pith. sign in

F. Rethore

Identifiers

  • name variant F. Rethore 0.60 · backfill

Papers (2)

  1. Design and performance of the LHCb trigger and full real-time reconstruction in Run 2 of the LHC hep-ex · 2018 · author #104
  2. Implications of LHCb measurements and future prospects hep-ex · 2012 · author #567

Mentions

  • 1208.3355 #567 · backfill · confidence 0.70 F. Rethore

Frequent Coauthors