arxiv 1502.01703 v1 pith:IXQ6QI3W submitted 2015-02-05 physics.acc-ph

classification physics.acc-ph
keywords acceleratorlebtmebtpxiestatuswarmassembledbunch
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.