{"record_type":"pith_number_record","schema_url":"https://pith.science/schemas/pith-number/v1.json","pith_number":"pith:2024:BLZZD66LQLWXGZF5B2ZI4XD7C7","short_pith_number":"pith:BLZZD66L","schema_version":"1.0","canonical_sha256":"0af391fbcb82ed7364bd0eb28e5c7f17f5ebc60936e0fb8b170fa105fa8270e5","source":{"kind":"arxiv","id":"2412.08602","version":2},"attestation_state":"computed","paper":{"title":"Empirical Measurements of AI Training Power Demand on a GPU-Accelerated Node","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":[],"primary_cat":"cs.AR","authors_text":"Alex C. Newkirk, Arslan Munir, Imran Latif, Jonathan Koomey, Matthew R. Carbone, Xi Yu, Yuewei Lin, Zhiuha Dong","submitted_at":"2024-12-11T18:19:07Z","abstract_excerpt":"The expansion of artificial intelligence (AI) applications has driven substantial investment in computational infrastructure, especially by cloud computing providers. Quantifying the energy footprint of this infrastructure requires models parameterized by the power demand of AI hardware during training. We empirically measured the instantaneous power draw of an 8-GPU NVIDIA H100 HGX node during the training of open-source image classifier (ResNet) and large-language models (Llama2-13b). The maximum observed power draw was approximately 8.4 kW, 18% lower than the manufacturer-rated 10.2 kW, eve"},"verification_status":{"content_addressed":true,"pith_receipt":true,"author_attested":false,"weak_author_claims":0,"strong_author_claims":0,"externally_anchored":false,"storage_verified":false,"citation_signatures":0,"replication_records":0,"graph_snapshot":true,"references_resolved":false,"formal_links_present":false},"canonical_record":{"source":{"id":"2412.08602","kind":"arxiv","version":2},"metadata":{"license":"http://creativecommons.org/licenses/by/4.0/","primary_cat":"cs.AR","submitted_at":"2024-12-11T18:19:07Z","cross_cats_sorted":[],"title_canon_sha256":"7dc656dfb6ef4dcb0513a0f18f1380a059116b4ea2d3f8173f038aacd5ae7a32","abstract_canon_sha256":"a1095c57f50b325f956f30422b3e01546c902079be100309f6330ed37d43d398"},"schema_version":"1.0"},"receipt":{"kind":"pith_receipt","key_id":"pith-v1-2026-05","algorithm":"ed25519","signed_at":"2026-07-05T10:38:22.216076Z","signature_b64":"69QLSoJnybCmNCSzevTrDcHWI6DUPPIYe9OYWuLFfFQx+WOYwX2QUnjRgwhFFuxU7UK+C6iBkW+HddwDztI7DA==","signed_message":"canonical_sha256_bytes","builder_version":"pith-number-builder-2026-05-17-v1","receipt_version":"0.3","canonical_sha256":"0af391fbcb82ed7364bd0eb28e5c7f17f5ebc60936e0fb8b170fa105fa8270e5","last_reissued_at":"2026-07-05T10:38:22.215610Z","signature_status":"signed_v1","first_computed_at":"2026-07-05T10:38:22.215610Z","public_key_fingerprint":"8d4b5ee74e4693bcd1df2446408b0d54"},"graph_snapshot":{"paper":{"title":"Empirical Measurements of AI Training Power Demand on a GPU-Accelerated Node","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":[],"primary_cat":"cs.AR","authors_text":"Alex C. Newkirk, Arslan Munir, Imran Latif, Jonathan Koomey, Matthew R. Carbone, Xi Yu, Yuewei Lin, Zhiuha Dong","submitted_at":"2024-12-11T18:19:07Z","abstract_excerpt":"The expansion of artificial intelligence (AI) applications has driven substantial investment in computational infrastructure, especially by cloud computing providers. Quantifying the energy footprint of this infrastructure requires models parameterized by the power demand of AI hardware during training. We empirically measured the instantaneous power draw of an 8-GPU NVIDIA H100 HGX node during the training of open-source image classifier (ResNet) and large-language models (Llama2-13b). The maximum observed power draw was approximately 8.4 kW, 18% lower than the manufacturer-rated 10.2 kW, eve"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2412.08602","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2412.08602/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"},"aliases":[{"alias_kind":"arxiv","alias_value":"2412.08602","created_at":"2026-07-05T10:38:22.215670+00:00"},{"alias_kind":"arxiv_version","alias_value":"2412.08602v2","created_at":"2026-07-05T10:38:22.215670+00:00"},{"alias_kind":"doi","alias_value":"10.48550/arxiv.2412.08602","created_at":"2026-07-05T10:38:22.215670+00:00"},{"alias_kind":"pith_short_12","alias_value":"BLZZD66LQLWX","created_at":"2026-07-05T10:38:22.215670+00:00"},{"alias_kind":"pith_short_16","alias_value":"BLZZD66LQLWXGZF5","created_at":"2026-07-05T10:38:22.215670+00:00"},{"alias_kind":"pith_short_8","alias_value":"BLZZD66L","created_at":"2026-07-05T10:38:22.215670+00:00"}],"events":[],"event_summary":{},"paper_claims":[],"inbound_citations":{"count":5,"internal_anchor_count":1,"sample":[{"citing_arxiv_id":"2607.05993","citing_title":"Bit2Watt: A Cyber-Physical Vulnerability Exploiting GPU Workloads Across Power and Computing Infrastructures","ref_index":9,"is_internal_anchor":true},{"citing_arxiv_id":"2508.16457","citing_title":"Wide-Area Power System Oscillations from Large-Scale AI Workloads","ref_index":24,"is_internal_anchor":false},{"citing_arxiv_id":"2605.14109","citing_title":"Grid Integration of Gigawatt-Scale AI Data Centers under Connect-and-Manage","ref_index":22,"is_internal_anchor":false},{"citing_arxiv_id":"2604.18392","citing_title":"Composite Control of Grid-Following Inverters for Stabilizing AI-Induced Fast Power Disturbances","ref_index":2,"is_internal_anchor":false},{"citing_arxiv_id":"2604.07345","citing_title":"Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning","ref_index":14,"is_internal_anchor":false}]},"formal_canon":{"evidence_count":0,"sample":[],"anchors":[]},"links":{"html":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7","json":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7.json","graph_json":"https://pith.science/api/pith-number/BLZZD66LQLWXGZF5B2ZI4XD7C7/graph.json","events_json":"https://pith.science/api/pith-number/BLZZD66LQLWXGZF5B2ZI4XD7C7/events.json","paper":"https://pith.science/paper/BLZZD66L"},"agent_actions":{"view_html":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7","download_json":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7.json","view_paper":"https://pith.science/paper/BLZZD66L","resolve_alias":"https://pith.science/api/pith-number/resolve?arxiv=2412.08602&json=true","fetch_graph":"https://pith.science/api/pith-number/BLZZD66LQLWXGZF5B2ZI4XD7C7/graph.json","fetch_events":"https://pith.science/api/pith-number/BLZZD66LQLWXGZF5B2ZI4XD7C7/events.json","actions":{"anchor_timestamp":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7/action/timestamp_anchor","attest_storage":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7/action/storage_attestation","attest_author":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7/action/author_attestation","sign_citation":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7/action/citation_signature","submit_replication":"https://pith.science/pith/BLZZD66LQLWXGZF5B2ZI4XD7C7/action/replication_record"}},"created_at":"2026-07-05T10:38:22.215670+00:00","updated_at":"2026-07-05T10:38:22.215670+00:00"}