Pith. sign in

REVIEW

Switching Transients in Constrained Transformer-Line/Cable Configurations

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2504.21594 v1 pith:MD6JKIUV submitted 2025-04-30 eess.SY cs.SY

classification eess.SYcs.SY
keywords transformercablecaseconnectedenergizationenergizedpowerbehind
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

This paper investigates the transient phenomena that occur in two special cases in the Netherlands: (A) during the energization of a power transformer via a cable feeder and (B) the energization of a power transformer together with an overhead line (OHL). In Case A a 7 km long 150 kV cable and a 150/50 kV transformer are connected and energized at the same time. In Case B a 150/50 kV transformer and a short 50 kV OHL are connected and energized simultaneously. The reason behind this kind of situations is related to space restrictions and cost efficiency.

Discussion (0). Sign in to comment.

Pith tools