{"as_of":"2026-08-20T12:03:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:4fe5d7fa6381cfb22270f2f4d57a9fb8f4121a7d7d7b44b53f21bf1d6f87e5ec","coverage":[{"denominator":15,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":15,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-26T07:05:10.379361Z","state":"measured"},{"denominator":16,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":16,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-20T06:33:59.587034+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-07-11T17:36:31.266505Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2606.23586","snapshot_observed_at":"2026-07-11T17:36:31.266505Z","title":"Two-stage optimization for dynamic line rating and energy storage deployment,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.04545","last_updated":"2026-07-05T23:26:11Z","snapshot_observed_at":"2026-08-03T22:38:41.813907Z","submitted_at":"2026-07-05T23:26:11Z","title":"Storage as a Transmission Asset (SATA) for Large-Load Congestion Relief","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-07-11T17:36:31.266505Z"},"links":{"cited_paper":"/paper/2606.23586","citing_paper":"/paper/2607.04545"},"observation_digest":"sha256:9663299baf1b5e044b1525ff52513bfc97632443595a46d469a50d9a52f50147","observation_id":"e782214e-ac09-4e78-9b0b-fae6f298b27e","resolution":{"observed_at":"2026-07-11T17:36:31.266505Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2606.23586/citation-record","integrity":"/paper/2606.23586/integrity","json":"/paper/2606.23586/citation-record.json","paper":"/paper/2606.23586"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Queued up: Characteristics of power plants seeking transmission interconnection,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:e80ebe02d293f541c56349637867151a64f05abb425058d6f434bc6eebf446b2","observation_id":"2ccf1219-931e-4f26-bb2a-9362cb7a2737","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Queued up...but in need of transmission,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:1650a28d74752c70d71646fec96c2e40db1dabdd6def29d056541bbbf5567426","observation_id":"b77f26e6-92ae-437c-93e6-b0d8527481cb","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"IEEE Standard for Calculating the Current-Temperature Rela- tionship of Bare Overhead Conductors,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:d005060f19f5f83da3981e57de2edb3e8f8f6b789900a5a80d03ecef8d6d1ad8","observation_id":"9078d867-c590-431f-a9c9-3a0d45aa04b2","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Leveraging the existing German transmis- sion grid with dynamic line rating,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:8ea033a7db6d107a221d4245ca8960e53ea7017ea44d476fc1ccbf2e96c6329d","observation_id":"4b356b4b-a299-471c-b895-837ef1839564","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Impacts of dynamic line ratings on the ERCOT transmission system,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:7195a85ea738f245260a926e53383861a67b4cb1891f2a251ce75fbe3c521814","observation_id":"77ea7e4b-7bf1-46b4-b6c5-2d5c3ceb7c5d","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Two- stage optimization framework for dynamic line rating implementation,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:20069fefb8c623764e368b41f0c991d670a276f51d74927caf5cd66d3f5700d4","observation_id":"9711ac32-3e92-46d8-8b8b-52fd26a6c9b8","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Dynamic rating of transmission lines, transformers, traps and current transformers,","venue":null,"work_id":null,"year":2002},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:bd34388b6feaf663b885ff66a4465c34265bf69c2cc06406fb5db489673315f6","observation_id":"fdd26c76-e296-42c4-9c50-dc68786e23d8","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Energy storage integration for grid reliability,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:22f4c0b99244242801c28f4285fa55db107f0353408d146567625cbd9f9d005b","observation_id":"caf730a3-7727-4105-ae9d-9aa3c1c5550c","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Energy storage as a service: optimal sizing for transmission congestion relief,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:1bcc29a2a5bba2688980f772b898c839ee3f295cd8b01dd867511cea405be2a2","observation_id":"91bed22f-6633-4a4d-ac3f-21895df49eb8","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"The role of energy storage with renewable electricity generation,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:6269aaecd26b029e1549dd0e1d52390bf26974bd451a959511ec9b5fdda1bde3","observation_id":"2c9e4588-d124-4869-b501-0b117a121377","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Optimal siting and sizing of energy storage system for power systems with large-scale wind power integration,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:68bea360d67a675e67bc591d55cc4a1b095d5eb273e8ceaad713c2f9367e1412","observation_id":"1f7df350-3dd5-4249-ad79-bc17b2ddd454","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Understanding the benefits of dynamic line rating under multiple sources of uncertainty,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:2ccfeb79ad8ba992c16043ecf74c7fa69e62a8edebe23112060429266961863a","observation_id":"c02aebad-ad85-4715-aa75-861842613e7e","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"National Solar Radiation Database (NSRDB) Data Viewer","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:2aaed66e2433a97e928843f51ff8de40bd66ae17d5708ad2a07543bb2d3caf71","observation_id":"6e85cdaf-9102-48cb-bfc7-48a007e6328a","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Development of a new procedure for reliability modeling of wind turbine generators,","venue":null,"work_id":null,"year":1983},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:de867138e995b90f7684e04160ea22862dfb6dd4fce18155ed2df98d8ed49477","observation_id":"701da70d-152b-4c0b-84ff-c19df4ca5f24","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-26T07:05:10.379361Z","title":"Pulp: A linear programming toolkit for python","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-06-26T07:05:10.379361Z"},"links":{"citing_paper":"/paper/2606.23586"},"observation_digest":"sha256:1f5b4c0a843a1a152501398b41fb8efdbb222ae652d8c2c137ed26e55eacb508","observation_id":"42bf6d99-08bd-4f36-b1d3-0786a06686b4","resolution":{"observed_at":"2026-06-26T07:05:10.379361Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2606.23586","last_updated":"2026-06-22T16:56:02Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-03T10:11:01.263907Z","submitted_at":"2026-06-22T16:56:02Z","title":"Two-Stage Optimization for Dynamic Line Rating and Energy Storage Deployment"},"reference_resolution":{"displayed":15,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":15,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":15},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"thesis":"As of 20 August 2026, this Paper Citation Record lists 15 of 15 outbound references and 1 inbound Pith citation observation for arXiv:2606.23586."}