Pith. sign in

REVIEW

DAFNE operation with the FINUDA experiment

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv physics/0408073 v1 pith:TODSZM47 submitted 2004-08-16 physics.acc-ph

classification physics.acc-ph
keywords finudadafnebeendetectorexperimentoperationothershut-down
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

DAFNE operation restarted in September 2003, after a six month shut-down for the installation of FINUDA, a magnetic detector dedicated to the study of hypernuclear physics. FINUDA is the third experiment running on DAFNE and operates while keeping on place the other detector KLOE. During the shut-down both Interaction Regions have been equipped with remotely controlled quadrupoles in order to operate at different solenoid fields. Among many other hardware upgrades one of the most significant is the reshaping of the wiggler pole profile to improve the field quality and the machine dynamic aperture. Commissioning of the collider in the new configuration has been completed in short time. The peak luminosity delivered to FINUDA has reached 6 10^31 s-1cm-2, with a daily integrated value close to 4 pb-1.

Discussion (0). Continue with ORCID to comment.

Pith tools