{"observed_at":"2026-05-08T17:23:40.220565Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Patterson, Garth Gibson, and Randy H","venue":null,"work_id":"8f98e4b7-7dae-4019-9a16-1fd29d2eb084","year":1988},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:99bfabfa061d8885f7f2a763b55ced059beda310f6fbb669ed333dd0eb5861a2","observation_id":"30ef9115-dad6-4e57-8047-4f7ff2dc2a13","resolution":{"observed_at":"2026-05-08T17:23:40.228526Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2025.2024","doi":"10.1109/cste62025.2024.00038","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-11T11:50:26.030339Z","title":"2025.2024 State of the Market Report for the ERCOT Electricity Markets","venue":null,"work_id":"9143f450-ed61-4cb0-a859-05eee3869164","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:1a4d0cae06920257e63b52a070d1a50f0c78758f12cd9f3029877c7a064aa096","observation_id":"4f78c3cf-23cd-42c9-a99e-fe6cbacd0a1f","resolution":{"observed_at":"2026-05-11T17:36:07.301420Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"fce94f8f-fbf1-42b4-9f8b-27b779a20c1e","year":2022},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:1bc2e47ec6d33ae48972a145c678074c21915aed0852520a1d7c3f34daaea6f8","observation_id":"c6c3f4a1-eec8-44da-9ec9-ac0cbb28a01b","resolution":{"observed_at":"2026-05-08T17:23:40.235893Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"28f3e835-ff57-43bf-9a33-a7311ac2aa72","year":2017},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:f0c4fe92caefa1caec0f2bf2d7032ac9e80ab0e98e7b7f1e20a0c626daddb3ad","observation_id":"be223dc7-b240-4663-9764-d768effddf46","resolution":{"observed_at":"2026-05-26T07:57:28.480881Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2024.2024","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-08T20:35:34.344260Z","title":"2024.2024 Generative AI Red Teaming Transparency Report","venue":null,"work_id":"459669c8-65f4-4244-be27-b50bc9b59a6f","year":2024},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:f649dffa397e3751b1c37c60a3c00c8f253df6e99f0276dea7ef39b5dede1f7f","observation_id":"f021dee2-1faf-4556-8272-7e7f31f68d45","resolution":{"observed_at":"2026-05-11T17:36:07.312079Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"6f316233-5b27-43ac-ba77-8c154c2a26c6","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:e9a576fb0ac3bd168ef4dc0c5cd0e38925fa49f1d33b4419272e4fe7b2048671","observation_id":"7bd18711-eb1c-4824-ab8d-21b64999c2bb","resolution":{"observed_at":"2026-05-26T07:57:28.487415Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"163e5dac-c434-45b0-abef-542db2a11aea","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:aba413fcef69d8b3a0858b4917ff1ca602c74e83f4099152ccbbed6e003b61d7","observation_id":"81b949c4-3f64-4a4f-85f7-b61c05b0ecdb","resolution":{"observed_at":"2026-05-26T07:57:28.446978Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Energy Information Administration","venue":null,"work_id":"33a886e6-7677-491d-ac93-5a04c5f11902","year":2025},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:a5ecac6a3f6eb7d1b5f1b4b9601c6db905c019905e81a44b40260611f99ada87","observation_id":"c665c239-8e56-4efe-b51a-02d0570fae30","resolution":{"observed_at":"2026-05-26T07:57:28.443652Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Lee Willis","venue":null,"work_id":"30bbe563-435f-443f-bad6-df2b977a39d7","year":2004},"citing_paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-05-08T17:22:34.567548Z"},"links":{"citing_paper":"/paper/2605.03090"},"observation_digest":"sha256:571e2f0c3c91bd8b04b3e1847524e5977f776f56f9e48fb5bb13478f445d30b3","observation_id":"1f5b7ac4-535c-4c5a-96b4-66261a1064c6","resolution":{"observed_at":"2026-05-26T07:57:28.440521Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-03T06:30:56.289259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2605.03090","last_updated":"2026-05-04T19:08:43Z","latest_version":1,"primary_category":"cs.DC","snapshot_observed_at":"2026-07-06T23:16:05.372336Z","submitted_at":"2026-05-04T19:08:43Z","title":"From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design"},"reference_resolution":{"displayed":38,"state_counts":{"malformed_identifier":0,"metadata_mismatch":2,"parse_uncertain":0,"unresolved":15,"verified_exact":11,"verified_fuzzy":10},"total_outbound_references":38},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-03T06:30:56.289259+00:00","source":"crossref"},{"observed_at":"2026-08-03T06:30:50.922721+00:00","source":"retraction_watch"}],"thesis":"As of 4 August 2026, this Paper Citation Record lists 38 of 38 outbound references and 1 inbound Pith citation observation for arXiv:2605.03090."}