LLRF controls in SuperKEKB Phase-1 commissioning

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1803.09037 v1 pith:SOCYHBGN submitted 2018-03-24 physics.acc-ph

classification physics.acc-ph
keywords phase-1commissioningsuperkekbbeenllrfoperationstationssystem
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the desired beam current for Phase-1 was achieved in both rings. This paper summarize the operation results related to low level RF (LLRF) control issues during the Phase-1 commissioning, including the system tuning, the coupled bunch instability and the bunch gap transient effect. RF system of SuperKEKB consists of about thirty klystron stations in both rings. Newly developed LLRF control systems were applied to the nine stations among the thirty for Phase-1. The RF reference signal distribution system has been also upgraded for SuperKEKB. These new systems worked well without serious problem and they contributed to smooth progress of the commissioning. The old existing systems, which had been used in the KEKB operation, were still reused for the most stations, and they also worked as soundly as performed in the KEKB operation.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. Laser Synchronisation Over One Hundred Kilometers With Stability at Picosecond Scale

    physics.acc-ph 2026-02 conditional novelty 5.0 of 10

    A White-Rabbit-based system synchronized a commercial pulsed laser to a reference clock with ~5.5 ps RMS long-term stability over 100 km of fiber.

Pith tools