{"as_of":"2026-08-10T21:20:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:77685e5a07de21d06be6a11f9dad20fa85589be5e7f4864fd783f7f300a1dd57","coverage":[{"denominator":30,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":30,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-05T10:36:35.681174Z","state":"measured"},{"denominator":30,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":30,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2608.03878/citation-record","integrity":"/paper/2608.03878/integrity","json":"/paper/2608.03878/citation-record.json","paper":"/paper/2608.03878"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.518370Z","title":"Powergrow: feasible co-growth of structures and dynamics for power grid synthesis,","venue":null,"work_id":"581de29e-cfe4-4ffa-b2a4-ed4c1841a7e6","year":2026},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.536753Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:cf0f52c39dcac31e8d1574ec487861ebc755af0e4be8ef2ce74fc91b308900b9","observation_id":"c5abc725-3d6d-484f-82db-eeb90aec1898","resolution":{"observed_at":"2026-08-05T10:36:36.616843Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.451158Z","title":"Distribution grid topology and parameter estimation using deep-shallow neural network with physical consistency,","venue":null,"work_id":"df1f2d66-c656-4701-af8b-a0c06ac577fb","year":2023},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.542110Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:f2b099e71eb620879d4f819296a401ec61f468dc8230e9952ec2f994ef0d2c4d","observation_id":"44198c95-060f-4c78-91e6-c551b65e38ff","resolution":{"observed_at":"2026-08-05T10:36:36.465967Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.407633Z","title":"Real-time Assessments,","venue":null,"work_id":"41677f83-7115-4574-b7db-2659fc4ea1ca","year":2021},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.547499Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:8330215cc345d7d06233fb011f817b01e9e907c4198e14a0eccd762f5cba0c80","observation_id":"13b803b9-727b-4685-857d-ba2df206bb57","resolution":{"observed_at":"2026-08-05T10:36:36.427511Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.362757Z","title":"Transmission Operator Workflows for Real-Time Reliability Studies,","venue":null,"work_id":"47d88533-a54a-4c93-8b17-9398b6d408f1","year":2024},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.552363Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:ec6594642ff5b64470f93c6289d3eb30d7f555d24c97f1c87e913f1943f8c728","observation_id":"b75d113c-6a38-4155-b679-7a9ebe0f0e04","resolution":{"observed_at":"2026-08-05T10:36:36.381718Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.320097Z","title":"Distribution grid line outage iden- tification with unknown pattern and performance guarantee,","venue":null,"work_id":"d95762bd-1f9f-4828-a774-a152c4a55957","year":2023},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.558190Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:912224391214bb0fbd0b01f63c945d27726640980e13e2096dbff82c689eaf54","observation_id":"a9fcc182-f4a9-4cb7-9ea5-1bb34dc839cf","resolution":{"observed_at":"2026-08-05T10:36:36.336658Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.280820Z","title":"Real-Time Contingency Analysis With Corrective Transmission Switching,","venue":null,"work_id":"4825b64c-7c45-44aa-a52d-42251469ad5a","year":2017},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.563769Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:504f028220e91817e4373c73e4b67da699033ccd7fa8f95c110251e8436db316","observation_id":"9a113fc6-8cf5-446c-80fc-e54babe3402b","resolution":{"observed_at":"2026-08-05T10:36:36.295937Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.238244Z","title":"Fault Location, Isolation, and Service Restoration Technologies Reduce Outage Impact and Duration,","venue":null,"work_id":"644325c8-e631-49d2-9f72-1679d40683ab","year":2014},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.569585Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:49106eb68ce8e954066e1561eb2c2cb36b6beadc9a55c2a89fe9489e89c24644","observation_id":"412f8cb9-07a0-446a-aa58-7f56d88eaf15","resolution":{"observed_at":"2026-08-05T10:36:36.255373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.212324Z","title":"Low-dimensional ode embedding to convert low-resolution meters into “virtual","venue":null,"work_id":"8e8f57f7-9608-4f6b-810d-257150297b14","year":2024},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.574507Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:25e560c7f9a05737fbf0f7de336a393000b133a1d90bbbb676493402c81743e5","observation_id":"e75c08c9-c517-49c2-b6b2-007507ab2ba4","resolution":{"observed_at":"2026-08-05T10:36:36.218148Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.190798Z","title":"A frame- work for generating synthetic distribution feeders using openstreetmap,","venue":null,"work_id":"24ca1a30-b8cf-472c-b7d1-bd020a8c77a2","year":2019},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.579499Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:e0ab2701c541f86bfa18a74244e2df76a9a234f7c3c0abe0b094380cb30edb69","observation_id":"181a722d-0fc9-49fa-84ad-714826201b16","resolution":{"observed_at":"2026-08-05T10:36:36.197175Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2408.04923","last_updated":"2024-08-26T16:30:18Z","snapshot_observed_at":"2026-07-06T18:58:43.349175Z","submitted_at":"2024-08-09T08:07:32Z","title":"Synthetic Grid Generator: Synthesizing Large-Scale Power Distribution Grids using Open Street Map","version":2},"cited_work":{"arxiv_id":"2408.04923","doi":null,"metadata_source":"pith","pith_arxiv_id":"2408.04923","snapshot_observed_at":"2026-08-05T10:36:35.872036Z","title":"Synthetic Grid Generator: Synthesizing Large-Scale Power Distribution Grids using Open Street Map","venue":"eess.SY","work_id":"fbeb35cf-51d7-42a3-bc9e-6db9cc7953fd","year":2024},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.584381Z"},"links":{"cited_paper":"/paper/2408.04923","citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:aea0ffb15c0ceb3f0a83b44bb75d5be182687e3201c080240d5327718345dc7e","observation_id":"1813b0df-032a-4385-b064-56fe15afb145","resolution":{"observed_at":"2026-08-05T10:36:35.877396Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.169644Z","title":"Generation of low-voltage synthetic grid data for energy system modeling with the pylovo tool,","venue":null,"work_id":"d7cc1126-ec60-411b-9f37-abe536566b62","year":2025},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.589545Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:d28496e9d2f44d1d56e849b282d9aed2a9a0b634a9832abf1ce8f02dcfa806ad","observation_id":"b6f9ccce-d266-4e4d-9ff4-276b62d3557a","resolution":{"observed_at":"2026-08-05T10:36:36.175633Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.595230Z","title":"Grid structural characteristics as validation criteria for synthetic networks,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.595230Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:eb29743ff4f4cbd7d3310adf616d126ad1f1ff34b4d3fdf939fa62532d107050","observation_id":"bec906c7-1803-476f-b141-69de716b5282","resolution":{"observed_at":"2026-08-05T10:36:35.595230Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.138123Z","title":"Statistical considerations in the creation of realistic synthetic power grids for geomagnetic disturbance studies,","venue":null,"work_id":"d148c6df-badd-4a57-985b-0cd38dd714a5","year":2016},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.600841Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:e036d38ea06bb2813a1a5d1a4de964139f4d446fd7a700cb6c3430395ca5d12a","observation_id":"c54ab282-5efa-4c46-a931-8dda8c524e5b","resolution":{"observed_at":"2026-08-05T10:36:36.144481Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.120601Z","title":"Generating synthetic power grids using exponential random graph models,","venue":null,"work_id":"d1a620cc-ab3d-491d-9703-0e23afedac79","year":2024},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.606197Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:7026a1e453c882119b0879bc597b0aef2ca96d791f656cadf389ce4643ab6330","observation_id":"10856386-0e52-413d-bfe4-de755fc43afa","resolution":{"observed_at":"2026-08-05T10:36:36.125723Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.103022Z","title":"A methodology for the creation of geographically realistic synthetic power flow models,","venue":null,"work_id":"f5f170a6-0c57-47f8-b652-bfc894fb63f0","year":2016},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.610824Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:5712156dd505c05d604847f9ef799416393cfc5b67f81c93c02e6a58d7443998","observation_id":"81951d0d-17a7-4436-b1da-e8a537e250fa","resolution":{"observed_at":"2026-08-05T10:36:36.108742Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.085959Z","title":"A random growth model for power grids and other spatially embedded infrastructure networks,","venue":null,"work_id":"398a1319-035c-4366-8f7d-a885b352f5b5","year":2014},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.615280Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:cef92678663ecb830327e279b4ff007cbc8f36e4a11b3d8d4c07a2d5d4ab4e2c","observation_id":"b16c4bb8-d89a-41f1-b4cb-dfb6c34ccd4a","resolution":{"observed_at":"2026-08-05T10:36:36.090810Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.067839Z","title":"A two-stage ai- powered motif mining method for efficient power system topological analysis,","venue":null,"work_id":"3ca5a918-91ba-4451-84ea-baeec78a813d","year":2026},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.619805Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:7cfba817a27bbea57cc18409e80e32ccd00459eef5ecffb9b4ac9729825a6b04","observation_id":"60f088e6-a247-4119-9733-dfdba906a8bc","resolution":{"observed_at":"2026-08-05T10:36:36.073235Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2108.00599","last_updated":"2021-08-02T02:17:01Z","snapshot_observed_at":"2026-08-10T20:12:16.875347Z","submitted_at":"2021-08-02T02:17:01Z","title":"Synthetic Active Distribution System Generation via Unbalanced Graph Generative Adversarial Network","version":1},"cited_work":{"arxiv_id":"2108.00599","doi":null,"metadata_source":"pith","pith_arxiv_id":"2108.00599","snapshot_observed_at":"2026-08-05T10:36:35.847577Z","title":"Synthetic Active Distribution System Generation via Unbalanced Graph Generative Adversarial Network","venue":"eess.SY","work_id":"d428c37e-6fe5-40fb-ac71-f49688a328e7","year":2021},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.624514Z"},"links":{"cited_paper":"/paper/2108.00599","citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:07dcf6c2f7094081822ecfcca627f99891debb9fe4e813f457d9c70d8f0dca8b","observation_id":"95013061-95c7-4003-b4d2-90e976336e25","resolution":{"observed_at":"2026-08-05T10:36:35.852780Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1901.09674","last_updated":"2019-04-12T16:35:09Z","snapshot_observed_at":"2026-08-10T18:18:51.927846Z","submitted_at":"2019-01-17T20:55:53Z","title":"Deep Generative Graph Distribution Learning for Synthetic Power Grids","version":3},"cited_work":{"arxiv_id":"1901.09674","doi":null,"metadata_source":"pith","pith_arxiv_id":"1901.09674","snapshot_observed_at":"2026-08-05T10:36:35.821575Z","title":"Deep Generative Graph Distribution Learning for Synthetic Power Grids","venue":"cs.SI","work_id":"ef01e36a-bcf7-404c-ba47-6617334ea102","year":2019},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.629733Z"},"links":{"cited_paper":"/paper/1901.09674","citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:4d98d22c2b00de299a32a0c42b6fe03b23d6037d167f1845209ff0ddef1b4811","observation_id":"20635cc0-5f15-45ee-8714-ae1f2301abd3","resolution":{"observed_at":"2026-08-05T10:36:35.827461Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.050341Z","title":"Feedergan: Synthetic feeder generation via deep graph adversarial nets,","venue":null,"work_id":"3fbdfb12-4429-4482-998e-dec39a07699c","year":2020},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.635012Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:bd6c279f6ed1fb43b855caab9a03109d2d52cfe3e1a69835dbf5e3fd8708ae7f","observation_id":"24b11e4d-c6e3-4f02-bcde-0b6c7af314b2","resolution":{"observed_at":"2026-08-05T10:36:36.055932Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2509.02469","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.785382Z","title":"Exploring variational graph au- toencoders for distribution grid data generation,","venue":null,"work_id":"833994ca-5131-41cc-a1b3-eb89bc609fd6","year":2025},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.639611Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:2ecac4b2790618c4ed3ca1efaad1918d284e5578864b377fee9132f6e4567d13","observation_id":"c6a8711c-368b-4b80-8044-f906a7720b86","resolution":{"observed_at":"2026-08-05T10:36:35.799556Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.644238Z","title":"Score-based generative modeling of graphs via the system of stochastic differential equations,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.644238Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:f73c249f0fc635bd0f459ef1395becee4e529f6b949abaef5d69a926855cc7b9","observation_id":"9a83da5f-ed14-4485-8e58-cdda17a878b1","resolution":{"observed_at":"2026-08-05T10:36:35.644238Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.020530Z","title":"Advancing graph generation through beta diffusion,","venue":null,"work_id":"b6fe6bfc-1be7-48a7-b949-d1314a9c68bc","year":2025},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.648787Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:0c4f7f00136c9244fdea187fb67281e5c4131b9b97e7ff63a1b80587029b1982","observation_id":"b85920af-0425-4ef3-b2e2-e1cc2200931d","resolution":{"observed_at":"2026-08-05T10:36:36.025342Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:36.003969Z","title":"Active distribution system synthesis via unbalanced graph generative adversarial network,","venue":null,"work_id":"22de9e33-2729-4a38-ba89-a1d1eee83742","year":2022},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.653223Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:88b35160c63e95d93506ddaa9f21f6cebf6e2543900aee0ccc0cdc34245842a2","observation_id":"f97a98ae-d234-4573-b397-f9b124646d51","resolution":{"observed_at":"2026-08-05T10:36:36.008926Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.981954Z","title":"Beta diffusion,","venue":null,"work_id":"9bc8ca26-3872-4381-9627-53af5f838723","year":2023},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.657865Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:024874c7694682576b99cd637c8ec9257c3bf8376f63961f986deba10d439c5c","observation_id":"8ee62d29-060c-4061-9f7c-0789223efcc1","resolution":{"observed_at":"2026-08-05T10:36:35.986894Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.964586Z","title":"Digress: Discrete denoising diffusion for graph generation,","venue":null,"work_id":"54489343-9f62-4646-96cd-acbfd5053f83","year":2023},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.662797Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:257eff2d23137c15fa66359905107cf26bca2536e8c7fdcfbd9b6d55705039ab","observation_id":"c4cfdee3-b3e0-4b33-9466-3bfd79751814","resolution":{"observed_at":"2026-08-05T10:36:35.969478Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.945604Z","title":"PYPOWER: Electric power system simulation in python,","venue":null,"work_id":"e2f19991-ff70-402a-b01f-8239a1d2ade1","year":2013},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.667271Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:b4c899b467b7a6405cd9409511334ed93b29026a9a8fa998e14ff76c38409c56","observation_id":"9b342b97-6827-417d-97ec-4465b15922dc","resolution":{"observed_at":"2026-08-05T10:36:35.951288Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.928663Z","title":"European representative electricity distribution networks,","venue":null,"work_id":"118fd8da-195e-4c7b-825c-b61fd6b3fe68","year":2018},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.672122Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:f26bab06e0bfe6ef70f2cb661547507263bf1080b5ca347a98283ee4908a8509","observation_id":"4b6abb0f-3d14-4a1a-9444-f54eae59a3d5","resolution":{"observed_at":"2026-08-05T10:36:35.933625Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.909918Z","title":"A gnn-based generative model for generating synthetic cyber-physical power system topology,","venue":null,"work_id":"1cbfc261-8a50-4422-bd98-62531a502797","year":2023},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.676702Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:65647aeb03b62ed9b711c0111206b35d0f79e2baae3470d4944a6741211c627f","observation_id":"f0b7ee6d-e203-4a04-80a2-ffd0557968b6","resolution":{"observed_at":"2026-08-05T10:36:35.916097Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T10:36:35.890483Z","title":"Graph generation with diffusion mixture,","venue":null,"work_id":"1ac09c7e-2113-4c25-bc09-a3ed3974f912","year":2024},"citing_paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-05T10:36:35.681174Z"},"links":{"citing_paper":"/paper/2608.03878"},"observation_digest":"sha256:eb1aaa07a39e537ecbfd6e117d075ee19a675aab529031521673ece9651d676d","observation_id":"56ba8c6b-e7dd-4835-8f9e-b554b2cad9a5","resolution":{"observed_at":"2026-08-05T10:36:35.895900Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2608.03878","last_updated":"2026-08-04T16:17:15Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-09T08:22:33.905179Z","submitted_at":"2026-08-04T16:17:15Z","title":"Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution"},"reference_resolution":{"displayed":30,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":2,"verified_exact":4,"verified_fuzzy":24},"total_outbound_references":30},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 30 of 30 outbound references and 0 inbound Pith citation observations for arXiv:2608.03878."}