AI data center temporal and spatial flexibility reduces grid investment and operational costs by 3-21% in some locations and load conditions but does not consistently lower required generation capacity and shows diminishing returns beyond certain deferral times.
Title resolution pending
1 Pith paper cite this work. Polarity classification is still indexing.
1
Pith paper citing it
fields
eess.SY 1years
2026 1verdicts
UNVERDICTED 1representative citing papers
citing papers explorer
-
To Defer or To Shift? The Role of AI Data Center Flexibility on Grid Interconnection
AI data center temporal and spatial flexibility reduces grid investment and operational costs by 3-21% in some locations and load conditions but does not consistently lower required generation capacity and shows diminishing returns beyond certain deferral times.