Recognition: unknown
Commissioning And First Results From The Fermilab Cryomodule Test Stand
classification
⚛️ physics.acc-ph
keywords
cryomodulefermilabfirsttestcmts1commissioningresultsstand
read the original abstract
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.