The CMS silicon strip tracker operated stably through Runs 1 and 2, with a readout saturation issue understood and fixed in 2016, and radiation damage models projecting survival to 500 inverse femtobarns.
Track reconstruction with cosmic ray data at the tracker integration facility
1 Pith paper cite this work. Polarity classification is still indexing.
1
Pith paper citing it
citation-role summary
background 1
citation-polarity summary
fields
physics.ins-det 1years
2025 1verdicts
ACCEPT 1roles
background 1polarities
support 1representative citing papers
citing papers explorer
-
Operation and performance of the CMS silicon strip tracker with proton-proton collisions at the CERN LHC
The CMS silicon strip tracker operated stably through Runs 1 and 2, with a readout saturation issue understood and fixed in 2016, and radiation damage models projecting survival to 500 inverse femtobarns.