Pith. sign in

Paper Citation Record · LEDGER

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case

As of 17 August 2026, this Paper Citation Record lists 13 of 13 outbound references and 0 inbound Pith citation observations for arXiv:2502.09748.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2502.09748 v1

Coverage vector

measured 13 of 13 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-07T20:40:21.422927Z

measured 13 of 13 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-17T06:30:58.91139+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

13 of 13 outbound references displayed

  • verified exact0
  • verified fuzzy13
  • unresolved0
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation 27e66604-c27f-484f-bb4b-33291893a77a · outbound

This paper cites capaciteitkaart.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case capaciteitkaart

Reference 1

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.582629Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.381819Z digest=sha256:d2d1bd1717a4bcecded49a15600d74c0955ac7b9378cd720e94eac592d772d10

Observation e019b4e8-a732-4484-bd83-c3899d641429 · outbound

This paper cites The role of standalone hydro- gen areas in decentral hydrogen infrastructure development,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case The role of standalone hydro- gen areas in decentral hydrogen infrastructure development,

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.571470Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.385831Z digest=sha256:55290e294b2e2f0393cc668a0612cc7068851fe30c24c4794280056c967e797c

Observation 10d860fd-38ea-4b0d-88fe-9f5a3b7d0694 · outbound

This paper cites Het energiesysteem van de toekomst: de II3050-scenario’s,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Het energiesysteem van de toekomst: de II3050-scenario’s,

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.560696Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.389305Z digest=sha256:28905e7a469d4ba48cab2b38ff4e010dc8abfbcdfad828adc58d40e43ceb5235

Observation 5b2117c7-56b8-44b1-8026-af3675b4d6b3 · outbound

This paper cites Codebesluit congestiemanagement | ACM.nl.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Codebesluit congestiemanagement | ACM.nl

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.539557Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.396120Z digest=sha256:e0461753f6bf71ce230775c447086e1de8b13bbea1da9ef5a8e36877a708e2de

Observation 875a4319-fa7f-4909-8316-a88339e037de · outbound

This paper cites The Activation of congestion service contracts for budget-constrained congestion management,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case The Activation of congestion service contracts for budget-constrained congestion management,

Reference 5

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.530049Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.399704Z digest=sha256:db33f53c7e5d6c1e3d74f29e378ef2fb81d9948364cd57673fbde7630a07da61

Observation 58c60229-ad52-489d-8783-937bd69e0f7a · outbound

This paper cites Comprehensive congestion management for distribution networks based on dynamic tariff, reconfiguration, and re-profiling product,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Comprehensive congestion management for distribution networks based on dynamic tariff, reconfiguration, and re-profiling product,

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.520180Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.403328Z digest=sha256:0451d56cc45a3a33bbfec1ec823e047f6caf35ddb250e05968d6b141b529a94e

Observation feb1d715-038f-457c-8470-5e5c8bcfc8ac · outbound

This paper cites Non-Firm grid connections for low-voltage generators: A case study in France,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Non-Firm grid connections for low-voltage generators: A case study in France,

Reference 7

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.509233Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.406874Z digest=sha256:19a923b1c1928e0bf18851afd5adcefc547b6e6afd67cd043d007c626d8cc9c5

Observation 08bad705-c723-4d1b-99cb-00d3e7cad7ba · outbound

This paper cites Optimization for non-firm capacity contracts for maximized grid utilization,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Optimization for non-firm capacity contracts for maximized grid utilization,

Reference 8

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.497193Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.409971Z digest=sha256:ea50d657472d09ed0385028eefa57ad9f8661069cdb049ae75368decf96916db

Observation 8686304a-b2f2-47e3-93f8-164f35dd20c6 · outbound

This paper cites Consultatie al- ternatieve transportrechten: use it or lose it,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Consultatie al- ternatieve transportrechten: use it or lose it,

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.485684Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.413196Z digest=sha256:cc5ea3406084043a4bdcf49a399c93979b84a3ea55b139fa721c0d9596ac5901

Observation bee48ae0-2560-4af2-8d58-e08278a79c96 · outbound

This paper cites Why there is no need to use a big-M in linear bilevel optimization: A computational study of two ready-to-use approaches,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Why there is no need to use a big-M in linear bilevel optimization: A computational study of two ready-to-use approaches,

Reference 10

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.462924Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.419766Z digest=sha256:865f86fb6fdc76ae06143ec52f6577350ca002a6e009c0aab713de06a8f54930

Observation 9539cdd0-0e52-46a8-bff2-e6ba93f66bff · outbound

This paper cites Current status of water electrolysis for energy storage, grid balancing and sector coupling via power-to-gas and power-to-liquids: A review,.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Current status of water electrolysis for energy storage, grid balancing and sector coupling via power-to-gas and power-to-liquids: A review,

Reference 11

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.452317Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.422927Z digest=sha256:6a437278bec99256f540a9bf5fb8b87ce38f3e61564eb45b183c4dcab2bf407c

Observation dc5ebcc0-fb7b-4f7e-9ad9-704a486ff675 · outbound

This paper cites Accessed January 25, 2025.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Accessed January 25, 2025

Reference 2022

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.474339Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.416559Z digest=sha256:8bfff2b8d9d8068b1330294bdc24fa8d2bd7474f5f5470f6fded419296c65ee4

Observation 3829659d-6a62-4eca-bf36-0a0736e8bee6 · outbound

This paper cites Accessed January 25, 2025.

Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case Accessed January 25, 2025

Reference 2023

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T20:40:21.549402Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-17T06:30:58.91139+00:00.

source=pdf_text observed=2026-08-07T20:40:21.392732Z digest=sha256:a678153a254b9987c580a8b03a8f123c55448cd4d8d4dfa7e22980bea05734d4

Pith citing papers

No inbound Pith citation observations are available.