Optimization of Integrated Luminosity of the Fermilab Tevatron Collider
read the original abstract
We present the strategy which has been used recently to optimize integrated luminosity at the Fermilab Tevatron proton-antiproton collider. We use a relatively simple model where we keep the proton intensity fixed, use parameters from fits to the luminosity decay of recent stores as a function of initial antiproton intensity (stash size), and vary the stash size to optimize the integrated luminosity per week. The model assumes a fixed rate of antiproton production, that a store is terminated as soon as the target stash size for the next store is reached, and that the only downtime is due to store turn-around time. An optimal range of stash sizes is predicted. Since the start of Tevatron operations based on this procedure, we have seen an improvement of approximately 35% in integrated luminosity. Other recent operational improvements have been achieved by decreasing the shot-setup time and by reducing beam-beam effects by making the proton and antiproton brightnesses more compatible, for example by scraping protons to smaller emittances.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.