Pith. sign in

REVIEW

The Magnetic Compensation Scheme of the FCC-ee Detectors

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2101.05704 v2 pith:6X6LBYDO submitted 2021-01-14 physics.acc-ph

classification physics.acc-ph
keywords emittanceperformancefcc-eeringbeamblow-upcasedesign
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

A crucial part of the design of an FCC-ee detector is the minimisation of the disruption of the beam due to the presence of a large and powerful detector magnet. Indeed, the emittance blow-up of the few meters around the interaction point (IP) at lower energies is comparable to the emittance introduced by the rest of the 100 km ring. Vertical emittance is the single most important factor in achieving high performance (luminosity, in this case) in a modern e^+ e^- storage ring such as the FCC-ee. The design adopted is the simplest possible arrangement that can nevertheless deliver high performance: two additional coils per IP side. The performance achieved is such that vertical emittance blow-up will not be a limiting performance factor even in the case of a ring with four experiments, and even in the most demanding energy regime, that of the Z running (about 45 GeV beam energy).

Discussion (0). Continue with ORCID to comment.

Pith tools