{"as_of":"2026-08-22T22:42:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:85de7832ab9a3877bc006c478be13a55a7ba4f245b31f40c89a1f2351ea0c882","coverage":[{"denominator":16,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":16,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-28T17:38:41.185933Z","state":"measured"},{"denominator":16,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":16,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-22T06:32:14.747728+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2606.00723/citation-record","integrity":"/paper/2606.00723/integrity","json":"/paper/2606.00723/citation-record.json","paper":"/paper/2606.00723"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"The European X-Ray Free-Electron Laser Technical design report","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:c58a50a27611c8ffeac0673ddce06d212e5ba3dac2aae67f89da4dd07bac6425","observation_id":"981588f8-10bc-4022-b654-8a5ace558cda","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"hep-ph/0106314","last_updated":"2001-06-27T23:41:41Z","snapshot_observed_at":"2026-07-07T03:52:50.370755Z","submitted_at":"2001-06-27T23:41:41Z","title":"TESLA Technical Design Report Part I: Executive Summary","version":1},"cited_work":{"arxiv_id":"hep-ph/0106314","doi":null,"metadata_source":"pith","pith_arxiv_id":"hep-ph/0106314","snapshot_observed_at":"2026-07-01T20:56:13.737913Z","title":"TESLA Technical Design Report Part I: Executive Summary","venue":"hep-ph","work_id":"e3d7e025-6a16-40f3-90d9-fe54285d8dba","year":2001},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"cited_paper":"/paper/hep-ph/0106314","citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:a04ee04018a886321f41c6a0afc820299a15949110a4dd8463ff3749d933ec50","observation_id":"4e4b065b-e0b2-484b-824b-b43879e6dc81","resolution":{"observed_at":"2026-07-01T20:56:13.739145Z","resolver_source":"local_arxiv","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Sekutowicz, “Parameter Set for CW and Near -CW Operation of Superconducting Linac Driving a FEL Facility, TESLA -FEL Report -2006-08, DESY, 2006","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:6549d1e1f064d4980116107af1fff3696cf5d876497f28c7f2900ba9b5bda668","observation_id":"5e5b0e19-43bb-41f7-9aa1-993229870a16","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"contributions/2076609","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-07-01T20:56:13.740310Z","title":"Power Couplers, HOM Couplers and Tuners for the XFEL","venue":null,"work_id":"13bf5538-71e5-4fdc-b448-7b507c7db73f","year":2009},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:b159de760d6d419d7fd4f4b3f40446c4bde895991622bcd562e8684bcf145446","observation_id":"5257511a-eb7c-428d-901f-fab4e86a0d5f","resolution":{"observed_at":"2026-07-01T20:56:13.741750Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"A Beam Line HOM Absorber for The European XFEL Linac","venue":null,"work_id":null,"year":2005},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:a855cc383fb360cc92125e6222e78c5d61b10fb731e0dfb0e92d7cfe113b5289","observation_id":"b71783f0-4f33-4b48-89e8-14444e2b535d","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Beam Tests of HOM Absorber at FLASH,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:2ae62ccaaf754da5185b3ea3ef8c068cb090d855e38e85610b91aa958363d577","observation_id":"1126eb9e-233e-44be-8c0b-9d73b4da59ce","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Test Results of Components for CW and near- CW Operation of a Superconducting Linac","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:4de2da2739fa59115fe53d83f52b7c0de9397463ffc7013820ac4d2b5b7189f9","observation_id":"68daf0c9-6a66-4e0c-b508-4fe010814dd4","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Second cw and LP operation test of XFEL prototype cryomodule","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:5ed4b9fbeafa6b84b62087f72f6c3093f186efc8843c3180849c6f766056d95b","observation_id":"3647e79a-7caf-437e-9de5-50981abf73aa","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"LLRF system design and performance for XFEL cryomodules cw operation","venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:995c850ff25ae8671d29c60ab070aa6ba17a592ab6d2b8dd68706e2871896e79","observation_id":"da7f9b3c-1039-4334-a093-6bf20f622428","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Feasibility of CW and LP Operation of the XFEL Linac","venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:c9abdd7a12b637cf4b226763deccdaa1972b6f6c210cd2991ad0a6c0569271ed","observation_id":"125b2e15-7a54-46b7-a890-0ec29ba6b0ec","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1103/physrevstab.18.05","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:42:24.742397Z","title":"Research and development towards duty factor upgrade of the European X-Ray Free Electron Laser linac","venue":null,"work_id":"0b14969b-89a9-4293-b326-ee0a62da314b","year":2015},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:77530dde9318b945239fe441e39c228a7e32bc5b6ceeca59b55fa79af7cdcb68","observation_id":"6250ff94-b6b4-4111-b2ba-ac757500a342","resolution":{"observed_at":"2026-06-28T17:42:24.743928Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Status of Cryomodule Testing at CMTB f or CW R&D","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:b21bd1343295ba260f2c9ed82c4d8b1f1e0bdf8d544e9a77d75bbf0beadf77a4","observation_id":"3e5458a1-490b-4bc5-87df-be22231156cd","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Integral Resonance Control in Continuous Wave Superconducting Particle Accelerators","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:5de89726be404f2be225a5bd14c3aabe6d23e0ece2f97504e475f775f59d1f22","observation_id":"928a8623-75fb-4814-855e-9d071bf635fd","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T17:38:41.185933Z","title":"Long Pulse Operation of t he EXFEL Cryomodule","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:c62300733063369c94c78f06ad0c68e313c21e028d904693590c65e1418063f0","observation_id":"1d518174-3dd9-4487-9cda-5d0c0e871ce2","resolution":{"observed_at":"2026-06-28T17:38:41.185933Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2507.01658","last_updated":"2025-07-02T12:40:47Z","snapshot_observed_at":"2026-08-07T11:55:08.083638Z","submitted_at":"2025-07-02T12:40:47Z","title":"Cathodes and Shape Modification of Cavity for DESY Superconducting Photoinjector","version":1},"cited_work":{"arxiv_id":"2507.01658","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2507.01658","snapshot_observed_at":"2026-07-01T20:56:13.742867Z","title":"Cathodes and Shape Modification of Cavity for DESY Superconducting Photoinjector","venue":null,"work_id":"98808b31-ac67-4256-af0b-e94b72ee3d07","year":2025},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"cited_paper":"/paper/2507.01658","citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:288a5022e0c483eef4877ee177eab119d744f475a7b8921cae48beb270d30d6d","observation_id":"fc3193ea-a2f5-4dd2-a122-c7db9327ef06","resolution":{"observed_at":"2026-07-01T20:56:13.744340Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2310.02974","last_updated":"2023-10-04T17:10:49Z","snapshot_observed_at":"2026-08-19T18:08:51.282366Z","submitted_at":"2023-10-04T17:10:49Z","title":"High gradients at SRF photoinjector cavities with low RRR copper cathode plug screwed to the cavity back wall","version":1},"cited_work":{"arxiv_id":"2310.02974","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2310.02974","snapshot_observed_at":"2026-07-01T20:56:13.745451Z","title":"High gradients at SRF photoinjector cavities with low RRR copper cathode plug screwed to the cavity back wall","venue":null,"work_id":"975f7b1a-ac22-4e0d-bc19-5a67d6b2a0da","year":2023},"citing_paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-06-28T17:38:41.185933Z"},"links":{"cited_paper":"/paper/2310.02974","citing_paper":"/paper/2606.00723"},"observation_digest":"sha256:cdf26a030e5d0618b062591ac6b14a15c32c4fc40ccd82e9dadc77b22b283db5","observation_id":"c25451ae-448b-40ee-ae1e-76544b9600a4","resolution":{"observed_at":"2026-07-01T20:56:13.746969Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2606.00723","last_updated":"2026-05-30T13:32:24Z","latest_version":1,"primary_category":"physics.acc-ph","snapshot_observed_at":"2026-07-06T23:41:24.911421Z","submitted_at":"2026-05-30T13:32:24Z","title":"Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023"},"reference_resolution":{"displayed":16,"state_counts":{"malformed_identifier":0,"metadata_mismatch":1,"parse_uncertain":0,"unresolved":11,"verified_exact":4,"verified_fuzzy":0},"total_outbound_references":16},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"thesis":"As of 22 August 2026, this Paper Citation Record lists 16 of 16 outbound references and 0 inbound Pith citation observations for arXiv:2606.00723."}