Optimal Future Sub-Transmission Volt-Var Planning Tool to Enable High PV Penetration

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1910.10934 v1 pith:YLU3IPN6 submitted 2019-10-24 eess.SY cs.SY

classification eess.SYcs.SY
keywords planningtoolsub-transmissionvoltagedecisionfinalhighinvestment
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

This paper proposes a reactive power planning tool for sub-transmission systems to mitigate voltage violations and fluctuations caused by high photovoltaic (PV) penetration and intermittency with a minimum investment cost. The tool considers all existing volt-ampere reactive (var) assets in both sub-transmission and distribution systems to reduce the need of new equipment. The planning tool coordinates with an operational volt-var optimization tool to determine all scenarios with voltage violations and verify the planning results. The planning result of each scenario is the solution of a proposed optimal power-flow framework with efficient techniques to handle a high number of discrete variables. The final planning decision is obtained from the planning results of all selected violated scenarios by using two different approaches - direct combination of all single-step solutions and final investment decision based only on the scenarios that are representative for the power-flow voltage violations at most time steps. The final planning decision is verified using a realistic large-scale sub-transmission system and 5-minute PV and load data. The results show a significant voltage violation reduction with a less investment cost for additional var equipment compared to conventional approaches.