Space charge and intra-beam scattering set a hard floor of about 10 pm on the emittance of 6 GeV MBA light sources, so further brightness gains require higher beam energy.
LCLS-II-HE verification cryomodule high gradient performance and quench behavior
1 Pith paper cite this work. Polarity classification is still indexing.
abstract
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen doping treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.
fields
physics.acc-ph 1years
2025 1verdicts
CONDITIONAL 1representative citing papers
citing papers explorer
-
Beam Intensity Limitations in Future Multi-Bend Achromat Light Sources
Space charge and intra-beam scattering set a hard floor of about 10 pm on the emittance of 6 GeV MBA light sources, so further brightness gains require higher beam energy.