{"as_of":"2026-08-17T21:30:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:b292ebefc09cae877efa053da6e8e5bf2144b6e0074549fd87e44929b8c62cb8","coverage":[{"denominator":30,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":30,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-16T00:24:52.369131Z","state":"measured"},{"denominator":30,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":30,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-17T06:30:58.91139+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2608.12047/citation-record","integrity":"/paper/2608.12047/integrity","json":"/paper/2608.12047/citation-record.json","paper":"/paper/2608.12047"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.883055Z","title":"Optimal Transmission Switching,","venue":null,"work_id":"1f281fd6-0eaa-4a5f-83e9-7b7c2c33b162","year":2008},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.226266Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:1d1cd1d755cd0aed8772b6ad61f62c77786843dfe812bee922f8454522bd2986","observation_id":"316e510c-f56d-4171-811b-9a95d16b8636","resolution":{"observed_at":"2026-08-16T00:24:52.888084Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.865929Z","title":"Co-Optimization of Generation Unit Commitment and Transmission Switching With N-1 Reliability,","venue":null,"work_id":"7246c49f-61be-4afb-b351-6037a08cf122","year":2010},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.233192Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:71d9eb3e119d794eb2dcf7f6091463e6a4f34c441ab713bf3413577fdc04ec67","observation_id":"d3d594db-d8e7-4d0d-a296-ceb01ea8045a","resolution":{"observed_at":"2026-08-16T00:24:52.870997Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.848718Z","title":"Congestion management through topologi- cal corrections: A case study of Central Western Europe,","venue":null,"work_id":"d25ab8dd-e286-48ae-ab94-5a102fa3d59f","year":2015},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.237506Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:2f481b9a736745d83aae64f45926759aaaae26cd9bce7a863912e26651fdcfb6","observation_id":"ed23d9b9-3723-4168-aa2e-181d8512fc2d","resolution":{"observed_at":"2026-08-16T00:24:52.853772Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.833075Z","title":"Toward online bus-bar splitting for increas- ing load margins to static stability limit,","venue":null,"work_id":"5ae92eea-4fc7-4220-b3f3-6441829a3802","year":2017},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.242474Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:2e007f177de4983d83f7e24b313d8bafdca483e22ec9b1f83bfd6e48f1e525ea","observation_id":"f34c8abc-3f62-4a3c-a7e7-54a3e1f05cba","resolution":{"observed_at":"2026-08-16T00:24:52.838184Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.816331Z","title":"A stochastic security constrained unit commitment model for reconfigurable networks with high wind power penetration,","venue":null,"work_id":"2fc83f58-2fea-488e-8323-dda1f3fb9d27","year":2015},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.247466Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:e5d3ebb8df5095e7df3fef18952b4f337e183d1594910979f0204facaf851170","observation_id":"ec679b79-a4af-4e1a-9fb9-8150542d99dc","resolution":{"observed_at":"2026-08-16T00:24:52.821782Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.799635Z","title":"Security constrained OPF utilizing substation reconfiguration and busbar splitting,","venue":null,"work_id":"3d895a32-72ef-455e-9086-72f142f2f3d1","year":2022},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.251888Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:2cfa46da9909b0d9229ff7cc090d977f9f54f31f1364facf1c64f40ee106136d","observation_id":"51fd35ea-91ab-4617-bede-39169254ae6a","resolution":{"observed_at":"2026-08-16T00:24:52.805431Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.783216Z","title":"Day-Ahead Contingency- Constrained Unit Commitment With Co-Optimized Post-Contingency Transmission Switching,","venue":null,"work_id":"2cdde4ae-14c8-402a-9b6c-554859b7280c","year":2020},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.257241Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:6e76364a3d56981680111414e8541ac780b6eae89e708d0811dfe20ad7c6d920","observation_id":"23eb2ce8-51f3-428d-b379-35a047cd1744","resolution":{"observed_at":"2026-08-16T00:24:52.788718Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.766120Z","title":"Optimal bus splitting for short- circuit current limitation in metropolitan area,","venue":null,"work_id":"a9e22b24-97eb-4739-b221-1c6c318605a5","year":2013},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.262091Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:c15d99999b2a7cbbcf7f2ca5bbb7dd0682eaba611198d10eb33f5126b3362e6e","observation_id":"9755f316-8743-404c-ab22-8a2a6dabdd28","resolution":{"observed_at":"2026-08-16T00:24:52.771760Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.749833Z","title":"Review on optimization methodologies in transmission network reconfiguration of power systems for grid resilience,","venue":null,"work_id":"1c982c55-98e6-4a5e-9bfc-7656e7abe0a3","year":2021},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.268126Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:beb06044e0333eb36e6c3e63994b73168470007df396ee30e9922069e230685d","observation_id":"7e5a9f5d-66b6-4389-ade7-0dd9c718e3f8","resolution":{"observed_at":"2026-08-16T00:24:52.754469Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.734690Z","title":"The Role of Optimal Transmission Switching in Enhancing Grid Flexibility: A Review,","venue":null,"work_id":"11be10b3-16c0-49c9-bcf6-3ea81841ca30","year":2023},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.273174Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:94ade4cde619c84e5ca02b2fc14aac78f983b6ec173278a3a47e7c2b79129ca7","observation_id":"8d224deb-cc94-4fe8-a401-6f80920d75db","resolution":{"observed_at":"2026-08-16T00:24:52.739934Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.720317Z","title":"Optimal topology transition,","venue":null,"work_id":"26dea6e5-f384-4951-8b02-22c843f03691","year":2023},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.279040Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:c6d27d2cd75d55af0856e10096987ddda30bb25ff439edb8a1737cafdca99b0d","observation_id":"9d62d3cd-a1f6-4453-95ed-f435c4b6e037","resolution":{"observed_at":"2026-08-16T00:24:52.725132Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.703155Z","title":"Static Switching Security in Multi– Period Transmission Switching,","venue":null,"work_id":"87effe5a-17de-4ba2-a227-9d774a723581","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.284240Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:b4cc2d103e06bc00beb18365b7cf8ee1872c0c5e0d5f408fc6fa3fb3a98f7775","observation_id":"da910dd1-a030-4922-a4f5-672783a0195d","resolution":{"observed_at":"2026-08-16T00:24:52.708946Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2211.05612","last_updated":"2022-11-10T14:39:28Z","snapshot_observed_at":"2026-08-16T16:17:11.168699Z","submitted_at":"2022-11-10T14:39:28Z","title":"Power Grid Congestion Management via Topology Optimization with AlphaZero","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2211.05612","snapshot_observed_at":"2026-08-16T00:24:52.289461Z","title":"Power Grid Congestion Management via Topology Optimization with AlphaZero,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.289461Z"},"links":{"cited_paper":"/paper/2211.05612","citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:6203c89f8bf58ce947fe1c91f2bd175f849b550d0f94d73c929bb304457462b9","observation_id":"baa96e3e-c6e3-44b5-97ed-85a0e7bacef7","resolution":{"observed_at":"2026-08-16T00:24:52.289461Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.686787Z","title":"Subramanian, J","venue":null,"work_id":"00c82efb-b96e-420a-a7d5-0ef4cbb9c3e5","year":2020},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.294842Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:afcc5ceb72e659fc670105ccc4bea636e6f6ec699571c0c427e0c3d5819bb4f3","observation_id":"e07796eb-b8fc-4425-9280-4682b0e02dc6","resolution":{"observed_at":"2026-08-16T00:24:52.691521Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.672322Z","title":"Corrective model-predictive control in large electric power systems,","venue":null,"work_id":"f1e34ec0-afeb-4f38-8a16-9b25bd19f96d","year":2017},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.299653Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:661fd8a480572a9c60263b7ef3c559ece031e023cd38364234a454373772f286","observation_id":"952745fd-983a-431d-a4af-efba6c287b6c","resolution":{"observed_at":"2026-08-16T00:24:52.676813Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.656135Z","title":"Switching device-cognizant sequential distribution system restoration,","venue":null,"work_id":"d261fcdc-4bd8-40ff-89ee-fd3b7d2aa62f","year":2022},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.304514Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:76dfd7025d1090f374f6173798215d3bcb51d923467682a11aed07ba30463937","observation_id":"0ecdd735-0358-4a71-8a69-6ee88c5a37ec","resolution":{"observed_at":"2026-08-16T00:24:52.661031Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.640984Z","title":"Day-ahead transmission grid topology optimization considering renewable energy sources’ uncertainty,","venue":null,"work_id":"f2d629b1-1e2b-4aac-a27c-dd5447ceea91","year":2026},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.309134Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:a0aab5e0b8e34764cf5a732b2c8c0d12ae908d25a9b0e69bc96cb9dc51a76c0c","observation_id":"1ac906cc-e9f9-4f70-b7f6-f0700d05c28b","resolution":{"observed_at":"2026-08-16T00:24:52.645659Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.626430Z","title":"Tractable Transmission Topology Control Using Sensitivity Analysis,","venue":null,"work_id":"c6c6a350-a7de-4104-8163-4346632b8c77","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.313594Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:89e279cf24270ed976a10d4be115e508a13bc29faa9224b27ec01d8148fbe826","observation_id":"69a11f40-5cd9-40c5-b73b-d7fa036cfd57","resolution":{"observed_at":"2026-08-16T00:24:52.630708Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.612164Z","title":"Fast Heuristics for Transmission- Line Switching,","venue":null,"work_id":"95dc35e0-b564-40fb-bd8b-9146d2b5dd10","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.318251Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:1793692a7dad2742b6ebd15086ffb65aeb1832664ed1454fe0347851f41e925c","observation_id":"00f12560-136b-46ae-a85e-1e6c666bf223","resolution":{"observed_at":"2026-08-16T00:24:52.616671Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.599058Z","title":"On fast transmission topology control heuristics,","venue":null,"work_id":"32a3622c-dc01-403e-b414-fa47808aa085","year":2011},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.322793Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:0b8e5e1fa4697fa9fa3a95fe3084cbe50a9ff838ef6cfd6f66758a4ba34de208","observation_id":"fe4c1e9b-6d73-4d24-82fd-ec2e52766411","resolution":{"observed_at":"2026-08-16T00:24:52.603043Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.582718Z","title":"Heuristic Prescreening Switchable Branches in Optimal Transmission Switching,","venue":null,"work_id":"c50957f2-c2a6-42a1-9c82-ad4cadcdb095","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.327768Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:09472cad484ce35fd6ec2eee7f791457b5762925c2ef24bacc98769606c72f24","observation_id":"22617fec-0011-4e84-88e3-e81beeba7891","resolution":{"observed_at":"2026-08-16T00:24:52.588035Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.565739Z","title":"Computationally efficient optimal Transmission Switching: Solution space reduction,","venue":null,"work_id":"2c123b15-2153-455d-b8b2-6e8673d84c82","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.332029Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:0c1ba2ff67cbe49b827102b05b70d4abdb55030fdca34f2cfd5ecdc2f3b5fdd0","observation_id":"4889c7de-c1c5-45df-8bca-434056fc025c","resolution":{"observed_at":"2026-08-16T00:24:52.571355Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.543435Z","title":"Column Generation for Transmis- sion Switching of Electricity Networks with Unit Commitment,","venue":null,"work_id":"a0c3e13e-7ae2-497b-a96b-21f3118833ad","year":2011},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.336577Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:f725f63730494be6a7ee475024ba3853afe4ff25cc280144275c363c038462aa","observation_id":"5b0137b2-81f2-4693-90ca-60a78d1ef6e2","resolution":{"observed_at":"2026-08-16T00:24:52.548948Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.525081Z","title":"Optimal transmission congestion management by means of substation reconfiguration,","venue":null,"work_id":"63fcf587-2c4c-498d-b152-18370041b36b","year":2012},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.340811Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:4214cd096c9878e991cf982fae987169c80404cb3995aecf8b591fa27f26067e","observation_id":"e60aac7f-209f-4f36-8e39-b319e846a261","resolution":{"observed_at":"2026-08-16T00:24:52.530829Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.504164Z","title":"An optimal transmission line switching and bus splitting heuristic incorporating ac and n-1 contingency constraints,","venue":null,"work_id":"f38f719e-2cde-43e2-be43-d4d7ceca20ae","year":2021},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.345852Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:d81a4e2907577e8f5f2f0fb5bf3cfc1097680664712ed8de531a18f9c5e3d745","observation_id":"b075c305-8bb2-4e0d-aba5-5d623289ab57","resolution":{"observed_at":"2026-08-16T00:24:52.510878Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.488175Z","title":"A Bound Strengthening Method for Optimal Transmission Switching in Power Systems,","venue":null,"work_id":"ace8b2a9-9dd3-43ce-b151-24263978a4cf","year":2019},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.350324Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:4d863343fca9e4ee619ed8b8a5ad8b0ebd7e3638f4be4dfab60243499eba0cf8","observation_id":"add69c70-ca55-46be-ba52-414dbc244ebf","resolution":{"observed_at":"2026-08-16T00:24:52.493339Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.472543Z","title":"Security-Constrained Transmission Topol- ogy Control MILP Formulation Using Sensitivity Factors,","venue":null,"work_id":"7e6552f9-2843-4630-8f40-688e644d3e60","year":2016},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.354971Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:fa8d764b11bddd4d6a9a5abdf4add8c34af6663608350b8c0a5261196dec09fb","observation_id":"439f0268-46c2-4cfe-926e-07c15bfc1534","resolution":{"observed_at":"2026-08-16T00:24:52.477074Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.457558Z","title":"Learning-Based Topology Optimization of Power Networks,","venue":null,"work_id":"fa897050-d457-44f6-b580-c6963093ea02","year":2022},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.359143Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:c79194b006c82f6f14c5b6419e7822429d575dcd9183c67485a3c40010030072","observation_id":"8618d82e-7506-45be-93ce-9c5fd661370c","resolution":{"observed_at":"2026-08-16T00:24:52.461730Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T00:24:52.438180Z","title":"Real-time transmission switching with neural networks,","venue":null,"work_id":"6d76f5e8-5ca5-4c89-aff0-e76b5a4b5c01","year":2023},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.364416Z"},"links":{"citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:8123aadc653e303ca5b12a5ce0db39949e2f50d30419ab61953da2309f0beaa5","observation_id":"9cd20e3c-f691-4044-b54d-a554df33f3b6","resolution":{"observed_at":"2026-08-16T00:24:52.445252Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1908.02788","last_updated":"2021-01-04T18:52:39Z","snapshot_observed_at":"2026-08-15T04:21:38.596694Z","submitted_at":"2019-08-07T18:22:18Z","title":"The Power Grid Library for Benchmarking AC Optimal Power Flow Algorithms","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1908.02788","snapshot_observed_at":"2026-08-16T00:24:52.369131Z","title":"The power grid library for benchmarking ac optimal power flow algorithms,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-16T00:24:52.369131Z"},"links":{"cited_paper":"/paper/1908.02788","citing_paper":"/paper/2608.12047"},"observation_digest":"sha256:0fab198a3b398a76ca2f678b1cef26d126fd85fac20675e70218a1d321c4038b","observation_id":"f866d638-fd88-4606-9fd5-2c4b276c12ab","resolution":{"observed_at":"2026-08-16T00:24:52.369131Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2608.12047","last_updated":"2026-08-12T13:28:34Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-16T00:16:15.095001Z","submitted_at":"2026-08-12T13:28:34Z","title":"Network Topology Reconfiguration: Optimal Transition Planning"},"reference_resolution":{"displayed":30,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":2,"verified_exact":0,"verified_fuzzy":28},"total_outbound_references":30},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-17T06:30:58.91139+00:00","source":"crossref"},{"observed_at":"2026-08-17T06:30:54.323127+00:00","source":"retraction_watch"}],"thesis":"As of 17 August 2026, this Paper Citation Record lists 30 of 30 outbound references and 0 inbound Pith citation observations for arXiv:2608.12047."}