Pith. sign in

Title resolution pending

1 Pith paper cite this work. Polarity classification is still indexing.

1 Pith paper citing it

fields

math.ST 1

years

2026 1

verdicts

ACCEPT 1

representative citing papers

Universality of e-detectors for ARL control

math.ST · 2026-08-12 · accept · novelty 8.0

Any stopping time with expected alarm time at least b is the level-b crossing of a weak e-detector, and any stopping time satisfying optional-horizon false-alarm control is the level-b crossing of a strong e-detector.

citing papers explorer

Showing 1 of 1 citing paper.

  • Universality of e-detectors for ARL control math.ST · 2026-08-12 · accept · none · ref 29

    Any stopping time with expected alarm time at least b is the level-b crossing of a weak e-detector, and any stopping time satisfying optional-horizon false-alarm control is the level-b crossing of a strong e-detector.