{"as_of":"2026-08-08T17:40:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:97917c27538dfc232ddd7570d56849d6ed1f01b2c6acc9b2a0accd259ca73889","coverage":[{"denominator":53,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":53,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-02T09:48:48.911833Z","state":"measured"},{"denominator":53,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":53,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2607.16249/citation-record","integrity":"/paper/2607.16249/integrity","json":"/paper/2607.16249/citation-record.json","paper":"/paper/2607.16249"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:44.724413Z","title":"and Horspool, N","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:44.724413Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:b5d1f9b11c6d53a98811423d48dc7087db1cc9e34710157cbdf649a1b2edd67f","observation_id":"150361b3-adb4-4e79-9f88-4310120adebe","resolution":{"observed_at":"2026-08-02T09:48:44.724413Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:44.772214Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:44.772214Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a590c7de60b0aafa6085555ada35138ece68e310789cae97a6aa9ab2be39caa2","observation_id":"af2e801b-a2b2-4b73-8125-0646529b635b","resolution":{"observed_at":"2026-08-02T09:48:44.772214Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:44.881696Z","title":null,"venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:44.881696Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:269457886f4ebbd78ed25327047acdbb24777d1b20ac5f2ddd5bb5092ef5b85d","observation_id":"fff0b5e4-b745-409a-b038-f131ca3fc973","resolution":{"observed_at":"2026-08-02T09:48:44.881696Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.029580Z","title":null,"venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.029580Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:345d571547f3e10e76dc8a530e33187118e17cb5cc95ef7e62fd3387babb6524","observation_id":"c20ba03a-0470-41a6-aefd-5c610583bdf0","resolution":{"observed_at":"2026-08-02T09:48:45.029580Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.093145Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.093145Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:804ca8bb9698abcf7d25d6520975dea9c5668a45905db9ed6661d071d46734be","observation_id":"fb84a293-6bdf-4855-9637-8a212ec7fffb","resolution":{"observed_at":"2026-08-02T09:48:45.093145Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2604.21910","last_updated":"2026-04-23T17:52:52Z","snapshot_observed_at":"2026-07-06T23:08:23.939574Z","submitted_at":"2026-04-23T17:52:52Z","title":"From Research Question to Scientific Workflow: Leveraging Agentic AI for Science Automation","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2604.21910","snapshot_observed_at":"2026-08-02T09:48:45.152153Z","title":"and Orzechowski, M","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.152153Z"},"links":{"cited_paper":"/paper/2604.21910","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:75d44a57e81602cf284e500c5f838e340d492e670752256dbd62bd5bac4f4e6e","observation_id":"9c50087d-6c5c-4396-8a8c-4ffb1a26f74c","resolution":{"observed_at":"2026-08-02T09:48:45.152153Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.279736Z","title":"and Bao, Y","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.279736Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:841bd56ef8b5dc4c487be02e95dca1df27301263eb97f4cd077745a3576bc893","observation_id":"2fc7c8cd-5b27-4e6b-ad6b-d0f14862f4f8","resolution":{"observed_at":"2026-08-02T09:48:45.279736Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2410.18792","last_updated":"2024-10-25T09:00:07Z","snapshot_observed_at":"2026-07-06T19:39:06.300432Z","submitted_at":"2024-10-24T14:47:25Z","title":"An LLM Agent for Automatic Geospatial Data Analysis","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2410.18792","snapshot_observed_at":"2026-08-02T09:48:45.309904Z","title":"and Wang, W","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.309904Z"},"links":{"cited_paper":"/paper/2410.18792","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:b4428d4db8755f8702a79cbd1b4f3104d206b76bea904a3174aec6521b530f4e","observation_id":"a3e07ebe-5a77-41c3-9eea-aba6a4e08407","resolution":{"observed_at":"2026-08-02T09:48:45.309904Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.360444Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.360444Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:0132c561575fd657dfed7e43a949a0096c646149f7979c0b70f1483ed1c231c6","observation_id":"3f823688-18fe-41db-b0c6-68df63b4f990","resolution":{"observed_at":"2026-08-02T09:48:45.360444Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.514747Z","title":"and Despotaki, V","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.514747Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a7a8e2e715e965b2822af5f366a1c8b9f117872d2038db1343f37edade773a32","observation_id":"dfbaeae8-6853-4b83-8b0c-fcbefd14e7b6","resolution":{"observed_at":"2026-08-02T09:48:45.514747Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.586674Z","title":"and Dabbeek, J","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.586674Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:670e76605dae5bfaf6bff23d9cff37cfe7b09a1d42704f8798e64494f5223646","observation_id":"d19c9609-d463-492f-a4d3-edf1a73951bf","resolution":{"observed_at":"2026-08-02T09:48:45.586674Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.645290Z","title":"and Crowley, H","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.645290Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:2462ba6df75f898758bc0b1dbe583f30c0951e8c0d25e82fc4782210af2a6fbc","observation_id":"d56955d1-99de-4282-ad19-b3302637dc2f","resolution":{"observed_at":"2026-08-02T09:48:45.645290Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.735805Z","title":"and Giardini, D","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.735805Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:068c029ae0f130d2f84add4a53f9c9f46a9c35c0d91e38ad591aadf04d24f49b","observation_id":"842e2f13-6283-4049-8c55-563a5db96656","resolution":{"observed_at":"2026-08-02T09:48:45.735805Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.799844Z","title":"and Ngiam, J","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.799844Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:9d906b34903abc5fab751b5ac049ceb2782e94d8c7c9c61f65680913b6cc0462","observation_id":"cd8e4dd0-9048-4caa-9525-5f9236960756","resolution":{"observed_at":"2026-08-02T09:48:45.799844Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:45.884520Z","title":"and Lv, Z","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:45.884520Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:860e1938dab81af5d27e2231bb9a02729d36aa3975f9a94c27090a63e1cbf919","observation_id":"7fb156b2-cc16-4e0d-acc1-58272447b1da","resolution":{"observed_at":"2026-08-02T09:48:45.884520Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.010261Z","title":"and Diks, I","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.010261Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:21c5365b04033498c09ce3c71bda0b7e80bf5eafa3a2208cad54feba4b553c3b","observation_id":"76b74ea4-7851-4c51-a9c3-5b557b955438","resolution":{"observed_at":"2026-08-02T09:48:46.010261Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.091296Z","title":"and Liu, J","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.091296Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:9a160cf4311c304b097bed9120f147ff5230b898e2c6c8648c48e23fbcbdb7aa","observation_id":"819ab0e3-1c64-484d-9694-3b139442b083","resolution":{"observed_at":"2026-08-02T09:48:46.091296Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2503.08979","last_updated":"2025-03-12T01:00:05Z","snapshot_observed_at":"2026-08-07T17:11:27.264097Z","submitted_at":"2025-03-12T01:00:05Z","title":"Agentic AI for Scientific Discovery: A Survey of Progress, Challenges, and Future Directions","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2503.08979","snapshot_observed_at":"2026-08-02T09:48:46.135510Z","title":"and Nanavati, J","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.135510Z"},"links":{"cited_paper":"/paper/2503.08979","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:c54fb8377ae9c09853141b38d724be70076c57aba69f5fa939bbf7b0b4d3ced7","observation_id":"c5a3c3a1-80b6-4f54-946b-1fd82b9e3bbb","resolution":{"observed_at":"2026-08-02T09:48:46.135510Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.184970Z","title":", title =","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.184970Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:cb98a2958158ca1c86ac18ded3d92bc083517ed6e9c0665438011e2fec4bb9f8","observation_id":"0cd5645f-89c5-4c10-a761-4cb1ad04ebdf","resolution":{"observed_at":"2026-08-02T09:48:46.184970Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2602.14878","last_updated":"2026-05-31T05:10:10Z","snapshot_observed_at":"2026-08-02T23:04:25.658810Z","submitted_at":"2026-02-16T16:10:11Z","title":"Model Context Protocol (MCP) Tool Descriptions Are Smelly! Towards Improving AI Agent Efficiency with Augmented MCP Tool Descriptions","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2602.14878","snapshot_observed_at":"2026-08-02T09:48:46.251428Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.251428Z"},"links":{"cited_paper":"/paper/2602.14878","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:fa277110c1484e94cc6348e1621d7458a49b626ba4f1d44d46a7807bcdec3715","observation_id":"1a0582b4-cce3-4c1e-810e-d740b6bfd70b","resolution":{"observed_at":"2026-08-02T09:48:46.251428Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.312332Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.312332Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:494164605f3dd181235e6492decc39d577d00b370f688c1d6ce50aa8a376007d","observation_id":"9842c88d-a6c1-4e19-aaa4-fee916a05d18","resolution":{"observed_at":"2026-08-02T09:48:46.312332Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2503.23278","last_updated":"2025-10-07T07:13:32Z","snapshot_observed_at":"2026-07-06T21:00:55.979837Z","submitted_at":"2025-03-30T01:58:22Z","title":"Model Context Protocol (MCP): Landscape, Security Threats, and Future Research Directions","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2503.23278","snapshot_observed_at":"2026-08-02T09:48:46.401675Z","title":"and Zhao, Y","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.401675Z"},"links":{"cited_paper":"/paper/2503.23278","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:c87bc67ec230e001606cafd1708937048bc63b280a8373bea02b07e4db9a0b78","observation_id":"a2ce6923-18f8-4e1a-a229-dd6e615ff292","resolution":{"observed_at":"2026-08-02T09:48:46.401675Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.435388Z","title":"and Lin, T","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.435388Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:effcb3b78987d99cd80011ea20cc7e3254dc7f42c2e108fb3736e73f720e0daa","observation_id":"127d6006-8683-4d9b-a370-5422c728e3e6","resolution":{"observed_at":"2026-08-02T09:48:46.435388Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.496654Z","title":"and Li, C","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.496654Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:c79581fd3de08713006089392a83416c18a83a7c5a90871fd959049f5ee77667","observation_id":"70da75e4-d5a6-409b-85eb-c8f40beb2d74","resolution":{"observed_at":"2026-08-02T09:48:46.496654Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.565149Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.565149Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:45ee97ace2b13faf89d14aff542c039fe9ccb5bf5d51c9e391ca3bd19a2001f9","observation_id":"de7f3067-b264-40ec-ba16-0cbf790021c3","resolution":{"observed_at":"2026-08-02T09:48:46.565149Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.627846Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.627846Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:be2ece1a5080bac2bce3c466593c4bdb1ca6af50c6c389ccbfaec4d610f1579e","observation_id":"a248aa7f-0f41-41c1-abed-ba940505ccca","resolution":{"observed_at":"2026-08-02T09:48:46.627846Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.647005Z","title":"and Jost, A","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.647005Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:3b163289c7a9ff890320001f43b677cea8f2f312ac403df896a30ebeec76d1e4","observation_id":"2f5a3b61-e2ec-4f1c-9cd1-0abfc4692eda","resolution":{"observed_at":"2026-08-02T09:48:46.647005Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.715988Z","title":"and Luzi, L","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":28,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.715988Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:1ca2968f1e33075668ce74b65da667de0a1a3d84f32b7c73ec572e5cd502d2e1","observation_id":"8ed6bf52-edab-4605-a7ed-29f5272e5007","resolution":{"observed_at":"2026-08-02T09:48:46.715988Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.759608Z","title":"and Gatti, F","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":29,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.759608Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a2e9fc9627a40f5dd551b4543687648f2d33b7bdabf21e5a65e477d1a6655184","observation_id":"f2bff695-fd56-44cf-8e6f-2139573494c2","resolution":{"observed_at":"2026-08-02T09:48:46.759608Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2506.06355","last_updated":"2025-06-02T22:07:53Z","snapshot_observed_at":"2026-08-07T11:24:34.488207Z","submitted_at":"2025-06-02T22:07:53Z","title":"LLMs as World Models: Data-Driven and Human-Centered Pre-Event Simulation for Disaster Impact Assessment","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2506.06355","snapshot_observed_at":"2026-08-02T09:48:46.854749Z","title":"and Li, D","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":30,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.854749Z"},"links":{"cited_paper":"/paper/2506.06355","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:e09ebc8a7f6fc702bde7a6a1c880bc56ba3e2e4467b761104f64489a75a33586","observation_id":"6d1b634b-c1e5-42b5-9af9-cb631b29c750","resolution":{"observed_at":"2026-08-02T09:48:46.854749Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:46.952035Z","title":"and Fu, X","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":31,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:46.952035Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:c2479d391e8311535bc3f9ae370c880f1c88907b1a6bf64f35139d10eee95244","observation_id":"c6ddea87-9ecf-4958-8d4d-e4983edf4042","resolution":{"observed_at":"2026-08-02T09:48:46.952035Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.027017Z","title":"and Zhou, Y","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":32,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.027017Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:d1fa3ccab1daa44633215553eb5fdf39886df10114d36b7f8aa123f29b81ff67","observation_id":"159d4b36-400e-47ba-8459-bdae05665555","resolution":{"observed_at":"2026-08-02T09:48:47.027017Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.147847Z","title":"and Ning, Y","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":33,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.147847Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:6ca41263f5a07009e67bad97550e0e98250c9429e7145088f528a49d70986f89","observation_id":"567c834c-f7e9-440a-acea-58a5d5374b3e","resolution":{"observed_at":"2026-08-02T09:48:47.147847Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.221160Z","title":"and Qu, R","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":34,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.221160Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:3d46cc9ad11831ee3cfa2ca1b850d6337e9de87cb7324efdc6cccba7eccea2c9","observation_id":"535e349f-a3de-4880-b35e-160989dd246c","resolution":{"observed_at":"2026-08-02T09:48:47.221160Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.284733Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":35,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.284733Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:ac9f121266f42f2b545d8e16104ce52f5467b3d9cba55f2738c57a629f79fe35","observation_id":"8d5af6a1-fb12-430d-ac72-a381dbe36e95","resolution":{"observed_at":"2026-08-02T09:48:47.284733Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.354739Z","title":"and Silva, V","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":36,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.354739Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:bb545d23d1075fa98ecabd0f09854dc278fa907459bace2620210b99c2681f27","observation_id":"15a744c3-bc3a-4ec6-aefc-2561b791e770","resolution":{"observed_at":"2026-08-02T09:48:47.354739Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.472181Z","title":"and Lanzano, G","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":37,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.472181Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a9d09e64362fb989d4dda91a835ae1f38746b30c64b25af95acb58e3a80f390e","observation_id":"84df6396-eff3-4e60-baf9-eb1555914f97","resolution":{"observed_at":"2026-08-02T09:48:47.472181Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.594738Z","title":"and Monelli, D","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":38,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.594738Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:68880ce17c25f81d9181c91a0daae48c8e9e2d2c67b551c1f05e270fb313ebb9","observation_id":"5c87b960-7c55-45ab-9a5d-e2af386ce739","resolution":{"observed_at":"2026-08-02T09:48:47.594738Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2508.18489","last_updated":"2025-08-25T21:02:33Z","snapshot_observed_at":"2026-08-06T14:03:04.189786Z","submitted_at":"2025-08-25T21:02:33Z","title":"Experiences with Model Context Protocol Servers for Science and High Performance Computing","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2508.18489","snapshot_observed_at":"2026-08-02T09:48:47.720766Z","title":"and Chard, R","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":39,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.720766Z"},"links":{"cited_paper":"/paper/2508.18489","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:58820e0e801c9fc0ec284f5132d1be06f07acf6b88ef314a6f1f5514d642254f","observation_id":"0afd6060-af57-4f54-9dcf-0c4510feebdf","resolution":{"observed_at":"2026-08-02T09:48:47.720766Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.815882Z","title":"and Shapkin, B","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":40,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.815882Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:cdd2a21d8fcfc13adea20fe7c8727a7bfc540f75f431a764ea52d4af459de5aa","observation_id":"7447fcbf-19ea-4990-bf3d-ab169397a322","resolution":{"observed_at":"2026-08-02T09:48:47.815882Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.874490Z","title":"and Cotton, F","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":41,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.874490Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:26be72050dd783a115b8c4ac477092e7c820cb7c43bf3704ffc4a8ca38099a87","observation_id":"e04cc4f6-91b7-477c-b990-792e4b7b75c6","resolution":{"observed_at":"2026-08-02T09:48:47.874490Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:47.929566Z","title":"and Gatti, F","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":42,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:47.929566Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:8739e7987555b6c10f75eebed320394b560e1c92f2d2d4823ca936dcf2741c67","observation_id":"86649d1f-7315-42bf-9120-949b3542a1c7","resolution":{"observed_at":"2026-08-02T09:48:47.929566Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.026194Z","title":"and Podili, B","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":43,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.026194Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:0ba66d8dc896882447a7cc4ab388979db24f8e1ff5657645b6022246387a9429","observation_id":"00c1c047-93c8-486e-8a5e-b95100075be5","resolution":{"observed_at":"2026-08-02T09:48:48.026194Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.133423Z","title":"and Cotton, F","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":44,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.133423Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:86e56422d79ce167cca14aaac26cf1c5101597eeb91c6fb791a629ad8da7f340","observation_id":"1a23d8be-3b2f-4529-a856-f147e18ec9a8","resolution":{"observed_at":"2026-08-02T09:48:48.133423Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.157863Z","title":"and Cotton, F","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":45,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.157863Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:d10e203b5ccff995ffa7d2db780b5e3eb724eee55bc95a8bdfc030abdd592cf0","observation_id":"ba4f7613-4b3b-46f6-a2ea-271db5ada5d0","resolution":{"observed_at":"2026-08-02T09:48:48.157863Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.214976Z","title":"and Kotha, S","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":46,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.214976Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:6960b05ac5867c671bf69e384bf981130d30bb1450955160396efdd7cae794b7","observation_id":"03b1bdc2-5308-4ab7-a983-dbff5b2ade11","resolution":{"observed_at":"2026-08-02T09:48:48.214976Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.314749Z","title":"and Crowley, H","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":47,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.314749Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:e6d55a87bd7d701595701aec0494b87dd459f0af9cf4d70530c3a5b47cc39d3d","observation_id":"5864a5c8-a23d-455a-9cf6-db9906177ecf","resolution":{"observed_at":"2026-08-02T09:48:48.314749Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.414034Z","title":"and Chen, Z","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":48,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.414034Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:880160e1abebdcad3a5ab7ac9de330e4d4249ecebcbecdf5a7dda50a5e7bf5bd","observation_id":"eaa0eabc-3384-4a4f-b68e-9f94dc7be00f","resolution":{"observed_at":"2026-08-02T09:48:48.414034Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.484560Z","title":", title =","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":49,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.484560Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:f32d1d02559bd848bd149357a0db3ca3d740dcd7d21fb36d2e616d51ea2ff8de","observation_id":"1d7a5efd-9b90-4abf-892c-ac37f78911e0","resolution":{"observed_at":"2026-08-02T09:48:48.484560Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.574762Z","title":"and Feng, C","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":50,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.574762Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a8ce0b64ed1537f7f768cb8dc2ff028630c3dc9462a9981b6de1b536163040b6","observation_id":"af5196ae-cf25-4e19-a67f-3d80ee2a332c","resolution":{"observed_at":"2026-08-02T09:48:48.574762Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2508.02936","last_updated":"2025-08-04T22:26:50Z","snapshot_observed_at":"2026-08-06T04:52:16.162428Z","submitted_at":"2025-08-04T22:26:50Z","title":"AQUAH: Automatic Quantification and Unified Agent in Hydrology","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2508.02936","snapshot_observed_at":"2026-08-02T09:48:48.674751Z","title":"and Li, Z","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":51,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.674751Z"},"links":{"cited_paper":"/paper/2508.02936","citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:5b42573989ecff2cca707c357c97360dc2eaa8bc3c3463567176695e114b2421","observation_id":"1a70e480-4876-471d-8bea-8aa46cc048d7","resolution":{"observed_at":"2026-08-02T09:48:48.674751Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.842161Z","title":"and Wang, Z","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":52,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.842161Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:a4989d6f638062d960015f9da3facf8d6029374cd6429e868f1aa4c88f5f9fa1","observation_id":"19df468c-d487-4ec0-82d7-ea0a5064a2a8","resolution":{"observed_at":"2026-08-02T09:48:48.842161Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-02T09:48:48.911833Z","title":"and Tang, Y","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis","version":1},"reference_index":53,"source":"arxiv_source","source_observed_at":"2026-08-02T09:48:48.911833Z"},"links":{"citing_paper":"/paper/2607.16249"},"observation_digest":"sha256:1c357ac51303767b9673514560565d9f016271bd6dc0f4d949a7e40a01fab594","observation_id":"9f5013ce-77df-44e1-954e-8158ce4e676c","resolution":{"observed_at":"2026-08-02T09:48:48.911833Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2607.16249","last_updated":"2026-06-27T02:29:11Z","latest_version":1,"primary_category":"physics.geo-ph","snapshot_observed_at":"2026-08-07T18:39:05.218779Z","submitted_at":"2026-06-27T02:29:11Z","title":"An Agentic Interface for End-to-End Probabilistic Seismic Hazard and Risk Analysis"},"reference_resolution":{"displayed":53,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":53,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":53},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 53 of 53 outbound references and 0 inbound Pith citation observations for arXiv:2607.16249."}