{"as_of":"2026-08-22T23:32:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:a654097e3aa07edc397da8ca34e9e7ab8399414f4a75d66f236d483a97559cae","coverage":[{"denominator":26,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":26,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-01T03:07:46.856208Z","state":"measured"},{"denominator":26,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":26,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-22T06:32:14.747728+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2607.25235/citation-record","integrity":"/paper/2607.25235/integrity","json":"/paper/2607.25235/citation-record.json","paper":"/paper/2607.25235"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.793340Z","title":"Innovation and technology characteristics of beidou-3,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.793340Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:d430bc5ca7c9a16b1dd773264305d52f09c294db88c9761754e009c1bd68addd","observation_id":"387a968f-ec49-4419-a96d-461d4673f21f","resolution":{"observed_at":"2026-08-01T03:07:46.793340Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.797135Z","title":"General design of the third generation beidou nav- igation satellite system,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.797135Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:7247450837a5a40011fba15446c962070032376df3f4d34762c0da888c6302fd","observation_id":"80deaef1-4a0b-4ed5-a852-78ba12a808db","resolution":{"observed_at":"2026-08-01T03:07:46.797135Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.799813Z","title":"Engineering innovation and the development of the bds-3 navigation constellation,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.799813Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:b30df1280e255ac93ef404d4262a160f89ea11d28697356eaad0b40d0a269c4f","observation_id":"14201a31-0ff5-4f1c-bdd3-bb7cd9a2148d","resolution":{"observed_at":"2026-08-01T03:07:46.799813Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.802362Z","title":"Time transfer by laser link: data analysis and validation to the ps level,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.802362Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:72f292616fa119adff68b169622e22c671228d2458941cd91d4054a8f706b921","observation_id":"16f10907-a227-41ff-8eec-ebf6fd0c2a4b","resolution":{"observed_at":"2026-08-01T03:07:46.802362Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.805071Z","title":"Cooperative time synchronization via laser/radio inter-satellite links in navigation constellations,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.805071Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:6d7e106c1cbab8ee3826e2446fe343804a87c79b68c48edd7e0a52c3eca80bbe","observation_id":"2f1e7848-1322-4339-b993-d96befdd4ff2","resolution":{"observed_at":"2026-08-01T03:07:46.805071Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.807478Z","title":"Precise point positioning with kepler,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.807478Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:973ab34fe4802f8e855fc318f1d55b388b1655151ef8cde7cf812a470f3ba8af","observation_id":"757a2f3e-f644-4fab-98cb-2969d8abce05","resolution":{"observed_at":"2026-08-01T03:07:46.807478Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.810321Z","title":"Study on integrated technique of laser ranging and communication and its applications in deep space,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.810321Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:6a75c3ae16739fb8a8056a484be4967a702b6a185fb8c0802d43f711cef17351","observation_id":"445dabe0-d31b-40ab-89ac-f98165184e0e","resolution":{"observed_at":"2026-08-01T03:07:46.810321Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.812764Z","title":"Advanced technologies for satellite navigation and geodesy,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.812764Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:941c6d6f7772c416df799a9d917bf1fcc29415d04ef21343e29f797448c9bb62","observation_id":"d7240abb-2fae-4ab4-b08c-097f07f97397","resolution":{"observed_at":"2026-08-01T03:07:46.812764Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.814930Z","title":"Laser communications in space i optical link and terminal technology,","venue":null,"work_id":null,"year":2007},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.814930Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:670d9ee872504ad2f4136bab752dbda55682571996f5db2efc675ec8b5c1008e","observation_id":"231bc0d4-322f-435e-9b24-d4b0e57dc64c","resolution":{"observed_at":"2026-08-01T03:07:46.814930Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.817397Z","title":"Inter-satellite link assignment for the laser/radio hybrid network in navigation satellite systems,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.817397Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:affebfda65a08718026a36a5ec02f8ed926b55241455a51c6ac4e7021aa61869","observation_id":"b090f9fb-182e-4e09-a352-6b999e2ea4f5","resolution":{"observed_at":"2026-08-01T03:07:46.817397Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.819757Z","title":"Contact plan design for gnss constellations: A case study with optical intersatellite links,","venue":null,"work_id":null,"year":1981},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.819757Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:87b0173596e3c16b7c66f3a4dacca56bf0ed8519aeff357f9d156a0e79c59ff8","observation_id":"a67d70fe-5b4b-4f41-b1d6-38aa08a14bb2","resolution":{"observed_at":"2026-08-01T03:07:46.819757Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.822226Z","title":"Topology design algorithm for optical inter-satellite links in future navigation satellite networks,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.822226Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:1d4b972894fd3c4a697bd8dc9b3050ca1f9a359a60e6ba57379628f3b9c9e075","observation_id":"d396871a-ed8f-4236-8661-e5b75a8e963c","resolution":{"observed_at":"2026-08-01T03:07:46.822226Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.824680Z","title":"Contact plan design for cross-linked gnsss: An ilp approach for extended applications,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.824680Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:d5e4d364099ef38ffe7da2f121723bedfba91c6645de2694402e3ca213ee9fe9","observation_id":"3d2d83c2-a669-42bb-a118-b6ca9b2cd61a","resolution":{"observed_at":"2026-08-01T03:07:46.824680Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.827053Z","title":"Demand and key technology for a leo constellation as augmentation of satellite navigation systems,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.827053Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:84db587294531001fa3712a6766dd2ad5e89ca75222b875944219b688f1e4a99","observation_id":"50b68307-56f1-46d3-9f6c-3f5293f97a7b","resolution":{"observed_at":"2026-08-01T03:07:46.827053Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.829550Z","title":"Joint contact planning for navigation and communication in gnss–libration point systems,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.829550Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:179e42c7548d7574054fe5c8f15e1e7f51d0fa900a01d157afcdf1f8a2225fe4","observation_id":"a178b735-21c0-4c17-956d-528ad5928272","resolution":{"observed_at":"2026-08-01T03:07:46.829550Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.831840Z","title":"Fsa-based link assignment and routing in low-earth orbit satellite networks,","venue":null,"work_id":null,"year":1998},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.831840Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:74449b3a1cb4a146fad7569bbc7fb0ed3240c995c4b09421d372cd53821e4e59","observation_id":"aacf0109-4ff1-472a-912e-f5b944de6a8a","resolution":{"observed_at":"2026-08-01T03:07:46.831840Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.834135Z","title":"Distributed contact plan design for gnsss,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.834135Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:8b7bba35b859a11be474210d8176788ae23f3758f8da877270c8b287a422594a","observation_id":"88974996-4e02-48e7-944e-d37c7e0193c4","resolution":{"observed_at":"2026-08-01T03:07:46.834135Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.836844Z","title":"Design challenges in contact plans for disruption-tolerant satellite networks,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.836844Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:226f7ef0ded8d83d4db689c4134ecd55fcb3ed1b6eed2c3f6b7a93d10dc9cee3","observation_id":"9fce45ae-fd21-48cb-ba04-df21e0f7cdc6","resolution":{"observed_at":"2026-08-01T03:07:46.836844Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.839172Z","title":"Bds-3 perfor- mance assessment: Pnt, sbas, ppp, smc and sar,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.839172Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:3525edcc9b7364eb829069f36217d6f587a9e8e062a7f82f6ba087a689ff0faf","observation_id":"52315dbf-3002-4ef0-a0d6-0dc730636d62","resolution":{"observed_at":"2026-08-01T03:07:46.839172Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.841829Z","title":"Inter-satellite time synchronization and ranging link assignment for autonomous navigation satellite constellations,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.841829Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:64189c1316ab354b7ad41dd9a1082df53239d42e89a8f3834434a6ecbe2054e1","observation_id":"f892070a-8a5b-4ecd-bf40-b95ad76338df","resolution":{"observed_at":"2026-08-01T03:07:46.841829Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.844425Z","title":"Launch list,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.844425Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:9d80152cce58587c7d70697602af813d4481c25b551f40969355c5dbb662c14b","observation_id":"9de6fa23-24d1-4315-8fa1-1ecb1370aca0","resolution":{"observed_at":"2026-08-01T03:07:46.844425Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.846775Z","title":"Beidou-3,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.846775Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:81ffe18dfce935fdff7c66585c328f1431cb6184eaeb68565404e4aa383f7f97","observation_id":"50038cf2-90c8-4978-90cd-56ada49e4845","resolution":{"observed_at":"2026-08-01T03:07:46.846775Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.849143Z","title":"Atmospheric effects on satellite–ground free space uplink and downlink optical transmissions,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.849143Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:3093e63a3ff309c987e640adfeceab76e7c432734a9d3e7d49ab48c8ad5e81c7","observation_id":"6855c03a-61fb-478d-ac87-23c09c980923","resolution":{"observed_at":"2026-08-01T03:07:46.849143Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.851496Z","title":"Optimized contact plan design for reflector and phased array terminals in cislunar space networks,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.851496Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:2af74e6ec13f27a78f5fb89477bda2aaa119d3ce6e58f7030f5083f64c7dd8ee","observation_id":"36850347-1fdf-460b-aac5-5d7c8973dc3f","resolution":{"observed_at":"2026-08-01T03:07:46.851496Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.853786Z","title":"From earth to orbit: Launch sequence optimization for LEO mega- constellations,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.853786Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:a855f7b1eecdec42cfe7a3c10e69385c9ba3d7f487f8e9866dda667391be1b2d","observation_id":"ef3aafb3-f74d-4754-83b5-bd84aac2e13e","resolution":{"observed_at":"2026-08-01T03:07:46.853786Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-01T03:07:46.856208Z","title":"A high-speed laser backbone node deployment approach for next-generation gnss,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-01T03:07:46.856208Z"},"links":{"citing_paper":"/paper/2607.25235"},"observation_digest":"sha256:f967f7b84ae29bcd3d896464dcdfad3bd747b329ea12065c51195e3aab98c62e","observation_id":"65628022-7a44-4881-bcdf-03d8242781f1","resolution":{"observed_at":"2026-08-01T03:07:46.856208Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2607.25235","last_updated":"2026-07-28T03:23:19Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T13:51:20.376424Z","submitted_at":"2026-07-28T03:23:19Z","title":"Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations"},"reference_resolution":{"displayed":26,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":26,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":26},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"thesis":"As of 22 August 2026, this Paper Citation Record lists 26 of 26 outbound references and 0 inbound Pith citation observations for arXiv:2607.25235."}