pith. sign in

arxiv: physics/0605158 · v1 · submitted 2006-05-18 · ⚛️ physics.ins-det

BEPCII/BESIII Upgrade and the Prospective Physics

classification ⚛️ physics.ins-det
keywords bepciibesiiidetectorupgradebeginningcommissiondescribeddesigned
0
0 comments X
read the original abstract

The Status of BEPCII/BESIII upgrade is described, BEPCII is designed to reach a luminosity of $10^{33}/cm^{-2}s^{-1}$ at c. m. energy of 3.89GeV, and BESIII detector is fully rebuilt. The project is on track and is progressing well. The machine and detector are expected to commission together at the late half of 2007, and start to take some engineer run end of 2007 or beginning of 2008.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.