{"as_of":"2026-08-13T06:36:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:d5fbb96d2e1a47f5b7cb70d94b81bd56935d151977256545f5abec6296c813f1","coverage":[{"denominator":26,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":26,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-02T11:48:30.993290Z","state":"measured"},{"denominator":26,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":26,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2606.12791/citation-record","integrity":"/paper/2606.12791/integrity","json":"/paper/2606.12791/citation-record.json","paper":"/paper/2606.12791"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.200181Z","title":"Grid structural characteristics as validation criteria for synthetic net- works,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.200181Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:0375d836df60b4e5a74d66fbceac111c96af9179a45583cf2d47adb4518bcb40","observation_id":"fe5fe0ec-34c8-475d-b68b-a097a815a339","resolution":{"observed_at":"2026-08-02T11:48:28.200181Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.328741Z","title":"A methodology for the creation of geographically realistic synthetic power flow models,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.328741Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:95d274ec650e13d19c5652165155ce7da88c480d68621bfe371459217deb7ed7","observation_id":"d7f1a7c2-f48f-4c28-a96e-1497d2770354","resolution":{"observed_at":"2026-08-02T11:48:28.328741Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.452379Z","title":"A metric-based validation process to assess the realism of synthetic power grids,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.452379Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:43c64d74e2f0ac01a83ac834c829c7d7f515ee0f1136eb223e004bfe704470ea","observation_id":"1808951b-8d05-40aa-824f-b6e31ef34ffa","resolution":{"observed_at":"2026-08-02T11:48:28.452379Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.561381Z","title":"Power flow convergence and reactive power planning in the creation of large synthetic grids,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.561381Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:56f980eda8451e6f477a64e17331a93c40b911ef79174dbc24b4a5373dba0616","observation_id":"4df85ef2-b437-4624-9009-2cb250e0d0f7","resolution":{"observed_at":"2026-08-02T11:48:28.561381Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.661852Z","title":"Application of large-scale synthetic power system models for energy economic studies,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.661852Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:5b66618bc99c80e7681b92483810af24ba38835df264fe705762dcdbadace106","observation_id":"d7bd78fa-66a5-4d35-add1-2f1c64ecadf1","resolution":{"observed_at":"2026-08-02T11:48:28.661852Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.765480Z","title":"Building and validating a large-scale combined transmission and distribution synthetic electricity system of Texas,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.765480Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:c6dba7974c15e83127af617463976ee5e181fea964b68598124fedb15932f317","observation_id":"219b604e-6435-45c1-9820-7f4186a14be8","resolution":{"observed_at":"2026-08-02T11:48:28.765480Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2411.14756","last_updated":"2025-02-04T13:34:12Z","snapshot_observed_at":"2026-08-13T03:24:19.897282Z","submitted_at":"2024-11-22T06:24:29Z","title":"KPG 193: A Synthetic Korean Power Grid Test System for Decarbonization Studies","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2411.14756","snapshot_observed_at":"2026-08-02T11:48:28.873282Z","title":"KPG 193: A synthetic Korean power grid test system for decarbonization studies,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.873282Z"},"links":{"cited_paper":"/paper/2411.14756","citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:d4c50a84631f8b9bc17f07c419e92bd5425eaf26ba1838ed560b1f09235ff2c7","observation_id":"4eaed332-2009-4a3f-ab34-b8131f74f963","resolution":{"observed_at":"2026-08-02T11:48:28.873282Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:28.989114Z","title":"pandapower—An open-source Python tool for con- venient modeling, analysis, and optimization of electric power systems,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:28.989114Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:fc37b2c686359d489303eac136e6bb85a1ffe7437c03396a275f8bf2ccceaa79","observation_id":"785f8ddd-ecfa-433a-aa20-4f1f38b81098","resolution":{"observed_at":"2026-08-02T11:48:28.989114Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.144122Z","title":"MAT- POWER: Steady-state operations, planning, and analysis tools for power systems research and education,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.144122Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:dea3b2d26cddd4ca05ce6c84d68c6554ecdaecdc9efe8ef42713e64dbb62bd0a","observation_id":"a96aa0f1-4de3-4ae0-a848-809f2e26b57f","resolution":{"observed_at":"2026-08-02T11:48:29.144122Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.242617Z","title":null,"venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.242617Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:efc802de5525e20f88bb45dc1c3d84d96b4f32e484688360c3d2d42b351013b0","observation_id":"f8f00d03-80d1-41a0-a242-51d3871fcf5e","resolution":{"observed_at":"2026-08-02T11:48:29.242617Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.370251Z","title":null,"venue":null,"work_id":null,"year":1994},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.370251Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:fd654d30d48b1164e4360d8c942150f72a17b5f6d7429ac5a38c701ea52b3823","observation_id":"e1b8ee31-55e2-4203-841b-147ae3367469","resolution":{"observed_at":"2026-08-02T11:48:29.370251Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.442110Z","title":"Kundur,Power System Stability and Control","venue":null,"work_id":null,"year":1994},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.442110Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:61c4dccad316556ca1b50af6a42bd42e7db4216080a94147855e3767e656ec29","observation_id":"401b7c45-7f26-4646-9828-6d48e6175580","resolution":{"observed_at":"2026-08-02T11:48:29.442110Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.600769Z","title":"Planet dump,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.600769Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:d62411d123d954da892774398c2b5cc6f358431a38e0e0b5bad2d120ae728cd8","observation_id":"2341f26c-d696-449b-9255-7d1e9fd962bc","resolution":{"observed_at":"2026-08-02T11:48:29.600769Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.711844Z","title":"Electric Power Statistics Information System (EPSIS),","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.711844Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:6d9815976e7b7b96dd6f7d785e2e0ac55a1f4b6a36ca4f71b6a645cf09115f78","observation_id":"adf3b75b-3117-43b0-95b0-96a62f0d3146","resolution":{"observed_at":"2026-08-02T11:48:29.711844Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.806854Z","title":"New and Renewable Energy statistics / regional deployment data,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.806854Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:e8b13c29ce8ece37d201898760237cf5e5d45eb9e99d06d6bf0d4a77df8b01b5","observation_id":"990de933-8041-499e-b9c8-d738983c3e47","resolution":{"observed_at":"2026-08-02T11:48:29.806854Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:29.894596Z","title":"Korea Energy Statistical Informa- tion System (KESIS): regional electricity consumption,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:29.894596Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:682078d765f65209f97f3d8a7c624c4b9427142224d726b51da5d5a44ad12e52","observation_id":"cbe29578-5809-457b-a514-6945811b9d77","resolution":{"observed_at":"2026-08-02T11:48:29.894596Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.019013Z","title":"Statistics of Electric Power in Korea,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.019013Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:699047792e275f9adecfad420e61d42e20b183ee0df21fc8ddd949ddb3d1bd06","observation_id":"7863ca29-e0c3-408e-a1e7-195a24347635","resolution":{"observed_at":"2026-08-02T11:48:30.019013Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.116861Z","title":"Expansion of renewable energy in Jeju and directions for stable power-system operation (in Korean),","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.116861Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:8f6ad58ee3a9d0a278b830ba2b29a4eaf09b187c3bae76204917d27f588b50c1","observation_id":"d019c2a6-16d8-4b9f-97b5-c7ec125b3795","resolution":{"observed_at":"2026-08-02T11:48:30.116861Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.201250Z","title":"Virtues of the haversine,","venue":null,"work_id":null,"year":1984},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.201250Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:8a9c454e7d06c1d75d128bee33507fe8c3214ad9f57e7d3ad014e8e373c846d1","observation_id":"260546a8-4cd2-42a2-97a6-662ec3ab4fda","resolution":{"observed_at":"2026-08-02T11:48:30.201250Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.346514Z","title":"Nearest neighbor pattern classification,","venue":null,"work_id":null,"year":1967},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.346514Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:3656782e89d025838e048c725cfd702f204ba308e811a1278a38f0733fdb24b2","observation_id":"eff8e82d-56e2-4dad-9c31-da0ae799e15e","resolution":{"observed_at":"2026-08-02T11:48:30.346514Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.460632Z","title":"Shortest connection networks and some generalizations,","venue":null,"work_id":null,"year":1957},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.460632Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:3d2bd440290deb061fa0fdf9122ede27d4044b37cab68a7f4e6ce228b2de79b2","observation_id":"2bb83a72-bc01-45b5-b9d6-f9fe671ba358","resolution":{"observed_at":"2026-08-02T11:48:30.460632Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.597728Z","title":"A note on two problems in connexion with graphs,","venue":null,"work_id":null,"year":1959},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.597728Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:52b13050f95a2288ca28c269cda59ebc615fb03402573d4450009c129a246c7a","observation_id":"0211ef38-4609-472e-b331-d497ffbab42a","resolution":{"observed_at":"2026-08-02T11:48:30.597728Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.735180Z","title":null,"venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.735180Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:b66c086a49a297601bcb0f29de589b8810855ea4ff02617b39755a90524db43c","observation_id":"922baadb-6dfa-427e-9ae5-8d07f29fe6a3","resolution":{"observed_at":"2026-08-02T11:48:30.735180Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.854935Z","title":"The GIST 2217-bus test system: interactive grid map,","venue":null,"work_id":null,"year":2064},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.854935Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:1ca94fa656898594ce12554bbbc3aa7b5f1f154acc65d814d507ccf014130f52","observation_id":"307f2737-d7c4-40a7-9106-80f4e1a4bf21","resolution":{"observed_at":"2026-08-02T11:48:30.854935Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.905076Z","title":"Power flow solution by Newton’s method,","venue":null,"work_id":null,"year":1967},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.905076Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:b126d6fa3166ec9d5a2eeecd2607c36b25296e2f4da3606c03681da3a0f0e731","observation_id":"3b5046bf-cf0c-4708-a048-2d18cec7fa30","resolution":{"observed_at":"2026-08-02T11:48:30.905076Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T11:48:30.993290Z","title":"The GIST 2217-bus Korean power-grid test system (dataset),","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid","version":3},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-02T11:48:30.993290Z"},"links":{"citing_paper":"/paper/2606.12791"},"observation_digest":"sha256:b08d856df33ae828858abeafb81172b205fad8ab7709be27a1265c0d99e06a9a","observation_id":"aefa7610-a4a2-41a0-bae7-3f899edcf03d","resolution":{"observed_at":"2026-08-02T11:48:30.993290Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2606.12791","last_updated":"2026-07-29T06:52:01Z","latest_version":3,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-08T04:57:49.050587Z","submitted_at":"2026-06-11T01:15:14Z","title":"The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid"},"reference_resolution":{"displayed":26,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":26,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":26},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 26 of 26 outbound references and 0 inbound Pith citation observations for arXiv:2606.12791."}