{"as_of":"2026-08-19T14:26:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:6001f647bd39f99b988b1fbf51f46bc6f9da81be25ad4d0601b100b4fbad2c5a","coverage":[{"denominator":34,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":34,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-15T14:18:43.621557Z","state":"measured"},{"denominator":34,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":34,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-19T06:32:44.657259+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2608.11405/citation-record","integrity":"/paper/2608.11405/integrity","json":"/paper/2608.11405/citation-record.json","paper":"/paper/2608.11405"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"6422.6338","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.794456Z","title":null,"venue":null,"work_id":"a3ce4f58-2d0d-43b6-a8b9-d078bcad586a","year":2015},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.621557Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:4915fa44feb94e8338d4ea27413dfe2c3c68882ee25731cfcc6296c16e9e7d22","observation_id":"2c2a8dad-4060-4716-b36d-87ccefcc25bf","resolution":{"observed_at":"2026-08-15T14:18:44.824933Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:45.963271Z","title":"Equating this expression with the prescribed value ofcvgives cv2 = exp(σ2)−1 =⇒σ 2 = ln 1 +cv 2 =⇒σ= q ln 1 +cv 2","venue":null,"work_id":"8193df6b-c708-4506-80a2-035b6edc9e94","year":2017},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.557602Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:ad7d708ac1b36ec4fa61f5118946d050eba55dd7deae767951ecee91cfb06cfa","observation_id":"bcc08bff-f1fe-4fed-a3a3-d60d47069269","resolution":{"observed_at":"2026-08-15T14:18:46.059692Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.388799Z","title":"URL https://www.tandfonline.co m/doi/abs/10.1080/23789689.2024.2346705","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.388799Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:305cf0554b2bd7175176734b775e8c415e3b158a00b86879e29ac8c0749e4f1c","observation_id":"b5e9a4e2-64a6-4a4a-9d9d-f986c4d9d189","resolution":{"observed_at":"2026-08-15T14:18:42.388799Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.579096Z","title":"Optimizing transit network departure frequency considering congestion effects.Journal of Advanced Transportation, 2024(1):8131887,","venue":null,"work_id":"f4931906-e626-4bc5-a87d-dbc3f76f6807","year":2024},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.719543Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:eb6313088a4ff8eb6a266ab8dd73dd8688fc137a289124ac1225d0cd07710159","observation_id":"b9f3ffe3-6ee8-464d-9d58-bad0db9a9e32","resolution":{"observed_at":"2026-08-15T14:18:46.719102Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2411.08782","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:45.319449Z","title":"Restoring accessibility during urban rail disruptions via bus network redesign.arXiv preprint arXiv:2411.08782,","venue":null,"work_id":"1c6bd839-ef4f-4fb1-a50b-fa174555f150","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.798310Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:8bf07531d1232827d369ca8c3a63a1a83baf5fed6f0e53e597a0ea38649330e7","observation_id":"8d33137c-36df-4d9f-98a9-930512adbfbe","resolution":{"observed_at":"2026-08-15T14:18:45.378773Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.385782Z","title":"Optimization of bus rerouting to alleviate the impact of rail transit construction.Journal of Advanced Transportation, 2022(1):5773362,","venue":null,"work_id":"98f748eb-72e3-4195-a2b8-8bf14aa2006b","year":2022},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.809634Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:0da9c47fce093e0be7ddb781dde602395f92e80b7b3ad3c0166b033756ac4fd5","observation_id":"ad4b5bb9-971a-4f31-bb65-316c25a200db","resolution":{"observed_at":"2026-08-15T14:18:46.462748Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s12469-022-00301-8","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.329502Z","title":"Riccardo Massobrio and Oded Cats","venue":null,"work_id":"5bdf1da4-f2e6-44b8-b665-a72985c86325","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.942033Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:824e006dc2819a1f648389e08209e2dc848309a0df2414a33aea4b895800c95c","observation_id":"527a07b9-96d4-44df-9d4f-810f6c5e3bb3","resolution":{"observed_at":"2026-08-15T14:18:44.446129Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1038/s42005-024-01596-8","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.285299Z","title":"Han Pu, Yinzhen Li, and Changxi Ma","venue":null,"work_id":"d4b5104b-e560-4691-b4a4-8bad5a91e751","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.948882Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:c6d7fa4f56b714ff062a5d2bf77726d65f034e56c48f41520add2011568f8104","observation_id":"ca075ec7-b824-4a02-820b-56754769d3c3","resolution":{"observed_at":"2026-08-15T14:18:44.317572Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.023411Z","title":"Giovanni Calabrò, Michela Le Pira, Nadia Giuffrida, Giuseppe Inturri, Matteo Ignaccolo, and Gonçalo H de A Correia","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.023411Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:8ae7feeb2d23334751dd89098a427d303735f52c55bcb1e21cdd6eb335411968","observation_id":"aaab8b88-3616-4b1b-b0bb-fd380b6a86ae","resolution":{"observed_at":"2026-08-15T14:18:43.023411Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.ijtst.2021.05.003","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.108858Z","title":"doi:https://doi.org/10.1016/j.ijtst.2021.05.003","venue":null,"work_id":"ce126bef-472c-4210-a094-03b9c8f3ad33","year":2021},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.030076Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:bdae7beac4332b476e104dccde18cec4291873ce67af7195e83f94fee2af8f67","observation_id":"7c9e121e-d4bd-440e-ba0c-944bbd6124b1","resolution":{"observed_at":"2026-08-15T14:18:44.219537Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.078940Z","title":"URLhttps://doi.org/10.1287/trsc.2021.1085","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.078940Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:cd27081281801988f7f902652461153b649806a5c65104b95df5475c65941098","observation_id":"05d15ef0-5dfb-41d5-af90-86c73aba9737","resolution":{"observed_at":"2026-08-15T14:18:43.078940Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s12469-009-0011-z","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.930543Z","title":"Office of the New York State Comptroller","venue":null,"work_id":"a9ed1f6c-34d5-4950-899d-6ade03d39fc7","year":2026},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.120642Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:d8fb87875227645d68c67628982f41f1631a8c04a6033379e62c02115fb17d74","observation_id":"aefe6cb2-9796-4f82-9382-2c21cf8fd271","resolution":{"observed_at":"2026-08-15T14:18:44.000640Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1707.01926","last_updated":"2018-02-22T19:52:51Z","snapshot_observed_at":"2026-08-14T20:49:13.849412Z","submitted_at":"2017-07-06T18:20:59Z","title":"Diffusion Convolutional Recurrent Neural Network: Data-Driven Traffic Forecasting","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1707.01926","snapshot_observed_at":"2026-08-15T14:18:43.247187Z","title":"Diffusion convolutional recurrent neural network: Data-driven traffic forecasting.arXiv preprint arXiv:1707.01926,","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.247187Z"},"links":{"cited_paper":"/paper/1707.01926","citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:004f727754072d492eeba4d71813fef3b0f8d32f854c73bc12a252e8ef54df6e","observation_id":"81716f9d-b2ce-4319-925a-60128f3f20f8","resolution":{"observed_at":"2026-08-15T14:18:43.247187Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.232411Z","title":"An exact solution approach for the bus line planning problem with integrated passenger routing.Journal of Advanced Transportation, 2021(1):6684795,","venue":null,"work_id":"17c3306a-4a49-4da1-9e74-7dd87ca6e7b3","year":2021},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.318688Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:92cefdee44e3f06d9ac20e0ac25a1a52d26df1c0414b48a812dcefb749103b22","observation_id":"4f0277b7-c6a8-401e-a4bc-a660239956ae","resolution":{"observed_at":"2026-08-15T14:18:46.276799Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.136903Z","title":"Performance metrics in multi-objective optimization","venue":null,"work_id":"104f243d-1eee-4f4b-9b36-ca7d351e11e6","year":2015},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.470994Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:340be09c65eb99f14fc41ac8bce651a28e832890919c53ddfcd26d89bf927974","observation_id":"ba557d7c-073d-4a8d-8810-8da904d07cfe","resolution":{"observed_at":"2026-08-15T14:18:46.220484Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:45.916527Z","title":"Table 6 reports the one-hour-ahead prediction errors used in our experiments","venue":null,"work_id":"35728fc1-f98f-41ad-81c2-66cedfc836ae","year":2022},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.615791Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:c19107489531c67f61459da4a5dbdf412e84af1e67944f89003771cc09d42fdb","observation_id":"86b905f1-c31b-4140-9c5d-3b9251f30b44","resolution":{"observed_at":"2026-08-15T14:18:45.952061Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2410.16436","last_updated":"2024-10-21T19:00:00Z","snapshot_observed_at":"2026-08-16T13:07:14.827458Z","submitted_at":"2024-10-21T19:00:00Z","title":"An Analytical Approach to the Jaccard Similarity Index","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2410.16436","snapshot_observed_at":"2026-08-15T14:18:43.189196Z","title":"An analytical approach to the jaccard similarity index","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":1901,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.189196Z"},"links":{"cited_paper":"/paper/2410.16436","citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:f695046bfaad05e54ca02416ca8f52f0d9bee2f94293b9ff48ca3ecabf33a735","observation_id":"d61ac807-126e-414f-b881-c4b756eef47e","resolution":{"observed_at":"2026-08-15T14:18:43.189196Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.537873Z","title":"Valérie Guihaire and Jin-Kao Hao","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":1986,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.537873Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:3f9088088ad34b837546442073c5a0c0f2d34174951efd53da5fa2ea78b3c5e4","observation_id":"48ef1bb1-aae0-4637-8385-5dfc01db48b3","resolution":{"observed_at":"2026-08-15T14:18:42.537873Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1002/atr.5670250205","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T11:08:47.750906Z","title":"Dong Zhao, Adriana-Simona Mih ˘ai¸ t˘a, Yuming Ou, Hanna Grzybowska, and Mo Li","venue":"Journal of Advanced Transportation","work_id":"e197dd67-a346-405f-bd0d-0dd0b0b80391","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":1991,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.084058Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:78b1d89a583e2a954df108e6e96877d4e7e34667f7d7c0db69421b8bb48aa082","observation_id":"fe07977e-a05a-4a16-8bf3-a99fbbaad584","resolution":{"observed_at":"2026-08-15T14:18:44.095347Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.071306Z","title":"The Jaccard distance between two setsXandYis dJ(X,Y) = 1− |X∩Y| |X∪Y| = 1−J(X,Y)","venue":null,"work_id":"64fe43d1-b64a-4abd-918c-7b152ef3917e","year":1971},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2001,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.552906Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:0fe6b8884e913e47a1c4943d00d300f5a5c134a6efabc8bbcea5a00f0d9d426f","observation_id":"389ad8b0-ca8d-4193-aed0-ffbbcfa283ce","resolution":{"observed_at":"2026-08-15T14:18:46.123502Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/s0927-0507(06)14002-5","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.458093Z","title":"Avishai Ceder.Public Transit Planning and Operation: Modeling, Practice and Behavior","venue":null,"work_id":"b9303ad3-69bc-4198-848d-2f4e6a84c05c","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2007,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.677882Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:f221af9a87ed73b2d8eb299b7f381bd6ba2dd85b7589e133c11e724a23cbff44","observation_id":"276d1f0e-1fc0-4542-b054-fe0fc0285593","resolution":{"observed_at":"2026-08-15T14:18:44.560428Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.574762Z","title":"Konstantinos Kepaptsoglou and Matthew Karlaftis","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2008,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.574762Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:31bdea99d9a59d3353be9d4e707b59da0877fc15906c782f41a019d7078b712b","observation_id":"4a97e724-55c8-4fa2-9d3f-3dfcaad2f5d6","resolution":{"observed_at":"2026-08-15T14:18:42.574762Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.635603Z","title":"Javier Durán-Micco and Pieter Vansteenwegen","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2009,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.635603Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:0d1544358fdfc5973494a3b0c8ee28e8040cf28d96646124a2a6a3424ac56999","observation_id":"019483fb-4fa7-4c7f-9433-070111f91a6c","resolution":{"observed_at":"2026-08-15T14:18:42.635603Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.3141/2263-17","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.752867Z","title":"Rafael H","venue":null,"work_id":"d64169d8-9a8a-4606-a235-07f70df6e06c","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2011,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.331242Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:e54a6ac65035ceea1e5aa79de951f49bf40352c5f1ba8f70befd6278e560eb75","observation_id":"8a7bed77-eda6-48e6-9daa-1cbb33461210","resolution":{"observed_at":"2026-08-15T14:18:43.876250Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.277011Z","title":"Younes Guessous, Maurice Aron, Neila Bhouri, and Simon Cohen","venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2014,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.277011Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:ed6a8a48069dbcdbfcfe6a3e69fcf4355007313d7f642dbf57a99e6f646bb696","observation_id":"bc0952ba-5430-4ffb-a408-3167ac618710","resolution":{"observed_at":"2026-08-15T14:18:43.277011Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.453337Z","title":"Avishai Ceder and Nigel H","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2015,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.453337Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:5e00073aa1c05f686d53868d5bd899a8a6f272dc68ebdcc35f265ffbc17484ee","observation_id":"d30d0125-a49b-424f-9c77-334458642a48","resolution":{"observed_at":"2026-08-15T14:18:42.453337Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:43.417382Z","title":"Michael Levandowsky and David Winter","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2017,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.417382Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:e687f7c36bf9d964ea47fc061c2dc59e510825e83da166bb5d82eb25bfb72e56","observation_id":"b865169d-487c-41e8-bbe7-ae687a101f56","resolution":{"observed_at":"2026-08-15T14:18:43.417382Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1902.09745","last_updated":"2019-05-21T10:27:20Z","snapshot_observed_at":"2026-08-14T17:11:16.040540Z","submitted_at":"2019-02-26T05:56:05Z","title":"Online Predictive Optimization Framework for Stochastic Demand-Responsive Transit Services","version":2},"cited_work":{"arxiv_id":"1902.09745","doi":null,"metadata_source":"pith","pith_arxiv_id":"1902.09745","snapshot_observed_at":"2026-08-15T14:18:45.396741Z","title":"Online Predictive Optimization Framework for Stochastic Demand-Responsive Transit Services","venue":"stat.ML","work_id":"c2df9809-adb2-4af4-b4de-afd9aa1c29a9","year":2019},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2019,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.446957Z"},"links":{"cited_paper":"/paper/1902.09745","citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:9acfbf9b0f34b08b4436409a914ce9ee4dace37e78ced9429ac25a956226279c","observation_id":"28d513b8-bdff-4a12-ac77-a40bb531fe6c","resolution":{"observed_at":"2026-08-15T14:18:45.492084Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"files/2062231","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:45.561828Z","title":"Beda Büchel and Francesco Corman","venue":null,"work_id":"78618271-ae3f-4213-8423-2e5b1f1c6488","year":null},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2020,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.426077Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:b02bcb0710eb5a884749cf27cb5e2a638a5b83ec9f66c9c24039dbb4c93d1019","observation_id":"d306a908-7798-4050-b8d1-e83a327a928c","resolution":{"observed_at":"2026-08-15T14:18:45.613051Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:42.381946Z","title":"URL https://repository.tudelft.nl/file/File_d117b4dc- 8cb c-4286-8f32-d9829ca3a273","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2021,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.381946Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:3c0c91dc47ba9043c8dc829131efc633a98a5c38cfdc2aee5724224c861b29ab","observation_id":"4e3f9dcf-b273-4a1c-b5e2-d03bc3b6f258","resolution":{"observed_at":"2026-08-15T14:18:42.381946Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.tra.2022.08.006","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:44.616299Z","title":"Jing-Quan Li, Myoung Kyun Song, Meng Li, Wei-Bin Zhang, and Mark Miller","venue":null,"work_id":"760c8cb2-c3ab-436c-8df4-0c398ecddfb5","year":2022},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2022,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.270755Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:2402b45fc27e8e7b5c3fbceff07c8cfac2acc2f8b6339260926fb886aad54a44","observation_id":"958d0914-3671-4696-b47e-fdbb8974e6aa","resolution":{"observed_at":"2026-08-15T14:18:44.694154Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.523958Z","title":"Optimal adjustment schemes on the long through-type bus lines considering the urban rail transit network.Discrete Dynamics in Nature and Society, 2018(1):8029137, 2018a","venue":null,"work_id":"1d231b0c-fe38-4eee-8c5f-50d86124f7e2","year":2018},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2023,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.804185Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:c4afac1b119550a4b7561d3533e4e57e87b81f60147ed5bdbe710cce74edfc1b","observation_id":"d15bfe6a-a711-4f4d-87aa-377e3d78ba63","resolution":{"observed_at":"2026-08-15T14:18:46.568534Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.731344Z","title":"International Transport Forum (ITF)","venue":null,"work_id":"92b5d073-0851-4693-a15f-46f9387f46f0","year":2024},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2024,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:42.305759Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:932a147fedaa3dec600735e33e4ff9610b68c57ae35736a5e7240bb71b05375b","observation_id":"e4c5c375-f413-4c6d-b427-ae1c682f345b","resolution":{"observed_at":"2026-08-15T14:18:46.837547Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-15T14:18:46.289660Z","title":"Office of the New York City Comptroller","venue":null,"work_id":"389c59fe-b57b-4435-9b98-04865767e1e1","year":2026},"citing_paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions","version":1},"reference_index":2025,"source":"pdf_text","source_observed_at":"2026-08-15T14:18:43.151903Z"},"links":{"citing_paper":"/paper/2608.11405"},"observation_digest":"sha256:5fb16f8e34cab7f7f3868a1dee55bf64d2581c15c678827301b7e0a50e3c5575","observation_id":"b2b68336-2c1b-4a63-a625-4d2676f32cc4","resolution":{"observed_at":"2026-08-15T14:18:46.373702Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2608.11405","last_updated":"2026-08-11T20:10:28Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-19T03:41:18.639501Z","submitted_at":"2026-08-11T20:10:28Z","title":"Predict-then-Optimize Framework for Public Transport Line Redesign under Fluctuating Traffic Conditions"},"reference_resolution":{"displayed":34,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":12,"verified_exact":12,"verified_fuzzy":10},"total_outbound_references":34},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-19T06:32:44.657259+00:00","source":"crossref"},{"observed_at":"2026-08-19T06:32:39.956319+00:00","source":"retraction_watch"}],"thesis":"As of 19 August 2026, this Paper Citation Record lists 34 of 34 outbound references and 0 inbound Pith citation observations for arXiv:2608.11405."}