{"as_of":"2026-08-20T18:42:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:104508bacb426bc54d2ba73063283fdf3178da77a3cb4caac59ba8f2ce272602","coverage":[{"denominator":21,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":21,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-14T04:16:14.071711Z","state":"measured"},{"denominator":21,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":21,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-20T06:33:59.587034+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2608.10197/citation-record","integrity":"/paper/2608.10197/integrity","json":"/paper/2608.10197/citation-record.json","paper":"/paper/2608.10197"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:13.903170Z","title":"Journal of Economic Dynamics and Control , ISSN =","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.903170Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:8274328996581899ccd5cafe5dcac737cee7b0c7f3e77320aa4123b3d3918d40","observation_id":"5f691ce0-2770-4073-a8f1-10c999739e2c","resolution":{"observed_at":"2026-08-14T04:16:13.903170Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:13.913002Z","title":"Journal of Energy Storage , author =","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.913002Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:83b021e3e23fc97ae67fd171345945577df3e717aae874c0545f03b139e9cd92","observation_id":"6c3d36a7-1f91-4b78-a40e-2b039d568859","resolution":{"observed_at":"2026-08-14T04:16:13.913002Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.670206Z","title":"Energy Economics , volume =","venue":null,"work_id":"1d48e5dc-f2fb-49a6-ad44-b4902337883a","year":2022},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.930385Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:9b60f882d60ad3a061cdd948ede4498f4e8ef16f399a1ba9449c91423a0d4d14","observation_id":"0e55a7f3-84b8-44ed-8527-800b6f133d1b","resolution":{"observed_at":"2026-08-14T04:16:14.675409Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1093/imamci/dnw004","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.208636Z","title":"Viscosity solutions for a system of PDEs and optimal switching , volume =","venue":null,"work_id":"bb9d6ed4-1c82-42a2-bcc5-fefd008abcd7","year":null},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.940748Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:67b0bf82c9ba5242f97af33e09387f6e05e04a582d83cd3925e868fdf2579d1a","observation_id":"767975b8-1a56-44eb-8a3b-27039c2b1a5f","resolution":{"observed_at":"2026-08-14T04:16:14.217567Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1137/070697641","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.174852Z","title":"A Finite Horizon Optimal Multiple Switching Problem , journal =","venue":null,"work_id":"7a777c12-7f31-44e3-a21a-4425328cbf2c","year":2009},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.947079Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:091411924cba8c3a87b895fbb1ba119099dce6b5603780219bc4d6df93458dfd","observation_id":"2b1eed62-cbd9-42a8-a8be-28a217449e91","resolution":{"observed_at":"2026-08-14T04:16:14.182902Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:13.961577Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.961577Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:c8c220e55259d9c2541010ef51504e902d5f8bad77d25aa4e3d343b4396ab5c8","observation_id":"2202e2ed-fd1b-46ad-9158-4c04375800c7","resolution":{"observed_at":"2026-08-14T04:16:13.961577Z","resolver_source":null,"status":"parse_uncertain"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.620241Z","title":"Progress in Nuclear Energy , volume =","venue":null,"work_id":"14fd0553-0baf-4f4d-bff5-35981922940e","year":2018},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.967600Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:8289eb8e090b06087a95ee7f7b1b901c2819685157ce5cb2a4c16f372844f55b","observation_id":"c43adf1e-639e-4f3c-8ba3-6249692bb5b2","resolution":{"observed_at":"2026-08-14T04:16:14.634809Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.585929Z","title":"Applied Energy , volume =","venue":null,"work_id":"7504fc9e-2db3-421d-aca7-07c381bdbf89","year":2021},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.973687Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:82272d9e10f64e212c4fded20bca6f2067536d3a05f34ae77f7961bcab2f51dd","observation_id":"42192d4d-7c0c-4b3a-a76b-047203a40560","resolution":{"observed_at":"2026-08-14T04:16:14.591242Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.565531Z","title":"Energy Economics , volume =","venue":null,"work_id":"a0bf1ee5-251a-48f8-84b1-eeba6007d450","year":2021},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.978509Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:dcf46e041d01dc39636285eabbd82cb5e15741ff9219c49d7267aeec4977b6c9","observation_id":"1423ddaf-6702-42df-b8c2-c0b70b802f9a","resolution":{"observed_at":"2026-08-14T04:16:14.572397Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.536230Z","title":"Energy Economics , volume =","venue":null,"work_id":"d5fc28ae-5a78-449e-8966-33a64af6f14e","year":2025},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.984294Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:516b336c64cbe80a8b8390c06dd2f6f27e80b61dc96e4d2575a0069db4c81163","observation_id":"be9d64f1-2fc5-4196-b318-68f4227c7669","resolution":{"observed_at":"2026-08-14T04:16:14.550928Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.507285Z","title":"2011 , doi =","venue":null,"work_id":"9f4bc1ee-07df-478b-a1a5-2ba0b1bb7a88","year":2011},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.989022Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:133184ca064746aeb3c57c0f44b37da94db23ee2b64eb04dd3b9304014ef5e94","observation_id":"918822d9-5dd5-4518-a3bd-c9caa951987b","resolution":{"observed_at":"2026-08-14T04:16:14.512774Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.488819Z","title":"Renewable Energy , volume =","venue":null,"work_id":"9aa962d9-622c-4355-9100-a9069d649bed","year":2020},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:13.993405Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:de1c4761625a573473b1056a95ed1e9815ceecd09b917b9b3ee7580e26430ddb","observation_id":"124b8918-90ae-44c8-a1c6-04e81c80adb6","resolution":{"observed_at":"2026-08-14T04:16:14.494064Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.468774Z","title":"2017 , author =","venue":null,"work_id":"4fa2fbf7-6287-4d43-84b3-1614fd6b9edb","year":2017},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.000260Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:307cad5bba4647f59a55942f35fbf9496b64cd55f9d7f813faed4bc3600a2fa3","observation_id":"3b374295-d2cb-49a5-802e-f737e8f85138","resolution":{"observed_at":"2026-08-14T04:16:14.475848Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.enpol.2016.04.037","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.157747Z","title":"Nuclear and intermittent renewables: Two compatible supply options? The case of the French power mix , journal =","venue":null,"work_id":"daa0b877-511d-4915-9aa7-a65c21949836","year":2016},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.015724Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:7f0178657d9fcdedb3cf8cade3e805c4dabafc10309a9f1748f5f6340a5e5ab9","observation_id":"753500a7-0c9e-47dd-aeaf-dc43fdce1f55","resolution":{"observed_at":"2026-08-14T04:16:14.163684Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.451414Z","title":null,"venue":null,"work_id":"786ec46e-0c5f-4431-bce0-b9440fb3aa3f","year":null},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.026137Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:8983a10ff4b553656d4bbe8646de69d84eeff87e660f10c826045c4e42df9a34","observation_id":"5dc3a128-fad2-416e-b56c-7a15245f135d","resolution":{"observed_at":"2026-08-14T04:16:14.456142Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.430775Z","title":"2009 , publisher =","venue":null,"work_id":"7b7e8547-86b0-497a-844b-355df0cc4c72","year":2009},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.037437Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:944d405fe7613231333b46ee6c76795596af4b3e65323348a821e252ddd3b71d","observation_id":"7caac81d-b6de-42cf-a919-ccb62a386d57","resolution":{"observed_at":"2026-08-14T04:16:14.439625Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.404303Z","title":"International Journal of Theoretical and Applied Finance","venue":null,"work_id":"fc68cc3b-655f-41f6-bc25-b7e2d5b90730","year":2009},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.049270Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:cc56e3d9396149785592376b863fddb65a13553135beb67d56619139648e1fda","observation_id":"61d592dd-cf9a-4889-989b-ac67e2788774","resolution":{"observed_at":"2026-08-14T04:16:14.414981Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.2760/665806","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.139402Z","title":"Joint Research Centre","venue":null,"work_id":"52057c20-fc5e-4c29-9099-2a832f326af9","year":2020},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.054917Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:e73b854bdb9e6ed50ef8cc437598ca2b2e0c2949288e8321cd59f4f174216167","observation_id":"bea7fba4-f1d6-45db-beea-1db088d09059","resolution":{"observed_at":"2026-08-14T04:16:14.145821Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.fusengdes.2019.03.150","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.108402Z","title":"How fusion power can contribute to a fully decarbonized European power mix after 2050 , journal =","venue":null,"work_id":"b3a00a74-837f-4cd2-b5e1-59305684d4bd","year":2019},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.060265Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:e11dfc26aec93f22690122bf64bad9c2984f47b89d83aa1cc00197b155ba0a3e","observation_id":"133fa5a2-e773-4900-b5be-9de2d98d8698","resolution":{"observed_at":"2026-08-14T04:16:14.118136Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.386887Z","title":"Optimal control of electricity input given an uncertain demand","venue":null,"work_id":"005bf09d-b9d9-4bb5-b466-78a2a80ade71","year":2019},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.066064Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:0b787114787073916b661f75cce4c71d4e6511e2ebc42adca6b91b1967b0a508","observation_id":"7931cbf1-857c-44ce-bbc7-803225760b23","resolution":{"observed_at":"2026-08-14T04:16:14.392354Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T04:16:14.368236Z","title":"Chance‐constrained optimal inflow control in hyperbolic supply systems with uncertain demand","venue":null,"work_id":"9031049a-1b55-4d1a-a760-11e1ba0ff178","year":2023},"citing_paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-14T04:16:14.071711Z"},"links":{"citing_paper":"/paper/2608.10197"},"observation_digest":"sha256:96c50998f95cb471a16ccba63c28291c93e58202ad0d288ce0915eff74ab6cc3","observation_id":"efdaff26-755f-4b0c-9f10-ab103d27df28","resolution":{"observed_at":"2026-08-14T04:16:14.375170Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-20T06:33:59.587034+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2608.10197","last_updated":"2026-08-10T20:15:50Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-20T13:34:20.516256Z","submitted_at":"2026-08-10T20:15:50Z","title":"An Optimal Energy Production Problem with Energy Source Switching and Load Following Nuclear Power Plants"},"reference_resolution":{"displayed":21,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":1,"unresolved":3,"verified_exact":5,"verified_fuzzy":12},"total_outbound_references":21},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-20T06:33:59.587034+00:00","source":"crossref"},{"observed_at":"2026-08-20T06:33:54.927442+00:00","source":"retraction_watch"}],"thesis":"As of 20 August 2026, this Paper Citation Record lists 21 of 21 outbound references and 0 inbound Pith citation observations for arXiv:2608.10197."}