Sizing a distributed generator to cover the gap between peak and assumed base metro demand raises the computed load factor from 53% to 73% by construction.
Molderink, Demand-Side Energy Management, University of Twente, Enschede, Netherlands
1 Pith paper cite this work. Polarity classification is still indexing.
1
Pith paper citing it
citation-role summary
background 1
citation-polarity summary
fields
eess.SY 1years
2025 1verdicts
REJECT 1roles
background 1polarities
unclear 1representative citing papers
citing papers explorer
-
Quantitative Indices for Improving Metro Load Curve, Using Distributed Generation
Sizing a distributed generator to cover the gap between peak and assumed base metro demand raises the computed load factor from 53% to 73% by construction.