{"as_of":"2026-08-18T11:25:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:89ac2b0452f06ccbb396ebcfe6eed05468fe88fac857f6f801e832b98055a998","coverage":[{"denominator":27,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":27,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-27T10:59:55.323874Z","state":"measured"},{"denominator":27,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":27,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-18T06:34:40.430872+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2606.10836/citation-record","integrity":"/paper/2606.10836/integrity","json":"/paper/2606.10836/citation-record.json","paper":"/paper/2606.10836"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Journal of hydrology , volume=","venue":null,"work_id":null,"year":2001},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:e9be768bd3834d8a5085fae37fd51edfeca74073b743e83088cd3465e11792bd","observation_id":"595977ab-7534-495d-9a7a-2ff2c469ef4f","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Journal of hydrology , volume=","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:7baf8e092754e867c52b533d8f890265dc45e9937fc667e20f9a948f9eecd09d","observation_id":"b182f4bc-eb9d-44af-bcea-49ad736dcae6","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2402.17702","last_updated":"2024-11-22T10:34:25Z","snapshot_observed_at":"2026-08-16T14:14:48.653956Z","submitted_at":"2024-02-27T17:27:47Z","title":"The SCIP Optimization Suite 9.0","version":2},"cited_work":{"arxiv_id":"2402.17702","doi":"10.48550/arxiv.2402.17702","metadata_source":"arxiv_reference","pith_arxiv_id":"2402.17702","snapshot_observed_at":"2026-07-10T06:15:00.866473Z","title":"arXiv:2402.17702","venue":null,"work_id":"a3c42063-f08e-4420-9673-8fb0cd8f81b5","year":2024},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"cited_paper":"/paper/2402.17702","citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:d134fe41a0da1249dfc1299b264bdb27c08dede7d14a8fb59755867c4b0818d5","observation_id":"c7f9c21f-85b2-4a1a-a16d-cf8f69780897","resolution":{"observed_at":"2026-07-03T08:07:45.534657Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Scientific investigations report , number=","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:b8a3ba795f0874e32cea4488c34427ebaaa17bd40797788ba1f9dfb4f4724db0","observation_id":"b2e02a16-d905-433b-905e-bfe30a72ac12","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Groundwater , volume=","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:a68f58d4eded607dc05010ebc60919406d8b554f8f9f13b113bc482776b5542c","observation_id":"1a91d333-d721-4f3e-adb9-064b284e751f","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Journal of Global Optimization , volume=","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:c4597f20637b2a8e2dd1a264d221dfe161ed92879f37e480d3ac50e7661d5714","observation_id":"b18e05fd-a4ef-4b9c-840f-1cbb64a2bcb3","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Mathematical Programming , volume=","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:5c5325c09d5653f46d6ec0d22b22c9d54b66d3c1ea5c1aa395cfafdc99133374","observation_id":"03408ba2-c174-4a26-b801-b7d971f5715f","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Water resources research , volume=","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:be94a4266274fc601035a1e21bfc3af40e8f67d47ad123ac6470bfcd5e0199b3","observation_id":"c4ef7e65-48f7-4a64-ae39-197e06f87b44","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Mathematical Programming Computation , volume=","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:dad773fed791c5425904e35e24522420b15f409bfb70bb720728404656000b37","observation_id":"f3385e05-add3-4c97-b817-7cb62a725280","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Advances in water resources , volume=","venue":null,"work_id":null,"year":1992},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:9e50d3d509cf81ef5b453af59f5f496c643995546856b1cab944f5b5cdd3fec9","observation_id":"57052235-f89b-4d40-879e-65e494bd43ee","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Water Resources Research , volume=","venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:b2bdd65a5f72a38c21879cec3ab225b0c79f1a75a1bb18e775fe9655fc91e54f","observation_id":"ae09f0ab-47e2-4333-942a-3768e42e6158","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Mathematical Programming , pages=","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:3bed6fec3c66c12c61ca665897edeb09d2c62646cce99f6e2b3792ddfb4c46cb","observation_id":"5005d7e5-d13c-48b2-b577-d33cd0350412","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Advances in Water Resources , volume=","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:ed0d88df89b7dee4ea6e8aabcd40ff4342d7dce631b8a660246b2e5af2dca2cb","observation_id":"bc743a19-8ec1-44c2-808a-b35b34b4194d","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Mathematical programming , volume=","venue":null,"work_id":null,"year":1976},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:273c4ae7ab6610de5ae8c381bd217e7ba3952ba69de925724df8782726934c36","observation_id":"70eaab2a-bb11-4b34-96e4-1fbd3399134c","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Water Resources Research , volume=","venue":null,"work_id":null,"year":1996},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:ed388f0840beb727e8aef6806d1fdf01e67cbdafa47c26f67b7b630c78fc4627","observation_id":"5daaeda5-caf4-41cc-b4e2-f5872a2826e5","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Waterlines report series , number=","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:4971232bcae6b635417f3fe285c676c0510827fd90fdacfd90885243f305c1f8","observation_id":"4ec5ef00-d7e4-4f28-8af3-c6e990519204","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Summary report of the national groundwater modelling uncertainty workshop , volume=","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:b52a1970137f51006b48184de4c2c6b551f27a25cf4535e7eb5111e63f029d5d","observation_id":"0ff3b267-f5ed-4752-a3ef-22390bd33500","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"2009 , publisher=","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:7e3a1aae3b520bbe5a83fc91b27fb332ea29abcc702dbaaf9586c431b2df3229","observation_id":"035626d8-ee99-42a7-9ad0-b697450b6d63","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.7717/peerj-cs.1516","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"2023, PeerJ Computer Science, 9, e1516, doi: 10.7717/peerj-cs.1516","venue":"PeerJ Computer Science","work_id":"c6a899ff-2205-4b0e-83cd-0d218b1cc919","year":2023},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:625f045dd0dd6f825281dd3efb2ac66599d4a1e9ed3663f54f0845f2029ac6eb","observation_id":"3da4dcd2-7b88-4599-a3dd-040a187d2873","resolution":{"observed_at":"2026-06-27T11:00:50.400422Z","resolver_source":"doi","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-07T21:08:21.34407+00:00","source":"crossref_status_cache"},{"observed_at":"2026-08-07T21:08:21.34407+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Water Resources Research , volume=","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:d0d12f982e5b90919df78c7c18e690aa95ce64cba7e52da357e67ae092bb8dbd","observation_id":"48fabb86-158a-4947-a118-58758e8ada61","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"6584.2007","doi":"10.1111/j.1745-6584.2007.00340.x","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Groundwater , volume =","venue":"Ground Water","work_id":"1f0f7994-ca0f-4240-ae10-3bf15bd4c8ef","year":2007},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:fc549e8aac2f734ae382952bc4955ee1e893e6ec32ab618b066f68420f97bff9","observation_id":"57ceeb7d-5a12-4dfa-b322-a114dcfe54e7","resolution":{"observed_at":"2026-06-27T11:00:50.398879Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Reviews of Geophysics , volume=","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:e7c9e6ba77675c99e795e075608510607bb4c9b5c6272c219b152f304b7584ac","observation_id":"6b91362e-5e2c-48bf-a4ba-38e8de7f07b5","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Journal of the ACM (JACM) , volume=","venue":null,"work_id":null,"year":2004},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:ff08c638ba6c534c2118648e0c22c9536382499c5f0e7841c7c203a3b505be85","observation_id":"c5e600be-390b-42ef-8d39-1ad2614cc718","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Statistics and Computing , volume=","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:2763e5f567450d09cfb8b6dd9ca588725ee323d4b2af3a7cd2dd54a39bc9e762","observation_id":"28f25d74-6241-4d59-92dd-a15b463c5b50","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Water Resources Research , volume=","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:f9463db3fc00e2baca17760e2f6b1a75996522a07cf847c39e28504c849a1ebd","observation_id":"15c701cf-914c-41e1-bf7c-e1c79ed47942","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Nature methods , volume=","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:2cfda4af9627ab1685ddd34f2f63081c23f5250a746b07a41ba9ff4a56190fc1","observation_id":"dca44816-4235-41cb-b616-a688cc86735c","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-27T10:59:55.323874Z","title":"Mathematical programming , volume=","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models","version":1},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-06-27T10:59:55.323874Z"},"links":{"citing_paper":"/paper/2606.10836"},"observation_digest":"sha256:45112dbda6a1954d2d8cc5b55342075bc943ad664a1a4a40becc6ff0159e84c6","observation_id":"f9fd0b54-0d5a-41ae-8fda-27bb33767c0d","resolution":{"observed_at":"2026-06-27T10:59:55.323874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2606.10836","last_updated":"2026-06-09T13:25:01Z","latest_version":1,"primary_category":"physics.comp-ph","snapshot_observed_at":"2026-08-15T23:54:57.682898Z","submitted_at":"2026-06-09T13:25:01Z","title":"Bounding the Null Space: Interval-Based Uncertainty Quantification for Non-Identifiable Groundwater Models"},"reference_resolution":{"displayed":27,"state_counts":{"malformed_identifier":0,"metadata_mismatch":1,"parse_uncertain":0,"unresolved":24,"verified_exact":2,"verified_fuzzy":0},"total_outbound_references":27},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"thesis":"As of 18 August 2026, this Paper Citation Record lists 27 of 27 outbound references and 0 inbound Pith citation observations for arXiv:2606.10836."}