Installation Progress At The PIP-II Injector Test At Fermilab

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1701.01078 v1 pith:HCIB7WWU submitted 2017-01-04 physics.acc-ph

classification physics.acc-ph
keywords pip-iitestacceleratorbeamenergyfermilabinjectorinstallation
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.