Pith. sign in

REVIEW

Parallel Path Progression DAG Scheduling

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2208.11830 v1 pith:HXR3CIV7 submitted 2022-08-25 cs.DC

classification cs.DC
keywords schedulingparallelalgorithmstaskanalysespathprogressionresponse
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

To satisfy the increasing performance needs of modern cyber-physical systems, multiprocessor architectures are increasingly utilized. To efficiently exploit their potential parallelism in hard real-time systems, appropriate task models and scheduling algorithms that allow providing timing guarantees are required. Such scheduling algorithms and the corresponding worst-case response time analyses usually suffer from resource over-provisioning due to pessimistic analyses based on worst-case assumptions. Hence, scheduling algorithms and analysis with high resource efficiency are required. A prominent parallel task model is the directed-acyclic-graph (DAG) task model, where precedence constrained subjobs express parallelism. This paper studies the real-time scheduling problem of sporadic arbitrary-deadline DAG tasks. We propose a path parallel progression scheduling property with only two distinct subtask priorities, which allows to track the execution of a collection of paths simultaneously. This novel approach significantly improves the state-of-the-art response time analyses for parallel DAG tasks for highly parallel DAG structures. Two hierarchical scheduling algorithms are designed based on this property, extending the parallel path progression properties and improving the response time analysis for sporadic arbitrary-deadline DAG task sets.

Discussion (0). Continue with ORCID to comment.

Pith tools