{"as_of":"2026-08-08T10:39:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:1e64a3753ac703cde553c72cb982b98dbeac32ab24a8e5aab008d3d2a31ab3f2","coverage":[{"denominator":18,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":18,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-03T14:28:22.013528Z","state":"measured"},{"denominator":18,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":18,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2607.29058/citation-record","integrity":"/paper/2607.29058/integrity","json":"/paper/2607.29058/citation-record.json","paper":"/paper/2607.29058"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:20.853824Z","title":"2603.29199 , archivePrefix =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:20.853824Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:5963d421f3710b7d2e0c011c5a12c954046c29dd44f4d80e13f789d61e2c3d8b","observation_id":"1816648b-eb94-497b-a44d-5cb307a5e18c","resolution":{"observed_at":"2026-08-03T14:28:20.853824Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2607.15418","last_updated":"2026-07-16T19:44:03Z","snapshot_observed_at":"2026-08-07T13:53:25.986787Z","submitted_at":"2026-07-16T19:44:03Z","title":"DrawingVQA: A Real-World Benchmark for Multi-Depth Visual-Textual Reasoning on Construction Drawings","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2607.15418","snapshot_observed_at":"2026-08-03T14:28:20.930744Z","title":"2607.15418 , archivePrefix =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:20.930744Z"},"links":{"cited_paper":"/paper/2607.15418","citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:1275464ed03cafcfad3e4f899257b1859cea92abd7e47bb6741ffc70cac3815e","observation_id":"3ef6c10b-1baa-424e-825a-831dbc143560","resolution":{"observed_at":"2026-08-03T14:28:20.930744Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.059712Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.059712Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:f2ed9e76888a9d8e6df8d040b024380735e9c65c7ce0cd210172fa114b831716","observation_id":"1d35b4e1-9a0e-40c9-9234-050850c1dd9e","resolution":{"observed_at":"2026-08-03T14:28:21.059712Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.185061Z","title":"2024 , eprint =","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.185061Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:af650073b888106a424b8f9b6626953fb40b4ee077cc5d3660680f1c359b30a2","observation_id":"b603032a-4539-4a2c-aa86-c479fc6c6221","resolution":{"observed_at":"2026-08-03T14:28:21.185061Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2411.04952","last_updated":"2024-11-07T18:29:38Z","snapshot_observed_at":"2026-07-06T19:46:54.707852Z","submitted_at":"2024-11-07T18:29:38Z","title":"M3DocRAG: Multi-modal Retrieval is What You Need for Multi-page Multi-document Understanding","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2411.04952","snapshot_observed_at":"2026-08-03T14:28:21.243790Z","title":"2411.04952 , archivePrefix =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.243790Z"},"links":{"cited_paper":"/paper/2411.04952","citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:4c8324ddd557d1e2ff20bdbc002f05f6f75345024cece8831beb79834df7357e","observation_id":"3cb8f18f-4f33-49d9-a1b6-0ed6457041ef","resolution":{"observed_at":"2026-08-03T14:28:21.243790Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2407.01449","last_updated":"2025-02-28T08:51:57Z","snapshot_observed_at":"2026-07-06T18:39:43.472708Z","submitted_at":"2024-06-27T15:45:29Z","title":"ColPali: Efficient Document Retrieval with Vision Language Models","version":6},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2407.01449","snapshot_observed_at":"2026-08-03T14:28:21.313300Z","title":"International Conference on Learning Representations , year =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.313300Z"},"links":{"cited_paper":"/paper/2407.01449","citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:3de3fb55587d531d3702e2ee0e7fb4d910d0e0458250e18e323031dcd977452d","observation_id":"8b02e412-60e0-4a47-880d-dc403e5bc83b","resolution":{"observed_at":"2026-08-03T14:28:21.313300Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.365853Z","title":"2022 , doi =","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.365853Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:36ab1992e960f4d4feb34f89ff7ebe0eb7bb9198b865b54431f16ba382c9d7d7","observation_id":"df44352a-14e5-4a0e-b91f-91923669f528","resolution":{"observed_at":"2026-08-03T14:28:21.365853Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.413445Z","title":"2022 , doi =","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.413445Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:b6424584e2afd560ab803bf269c95db0cca2ac1fbea2e466cde39c155e238165","observation_id":"8737ac50-c8eb-4459-ab19-d0fec88e0584","resolution":{"observed_at":"2026-08-03T14:28:21.413445Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.508948Z","title":"Automation in Construction , volume =","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.508948Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:4fcbb961fa30fbb451e0f6e847d4d33cdcbd18f985af8e5656e295870cc77d24","observation_id":"49162399-792f-44b9-a40e-dcc74b6afbf4","resolution":{"observed_at":"2026-08-03T14:28:21.508948Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.575484Z","title":"Classification of Rules for Automated","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.575484Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:49fbd38545368af522312f3bc2fb2e43cc821a3b4d8c795e35da109f9576aa8c","observation_id":"af5855ed-2102-4293-bad4-6e0960f40103","resolution":{"observed_at":"2026-08-03T14:28:21.575484Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.622696Z","title":"Advances in Neural Information Processing Systems , volume =","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.622696Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:d747dae4348b537a3a3521ce0cf842c4ec64d1f2d5737f100f21c35c523d2dcf","observation_id":"a74b6530-0e70-4d9f-8f5c-fead4281b353","resolution":{"observed_at":"2026-08-03T14:28:21.622696Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.687621Z","title":"Proceedings of the 34th International Conference on Machine Learning , series =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.687621Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:4ff73515e6194f670309b03973701146c67b87085103586c918e62a893327c30","observation_id":"45110d80-dbec-4b28-b8dc-cfd35cb405ae","resolution":{"observed_at":"2026-08-03T14:28:21.687621Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.734758Z","title":"2023 , eprint =","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.734758Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:8d2fe7231ed11e4af50fc02c41e7943b37d96919ec73dfcf468bda795afb47a2","observation_id":"4e8a0239-be66-4fff-9b0e-53eba7a812ef","resolution":{"observed_at":"2026-08-03T14:28:21.734758Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.790459Z","title":"and Yang, John and Wettig, Alexander and Yao, Shunyu and Pei, Kexin and Press, Ofir and Narasimhan, Karthik , booktitle =","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.790459Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:7683b59a27cb8836c7b71e0f2bc9b6744efa922b259c7037a3ae49fad2fd784c","observation_id":"9cee447c-681e-4da3-98cc-b6d2449755fa","resolution":{"observed_at":"2026-08-03T14:28:21.790459Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.855822Z","title":"Proceedings of the 2021 ACM Conference on Fairness, Accountability, and Transparency , pages =","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.855822Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:f7dbc49b4f88c2896dabed6333df309a9f3506d40012fd168ebef1004cc972bf","observation_id":"748811fd-fbda-4cf9-b999-3e63c5978a77","resolution":{"observed_at":"2026-08-03T14:28:21.855822Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2111.15366","last_updated":"2021-11-26T19:39:34Z","snapshot_observed_at":"2026-08-07T00:21:07.584753Z","submitted_at":"2021-11-26T19:39:34Z","title":"AI and the Everything in the Whole Wide World Benchmark","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2111.15366","snapshot_observed_at":"2026-08-03T14:28:21.889120Z","title":"and Paullada, Amandalynne and Denton, Emily and Hanna, Alex , year =","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.889120Z"},"links":{"cited_paper":"/paper/2111.15366","citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:3240e2950cafa08b9abe962940ce3b8156371f9f7af19eac8eab05a80c7c010d","observation_id":"1f825375-360b-4734-975e-f945710b3e78","resolution":{"observed_at":"2026-08-03T14:28:21.889120Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:21.975505Z","title":"The Probabilistic Relevance Framework:","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:21.975505Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:4922ffdd44060ed87284619a00b82f8d51a6dea6cc982ee94b3b8ad97950b6b4","observation_id":"cad681ae-b186-4387-b16a-8e67156f8e26","resolution":{"observed_at":"2026-08-03T14:28:21.975505Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-03T14:28:22.013528Z","title":"Scandinavian Journal of Statistics , volume =","venue":null,"work_id":null,"year":1979},"citing_paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-03T14:28:22.013528Z"},"links":{"citing_paper":"/paper/2607.29058"},"observation_digest":"sha256:0bcddd5cf40a5fbe36a4de2a820182da06bb491721c7d14ad3ba10052a4cd5cc","observation_id":"cb82f994-200d-44b1-b25a-d31e9ff6b34a","resolution":{"observed_at":"2026-08-03T14:28:22.013528Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2607.29058","last_updated":"2026-07-31T06:25:41Z","latest_version":1,"primary_category":"cs.AI","snapshot_observed_at":"2026-08-06T12:22:05.211974Z","submitted_at":"2026-07-31T06:25:41Z","title":"Evidence-Grounded Constraint Checking in Construction Documents"},"reference_resolution":{"displayed":18,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":18,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":18},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 18 of 18 outbound references and 0 inbound Pith citation observations for arXiv:2607.29058."}