pith. sign in

Eric J. E. Molin

Identifiers

  • name variant Eric J. E. Molin 0.60 · backfill

Papers (4)

  1. Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects q-fin.GN · 2013 · author #3
  2. Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases q-fin.GN · 2013 · author #2
  3. Lock-in and Its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects. Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns q-fin.GN · 2013 · author #4
  4. Cost overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness q-fin.GN · 2013 · author #3

Mentions

  • 1307.2179 #3 · backfill · confidence 0.70 Eric J. E. Molin
  • 1307.2178 #2 · backfill · confidence 0.70 Eric J. E. Molin
  • 1307.2177 #4 · backfill · confidence 0.70 Eric J. E. Molin
  • 1307.2176 #3 · backfill · confidence 0.70 Eric J. E. Molin

Frequent Coauthors